Hello friends everyone
This is Pavel Sidorik a channel about repairs and renovation
Today's video is about light
concrete using expanded clay
aggregate Also we will try plastic fasteners for guides
I have never tried these plastic fasteners before
I bought them at the store yesterday
They cost 25 pieces at 4.5 Belarusian rubles each
which is slightly more than 2 dollars
Light in the literal sense of the word
In which cases is it used
When the thickness of the screed is too great then it is used in
As a filler expanded clay aggregate
It reduces weight plus it saves on the screed itself
Less solution is used
In old houses when removing the joists taking into account that
The construction of these houses is not designed for
heavy loads the screed should be made lightweight
Therefore they use a mix of concrete and expanded clay aggregate
There are many applications for this type of concrete
By the way besides the traditional reinforced concrete whe
Separately the perlite and the screed are mixed for the test I too
wo bags of ready-mix concrete that already contains
cement gravel and plasticizers as well as graded aggregates
Filler I have never worked with
this type of screed
before so for testing I only took two bags
This is what the mixture looks like in dry form
If the cement and sand are washed then as a filler
There remains fine expanded clay aggregate
The purpose of producing such a screed is to reduce labor costs
Mix the expanded clay aggregate and the screed separately
I prepared two screed samples
On the right side there is a sample where expanded clay aggregate has been poured then
there is a layer of expanded clay aggregate with a screed and then a layer of clean
Slabs Another upper layer of
reinforcing mesh is also applied
On the left side the expanded clay aggregate is mixed with the screed
and there is a clean layer of screed on top which can also be used
Reinforcing mesh
This sample is used when the thickness is too large
and additional expanded clay is added at a higher
o the lower layers of the screed
Let's get started
We start by vacuuming the base
We prime the floor
All cracks and gaps in the floor need to be
filled especially the joints between the tiles
As a border strip I use a
underlayment for laminate
I'm nailing it to the wall with a regular stapler
I also coated the
edge with tile adhesive
The floor level in the kitchen will now be 12 millimeters
lower than in the corridor this is because here
It will be a radiant rod
floor It is exactly one centimeter Let's start
installing the benchmarks
We drill holes in a row according to
the laser level for installing beacons
It is important that the holes are drilled in a straight line
If there is no laser level the line can be marked with chalk
Lace
How do we transfer the level from the
existing screed to the future new screed
Using this square I mark the level of the already
completed 5 centimeters 3 millimeters screed
Now we transfer this level onto this screw taking into account
the thickness of the
guide one centimeter and this plastic base
In the kitchen we will set the level 12 millimeters lower
than in the corridor because
we will have a warm floor here
As soon as we set the screw level I took the screwdriver
and made a corresponding mark on the screwdriver
To tighten all the other screws at this level
It works very quickly and most importantly accurately
I'm checking with a bubble level to see how it turns out
It all works out perfectly
We put on the lighthouse stand
We are inserting the beacon
We close the beacon in the bracket using the yellow plug
The beacons are set to the level
We apply additional
reinforcement to prevent the guides from bending
Now it is possible to proceed with the pouring
We start mixing the concrete
First we pour water
Then we pour the contents of the bag
We mix it the mixture should be more liquid than usual
We fill the screed with 1 bag of
screed and 1 bag of expanded clay aggregate and mix it
We spread the resulting mixture between the markers and
start to level it
We level it 1 to 1 5 cm below the benchmarks
You can walk on this mixture immediately
It's time to test the light screed
Mix the bag according to the instructions
The solution turned out to be in such a consistency
We are leveling the contents
Next step
We remove the top layer using regular mortar
without perlite according to the guidelines
We pull it in the usual way using a rope
Technical movement can be performed after the coating has
dried which will take 8-10 hours
The screed is ready the next day after pouring I trimmed
it I didn't remove the guides as there will be more here
Install the underfloor heating and
pour a centimeter of tile adhesive
Thank you for your attention the video is ending
as for the two new products I tried this is light
Lightweight concrete base with plastic
fasteners for guides I liked them
It was easy to work with the underlayment and at some point
I even regretted not buying it for the entire floor area
I will do it that way next time
It's also convenient to work with plastic fasteners but
there's a catch
If you have a large height like I did there are no questions
but if you are placing markers tightly against the wall
To the wall this mounting has a certain thickness
and you will have to apply more plaster exactly
For the thickness of this bracket