We finally have water! I say finally because it took 53 days from the time I paid for the meter to the day the meter was installed. BUT...I'm not too upset about it. I understand things happen. If there's one piece of advice I can give anyone about a new property journey like ours, it's to expect delays from machines and equipment. That is the case with the water delay.
Before the meter was set we trenched and installed 1335' of pipe. Unfortunately, the meter was not set before rain from hurricane Helene hit. Thankfully, we got no damage and nowhere near the amount of rain that was dumped east of us in Georgia and the Carolinas. We did have one section of pipe float and a fair bit of the dirt collapse and flood the trench. Not a huge deal, but a decent amount of time to play in the mud.
So we've been trying to get this water meter installed on our property for
50 something days. It was August 8th when we paid the money to get the meter installed
and get service connected. August 8th. Today is October 1st. And I just got a text message
saying that they're on their way to come bore under the road and get the meter set.
Cool, right? Well, I want to record that process, but today I've got to get this pipe
unfloated. So this is the lowest part of the, the lowest part of the trench. And I didn't cover
anything because I wanted to pressure test everything before I covered it. The meter was
supposed to be installed last week, which is why I did this last week. Well, we got a bunch of rain.
So at just the lowest point, it's not the end of the world, but at the lowest point,
the pipe floated and it's a deep trench. So I've got a couple things. Let me show you the plan.
I brought a 20 volt Dewalt drill, battery drill, and I've got several batteries. So my wife is
going to run the Harbor Freight pump, pumping this trench out down that direction. And I think I'm
going to try and try and get the pipe lifted and out and suspended with a couple of two by fours
over the trench, dig it all out, put it all back in. And, um, hopefully by then they'll be up there
with the meter working and, uh, we can fill this with water. So it stays to the bottom,
pressure test it once, well, for the first time, and then we can bury it with the tractor.
Burying it with the tractor is not going to be too much fun because I only have a borrowed box
blade that doesn't really do good in the pushing direction, like pushing backwards.
So, um, we'll get it done, but it's probably going to be more shovel work than what I want.
Yeah. Hands are going to get super filthy. There's a clean spot. If you want to grab
the pipe right there, the plan is to lift it up and go on this side because this side
is on the inside of this curve. So we should have more slack to go this way.
I've got a two by four right here. Uh, let me get, uh, let me get you one for your side.
I think there's an extra in the truck.
Let me know when you're ready. All right. You got it. Right now this allows us
an opportunity to find a, or to create a spot that will continuously fill with water for the,
for the pump. Do what you got to do.
There should be a spot deep enough to start the pump again.
All right. Now we just need to make sure that this stays underwater.
Just let it do its thing. And then, uh, Oh, this stuff's like cement.
That's crazy.
No, it's not working. That's, this is speed one. Speed two is the same. Speed two went out.
Like there's not that much use on this, on this drill. And there you go. Speed two is out.
Let's, uh, move on. And now we wait, get all the water out and then, uh,
then dig out until we find a depth we like. These Velcro straps or sections of Velcro,
I guess you could say, are awesome. Super handy on the property. I'm hoping this speeds it up
because I didn't think that was producing much water flow right then. All right. That
wasn't providing adequate water flow. I tried to flatten it with some pliers
like that, but it just wants to collapse right back, right back onto itself.
So we move it up a little bit. This one goes on the bottom, this one on top.
Let's see what this does. Probably gonna have to reverse it to prime it.
Not much we can do until that catches up and drains this bottom section of pipe. No way,
you're already done. This drill, it just, this is like a brand new drill. Barely any use on it.
Brand new flex volt battery. It doesn't feel hot. The battery is full. Yep. Three bars
on a huge nine amp hour, 20 volt battery. Why'd you stop? Does it have like a max runtime
timer to shut it off? If so, that's, that's going to suck.
Um, I wonder if I have a squeeze clamp in there, that'd be easier.
Yeah. Well, why are you looking at me? Yeah, you keep this going and I'll go look. Oh boy.
This toolbox is in disarray. I don't have a place to put anything, so it becomes a catch-all.
Anything that's a catch-all is not organized and that kind of drives me crazy.
I'm not sure if this is going to be any faster to on off it. We'll see.
Man, that, that hose has this whole thing as a rainbow right now.
I don't know if I have the GoPro set right at the right angle, but just this far end of this puddle
has developed this, this chemical haze on top of the water. And it's from these, these hoses.
We're using these hoses. Well, we did use this hose when we first got to the, uh, the campsite
where we're at now for supplying the camper. Uh, and quickly realized that these are not water
safe hoses. Like they say they are. You get this weird, disgusting film that comes out of the
faucet every time you use these hoses, uh, for supply. So when we, before we got a water safe,
well, another water safe hose, we used this one and we'd run the water, like flush, flush the
hose every time we used the water before we actually got into the water, like for showers
and whatnot. So there you go. Drinking safe water hoses with this stuff that you would otherwise be
drinking. It's crazy. All right. So we've got some decent water flow through here. Let's make
a little bit better. Not much, but just a little bit better. Spiderweb right in my eyelashes.
Fun times. What I'm doing now is somewhat unnecessary. Once, uh, once this problem is
fixed with this water, I just, I just don't want the water to be backing up to where I'm working.
This is plenty enough flow for regular drainage, which is why this ditch is here to begin with.
I just want to make sure we're not backing up at all where I'm working.
And this continues to flow down, down, down, down, down. There's some high spots, but
this is, uh, this is doing what I wanted it to do. All right. Good flow downhill. I'm going to keep
going. Keep this water moving away. We are deep in the woods. These, these bugs are brutal out
here. I got bug spray all over me and they won't leave me alone. Oh, there's some deer tracks
through here. Nice deer tracks. Not incredibly big, but I'll take it. The good thing about
working with mud is it's, it's easy to dig through. The downside is it's just heavy because it's,
you know, it's water saturated. It's waterlogged. So it's just heavy. All right. That'll keep the
water away from where we're working for sure. I don't think I had to do anything to begin with,
but it doesn't hurt. It sure doesn't hurt. And all this gradually goes downhill that way. All right.
Already shaped the ditch back to where it needs to be. They're filling in this now.
Water line's going up into that box right there. And he's got the meter in his hand.
They are working fast. The other two guys left with the ditch, which already they're
taking that back to the shop. Finally, the meter is set. Now, this is one of those situations where
like I'm a little bit frustrated because it took so long. It took 53 days, 54 days
for the meter to be set from the time I paid the money for it to it actually being set. However,
if there's anything that I've learned dealing with contractors and many different types of
large equipment, it's just expect delays. Because when we were clearing the two acres for the house
and shop pad, both the dozer and the excavator went down in the same day. They were both broken
in the same day. And here with this situation, I'm getting a little bit frustrated because
I want the job done. And the company that's contracted to do all the meter sets and whatnot
had just a series of crazy things go wrong with their equipment and their trucks. And,
you know, it is what it is. So on one hand, like I've got sympathy. I understand crap happens. And
man, it sucks that them as a company had to go through all that stuff. But on the other hand,
I still want my water set. Anyway, water meter is set. Everything is done. Let me let me show you
what we got going on. I didn't want to shove the camera in everyone's face while we're doing this.
And also like we came halfway through after they set up. Anyway, the meter box is just placed on
top of the meter. He asked me if I wanted him to completely bury it and get it set for just this
side out or leave it all open. That way I can get all the piping done and then figure out the exact
placement and whatnot. And that's the route I went with. So it's just sitting there. You can
see the brass stub out on this side. I'll have to hook it up. I got to go from three quarter.
That's a three quarter male. I got to get some pipe and fittings to keep it at three quarter
up to the two inch pipe right here. And I'll just use a two inch by three quarter bushing.
Now, why would I be OK with two inch feeding? I'm sorry, three quarter inch feeding two inch. Well,
it's really all that's necessary. The whole point of this two inch right here
is for volume. We're going to have pressure at the property no matter what.
But the two inch is for volume. So picture that two inch pipe in the trench down there as
the tank on an air compressor. Right. So the compressor itself is what's going to give you
pressure. That's fine. The tank is what gives you lasting pressure. Right. Does that make sense?
So this two inch pipe is essentially a big water tank all the way down to the property.
Twelve hundred and forty something feet until it next down to one inch and then one inch goes
another 80 feet into the slab of the shop. And then that one inch will be reduced to three
quarter inside the shop. So we should have really good pressure throughout.
And this two inch pipe gives us the volume to maintain that pressure.
This is the first tee at the turnaround tree. I want to have a spigot over here. Hopefully
the wind doesn't get me. That's the plan. So I got to I'm writing a list here to connect the dots
at this location. And then we have a couple more that we have to
map out and figure out what I need to get before we actually hook it up,
which will be later today. Once it's hooked up, once we put water in it very slowly and
very carefully so we don't stress the pipe, then we can use the tractor to start burying this.
Now, today is Tuesday. I would love to get all this done today on Tuesday.
I don't care if I get it buried today, but I'd love to get the water running
today and pressurized today. And then the next couple of days I can bury it.
And finally, we'll be ready for gravel on the driveway. Are you ready for gravel and driveway,
babe? Been ready. OK, so we're going to go get some supplies and get this done.
So.
Furthest downhill spigot or ball valve rather, the spigots are not hooked up yet,
but the ball valve is open, so that'll drain when we turn the water on.
And then right up here on the top of the first hill where the first spigot is
or yard hydrant, the ball valve is open, spraying off into the distance.
So we're going to very slowly open this water valve for the first time.
You ready for water on the property? Yeah, yeah, we're ready.
All right. Our zero reading is 25 gallons. Ready to watch this thing spin.
I'm only going to open it a little bit.
So I just cracked it open. Maybe a little bit more than that.
All right. That's the first spigot location or yard hydrant. I keep calling it the wrong thing.
First yard hydrant location that the valve is open. So that's essentially letting air out of
the line because the second half of this is all downhill.
So we're going to fill up the bottom half first. We need to go to the other line or the other end
and wait till water comes out of that ball valve.
Turn it to about, I don't know, 10 or 15 percent open just to let it trickle out
and then come back up here and get all the air out of line on this other one.
What did you say was the, the, how many gallons did you say the two inch pipe had in calculations?
Uh, what was it? 300 and something?
My wife just calculated how many gallons it would take to fill up the two inch pipe that we just
laid. I ended up having to put the, um, put the... 322.
All right. So 322 gallons is what my wife just calculated for the two inch pipe. I ended up
turning the valve wide open. I don't want to put a lot of pressure into the pipe, but
all of the, there's, there's two other valves open on downstream, so it shouldn't be too,
too much of a shock of pressure right now. We've got a lot to fill up.
We're only at gallon number 220.
So where are we at right now?
We're at 220. What number did you say? Three something?
322.
Yeah, we've got another 100 gallons to go before, uh, this, the calculations meet up with the
volume. But we're losing one or two, so is it like that true, a true calculation?
True, you're right. Um, I, I don't know. We're just going to let it run for quite a while. We'll
waste a bunch of water today. Um, but we got to get all the, the, you know, the acetone and all
that crap from the cleaner and whatnot out of the pipeline anyway before we start using it.
Yeah.
Because we kind of have a, a hill in the line, um, high spot in the line,
I think we're going to get a bunch of air trapped up there for a little while. So it's probably
going to take a little bit longer than normal to get that air bubble out. Uh, luckily we have that
other, that other hydrant or that other, uh, drain closer towards the high side.
So we're going to let this go for a little while. I just glued in a piece of extra pipe just to
spray it over this berm. So it floods the woods and not the rest of our clearing like we've been
dealing with. So we've got a really good stream out of here. We're just getting rid of the air
bubbles. It looks like we got some good drainage into the soil too. Not really flooding over here.
All right, both, both valves are flowing freely with no sound of air. So we're going to shut it
off and let it sit overnight and, uh, take, Oh, Oh, more air. I forgot all my camera gear
at the camper today. So I'm just, just recording the progress. I guess you could say,
it doesn't make sense to go back and get it. Um, so we have the main line coming in here,
the shutoff valve for the spigot or the yard hydrant is in this pipe. Uh, so I can pop the
cap off of that and use a wrench to turn that. This shutoff goes to the shop and then the two
inch, uh, the, the two inch ball valve going to future expansion. I put a box over it, a ground
cover box over the top of it, a trash bag over that layered multiple times and then buried it.
So the, when a time comes to expand, I can unbury that or I can dig that up, I should say.
And the two inch ball valve will be nice and clean and ready to, ready to tap into, uh, these
two caps. These are four inch pipes. Uh, this is just my access to the shutoff valves. They're
too tall right now. Um, but once all the stuff settles, I'll cut them down a little bit lower.
And I think I'm going to put, uh, a couple of like, almost like the, uh, the boat, the boat
tie off, whatever those are called, almost like a handle on the top of each one of these. That way,
I got something to grab to and pull up, uh, to take the caps off. The yard hydrant is a foot and
a half underground, completely encapsulated in rock. And there's rock below it as well. I cut
the bottom out of a five gallon bucket and I use the bucket kind of as a sleeve to hold the gravel,
but also to stop dirt from infiltrating from the sides because the way that these work is when you
shut the hydrant off, you don't want water up here because it'll freeze. Uh, so when you shut
the hydrant off up here, it opens a valve down there and whatever's in the shaft or in this,
in this, the riser here, it drains out into the gravel. If you have it packed in with dirt, well,
it can't really drain out that well and you risk freezing this. So you're supposed to put these
in gravel. Uh, I think the five gallon bucket is at a good height to where I can bury it all the
way around. So I don't see any of the blue, but you'll see this nice layer of gravel and I can
slope it away from it. So I think that's going to be a nice clean install. Um, another handy use for
a bucket. I think I'm going to cover this with something movable, probably like a garden hose
reel or something like that, or maybe even just a table, maybe, maybe a splash sink. I don't know.
Regardless, um, these are kind of sort of in the way, but they won't be in the way, the way that
we're going to use them. So, so there's that. This is out of the way anyway, uh, from the main clearing,
the main path is over here. So this is, this is fine. Just fine. Same setup for this side,
five gallon bucket of gravel, gravel below the bucket and a shutoff valve. This is my plastic
tool shutoff valve, just a two inch pipe with a, uh, u-shaped cutout at the end to turn stuff on
and off. You ready? You got pretty dirty today. You're glad to have water on the property?
Of course you are. Ah, you're getting me wet. Oh no. I got the hose girl. I got the hose. I'll
get you. No, I won't. Cause you're in my truck. My goodness. You always win. Not always. Be
careful. That's slick. My cheek. I'm a cheeky little what? Cheeky little, you're watching too
much bluey. No such thing. Girl, you got to get in the truck. Hey, no more. I'm for real. No more.
Clean off your feet and that's it. We got to get in the truck. We got to go. Just your feet. Just
your feet. All right. Now you stay there and I'm gonna get your shoes. All right. You stay there
and I'm going to get your shoes. Okay. Yeah. This is going to be a muddy mess until we get it
straightened out. Here's the tool though. Just a cut like that. And then you can twist the ball
valve with just one hand to turn it on and off. But the only reason we should shut those off is
we have to develop a problem with the yard hydrant though. So I don't think we will. I'm
just going to set the tool here and we gots to go. Hey, stay there so I get your shoes. Okay.