Day 184 - Shop Concrete Slab + BBQ

BPo3 Homestead
90 followers
2 Video Views·Jul 15, 2025
The day for concrete arrived, and it was such a beautiful day. The crew came on a Wednesday to complete the forms, and the concrete was poured and finished the following day. I included one sewer out, one water in, and two 2" conduit stub outs for future expansion in the concrete.
On the form day, I stayed out on the property to smoke a pair of Boston butts for pulled pork. Sitting around a firebox while stretched out on a zero gravity chair with the sound of nature in full swing and the brisk evenings of fall setting in.....ahhh, such a relaxing time. On concrete day, I cooked 10lbs of garlic parmesan mashed potatoes. Zero complaints from the crew.
Email: [email protected]
[Music]
BL that's
right it's been a uh productive and busy
kind of crazy past few days the concrete
forms were just installed this morning
which I'll show you that in just a
second
yesterday I don't know the order
operations when I'm publishing these
videos or not so you may or may not
already know this but yesterday I spread
out 50 yards of concrete wash out and I
don't know what the original price is or
if that was a deal that was cut because
I got so much of it I don't know but 50
yards was
$400 and
it's the the concrete wash out it's it's
you know it's it's this
powdery I guess concrete stuff with
rocks in it some large rocks but mostly
pretty good stuff in it it packs really
hard the problem is people say that it
packs really good but it also washes
away very quickly and easily so uh that
was just the base layer we put down
we've got another guy lined up to um to
lay down some gravel starting tonight uh
he he does this on the side so it's
going to be kind of a spread out ordeal
putting the the gravel down but that's
fine because he's going to actually uh
you know you lift up the back of the
truck on the dump bed or whatever and
open the gate just slightly and drive
away as it's all coming out you know and
evenly spreads it right from the truck
which
is awesome it's going to save me so much
time this 50 yards took me 7 hours to
spread out on the driveway with my
tractor mainly because I had one load
dumped here at the end of the driveway
and then one load dumped at the front of
the driveway and it's kind of like I
would pull a little bit from this side
pull a little pull a little pull little
then I go to the other side pull a
little pull little pull little
eventually met in the middle and it's
packing down quite well just driving
over it today and whatnot but it's going
to be it's going to be nice to have
actually have the gravel down so that's
going on right now uh the forms were
installed for the concrete like I said
today tomorrow morning 7:00 the guys are
going to get here and hope he said
hopefully by 7:15 the concrete trucks
will be rolling so it'll be an early day
tomorrow to get going with that
that's going to be super productive I've
got the smoker going I don't know if you
noticed the mess in the background I got
to I got to wash up this table real
quick but I just put two Boston butts on
the smoker and I'm going to be smoking
these until
probably 9 or 10:00 tonight it's
currently 3:30 p.m. so I'm getting a
late start to it but it's either get a
late start or wake up ridiculously early
so these will be about 4 hours in the
smoke and then I'll wrap them and I'll
switch my wood over to some just generic
wood that's I don't care about smoking
once they're wrapped and um we'll finish
off the cook a little bit hot and fast
so usually it's about 6 hours when I do
Boston butts 4 hours in the smoke and
about 2 hours or so wrapped up I usually
get about uh 20° fah per
hour in tin foil and wrapped in foil so
that's usually about
160° when I wrap them and then about 200
or so when they're ready to be pulled
they won't be pulled tonight I'll take
them off the smoker 9 or 10:00 tonight
something like that and then I will put
them right into a cooler I'll probably
vent them for about 10 minutes just to
get the the excessive heat off so they
stop cooking I'll put them in a nice
cooler that really really maintains
temperatures overnight and then about 5
or 6 in the morning I'll wake up spread
these put it in a crock pot on warm and
then I'll come out here to record the
guys with the concrete and then my wife
will bring the the uh crock poot around
10:00 a.m. and they'll be able to eat
lunch we're going to do pulled pork
sandwiches and some garlic parmesan
mashed potatoes and I've I've got a
little burner set up here so I'll do
that right before they eat so it's going
to be a busy busy Whirlwind of a day
tomorrow actually the next 24 24 hours
starting now until
about excuse me about 300 p.m. tonight
um I was just eating sunflower seeds I
feel like I got whole mouthful of shells
uh let's let's look at the forms show
you the concrete form the shop is a 40x
60 shop so 40 in this 40 in this
direction 60 in that direction and right
here in the middle on this end is going
to be a 12T X 12T rollup
door on this side and then over here
we've got four
Piers uh 20t Span in between and the
peers are going to be for a lean to so
the lean to will be 20 ft by 60 ft in
that direction as well underneath the
lean two we're going to have six windows
I want all the windows underneath the
lean to to reduce or eliminate future
water
leaks um there's not going to be any
Windows on this side that side or that
side and I know some people are like
that's ridiculous you want to have some
natural light coming in blah blah blah
blah blah no I don't I mean yes it would
be great but ultimately the windows on
this side is going to be fine for just
natural light uh we're going to have
lights in the shop anyway and I just i'
I've dealt with leaky windows in the
past on shops I'm not doing it again I'm
totally fine not having Windows because
I would rather
eliminate leaking
opportunities uh so there's that that
and it's also my shop so I get the final
say so so
n uh this electrical conduit Stout is
just future proofing it's just
terminates right there it's uh capped
off on both sides with a couple um
gloves I didn't have any caps so I'm
using gloves for everything I don't have
any tape either so this one's Just for
future expansion or whatever if for
whatever reason I needed some electrical
out here on this area I could pull off
from the Electrical uh in the shop and
run through this conduit and run
underground so just future proofing
right there on this side over here we're
kind of future proofing as well with
another one of those um I don't have any
plans for electricity outside the shop
but that's not to say that I won't need
it in the future so there's that the
electrical service in
is over there man it's hard to see on
this screen maybe I should just point in
real life that's the ground Mount
Transformer they're going to go
underground to this corner of the shop
on that wall back there so right
somewhere right there we will have the
meter base set on the side of the shop
and directly on the inside of the shop
from right there is where the breaker
panel is going to be so on that side of
that so it doesn't get in the way of the
service into the shop I've got another
one of these Electrical uh conduit stub
outs so if in the future I wanted to do
something over there with El electricity
I could come off this shop panel out of
here trench over to there whatever and
that'll be
fine uh so that's that's that and then
on this
side this corner over
here uh we have the only sewer
out and the only water in so this piece
of of pecs is my water in I'll have to
tie back into this after they get the
shop done and whatnot
uh and then this pipe goes down and it's
just capped off right there the advanced
treatment facility not a septic tank
they're slightly different um it's going
to be right here somewhere the they'll
figure all that out and then we're going
to have the the um drain lines wherever
I don't care if they go this way I don't
care if they go that way we just got to
stay out of the driveway and there's
that so I already talked to the septic
guy he already came out here and looked
at it everything looked to be fine so
he's good oh there's my tape measure I
was looking
for here we go I've had this tape
measure
for many many years it's
uh it's a reliable tape measure uh what
else what else oh so the water we've
just got it you know gone off over there
a little bit but what I'm going to do is
after the shop is built I'm going to tie
in I'm going to actually probably after
the um
concrete pad is poured so maybe later
this week I'll bring this side over here
back to the wall and I'm going to trench
down and I'll I'll just dig this out
myself it's all sand you know it's easy
stuff but I'll I'll run the water supply
line down up against the side of the
foundation over here and the water
supply I will have to oh there goes my
alarm to add
more uh sticks to the fire on the smoker
but I'm going to take the water down to
here
where I have my trench right there with
1in PVC so I got 1in PVC buried up to
that green rubber glove right
there excuse me so I'll connect the dots
here and yeah starting to get super real
and I love it I absolutely love it this
smoker doesn't take much fuel at
all at all to run
so we're chugging
along between uh 250 and 300 I don't
care specifically what temperature it is
just stay between 250 and 300 that's
good enough for me this is a Shirley
Fabrications 24x 36 offset reverse flow
smoker it's their patio model so if you
want something without a ridiculous
weight time uh there you go I think
they're custom builds surely fabrication
does custom stuff too I think they're
custom line is like 3 years waiting list
something crazy like that they do a
really good job um but I purchased this
back
2021 2022 maybe I don't know it it
really needs a refinish job I need to
sand this down or scrape off all the
rust and whatnot and and uh paint it
with some new high temp paint but that's
planned for after the shop is built and
I have a place to work on stuff we just
now got it to the property um last
weekend so that brings me to a
question would you guys like to see some
cooking videos I love to cook I'm I've
always been the cook of the
house
and I love to do anything on this I love
to be outside just sitting around a hot
Firebox putting some logs on well with
this thing it's like kindling you know
doesn't take much fire at all to keep it
going but you guys want to see some
cooking videos
maybe some uh in-depth full Cooks rather
than just saying hey I'm cooking on it
let me know 3 hours and 35 minutes into
the cook it is what time is it 6:56
p.m.
7:00 I hoping to be done by
9: but it's probably looking more like
uh 10 before I'm done so I'm about to
lose light completely I've got one
flashlight out here that's a DeWalt
battery flashlight so I've got plenty of
light
just got to keep it far enough away from
me for the
bugs and
um life is good it is nice out here
listening to the birds listening to the
bugs the frogs playing chest on my
phone life is good and it's that perfect
temperature right it's the beginning of
fall so I think the lad tonight's like
50 something degrees it's probably uh
right at 70 right now so I'm about to
get my jacket
it's nice it's
nice 705
a.m. here comes the first
one wonder how many it's going to take I
have no idea
[Applause]
And So It
Begins I think they're going to do the
piers
first could be
wrong yeah looks like they are
[Music]
[Music]
[Music]
[Applause]
[Music]
a
[Applause]
[Music]
[Applause]
[Music]
[Applause]
[Music]
7:33 a.m. there's two trucks here I
don't know how many it's going to take I
asked him and he said he's he's shooting
for 40 yards of concrete but the cers
May uh f it off a little bit because the
forms are a little bit bigger than what
they had wanted which is fine by me it
just means it's bigger concrete chunk
for the
pure
um this is so cool so cool
yeah I don't know what to say so cool
[Music]
[Music]
[Music]
go go go
[Music]
all right truck number three is being
emptied 7:49
a.m. and uh they're working like a well
oiled machines no no one's being told
what to do everyone is just doing you
know what I'm saying I guess it's a good
sign of a good crew everyone's
everyone's just working it's
great it's also a little bit weird oh
here comes truck four it's also a little
bit weird watching other people work
with a camera I I I kind of feel like
I don't know it just it just feels weird
watching other people work and not doing
anything about it
[Applause]
[Music]
a
[Music]
[Applause]
oh oh
[Music]
[Applause]
[Music]
[Music]
oh
[Music]
[Music]
oh
[Music]
[Applause]
[Music]
10:00 a.m. all of the uh concrete work
is done for a little while they're going
to take a break and come
back and uh eat lunch here in a few
minutes I've got some potatoes going on
over there and did pulled pork last
night so we got to run back and get a
crock pot in just a little
bit but today's a good day today's a
beautiful day not a cloud in the
[Music]
sky
anywhere the high today is like 80° and
low
humidity it is picture perfect day
[Music]
here pull pork that
I cooked yesterday
[Music]
Yum Yum Yum Yum tell you what I've been
doing with some P pork lately and by
lately I mean just
today I toasted some buns over the fire
some P pork layer of shredded mild
cheddar
cheese and a thick layer of pickles for
crunch if anyone has ever put Co SLO on
top of P pork
sandwiches pickles in my opinion is even
better I love cold on top but pickles is
even better then we've got some
uh garlic parmesan mashed
potatoes life is good I am so full about
the
burst you what if I put my foot in that
way if you put your foot in it mhm yeah
I think it would sink so we're not going
to do that right
now pretty soon boss man's going to get
back we're going to put our handprints
in it where you going to put them at
hand hand hand hand hand all over the
place like cat
tracks now actually I think we're going
to put it in a very specific location
[Music]
[Music]
[Music]
[Music]
oh
it's a beautiful day today beautiful day
they're pretty much done with the slab
they're just doing a little bit of
uh whatever that is he called it a
whirly bird
a little bit of surface work and then
they'll be done waiting for boss man to
come back and um check it over and make
sure everything's good to go well that's
it that's the
last last guy to
go and uh they did a good job did a good
job so on this wall right here we're at
a 12T door so they put a little lip
right there for the
door and
the slab has a little bit of a lip right
here all the way around inch and a half
lip and that's a ER rodent guard or
whatever they're going to put when the
steel building goes up the metal side of
the building will come down on top of
this and prevent any rodents from being
able to go inside the inside the
building That's so exciting I just I've
just been like you know walking around
and standing and staring at
it it's pretty cool it's pretty cool
pretty cool we got to do a lot of dirt
work up here no big
deal
um yeah everyone's gone for the
day slab looks good nice and smooth
inside there I like it I like it I like
it I like it I like it I like
it I got to get out of here because I'm
just going to stare at this concrete all
day I'm just so excited so excited about
about this Milestone so excited got a
lot more to do though
[Music]