Как сделать вытяжку на кухне правильно_ Вентиляция в старом доме

Pavel Sidorik. Renovation and Finishing
79 followers
26 Video Views·Dec 11, 2022
Friends hello everyone This is Pavel Fedorik and you're on a channel about repairs and decoration Almost everything is
Builders and DIY enthusiasts I am no exception connect the range hood to the general system when renovating the kitchen
Ventilation duct You can't do that What problems could arise If you connect the exhaust fan to the ventilation duct
If the channel is sealed from below the ventilation in the entire apartment will be disrupted Since the apartment has
Air enters through the windows and is extracted through the ventilation duct in the kitchen and bathroom This is dangerous
Consequences High humidity mold fungus and lack of oxygen Ventilation duct
It has a certain air exchange capacity By connecting a powerful exhaust fan of 600-800 cubic meters
You're overloading it Air is being released back through the kitchen vent
And in the bathroom since the pipes are connected Also the noise level increases Often during construction
The ventilation ducts are installed improperly and there are holes and cracks at the joints of the ventilation ducts
And pressurized air can get to your neighbors and consequently the smell of food
fried fish chicken and so on If the residents on the lower floors turn on the exhaust fan
Then they take over all the airflow capacity of the vent In other cases
The draft disappears in the upper apartments What are the alternatives Just not to connect
Into the general vent duct and to make the exhaust vent out to the street This solution was suggested to me by specialists
Company StatVent I am currently working with them on work It's not that I didn't know this
Just I didn't think it would be so simple fast and accessible And in this video I will talk about it
How we created a proper ventilation channel in an old panel house and how much it costs
For the work we will need an inertial grid that will be installed on the building's facade
Two 90 and 45 degree branches a metal spring-loaded check valve 125 diameter pipe
Millimeters pipe clamps Let's get started A hole is marked on the wall
Under the ventilation pipe The opening should be within the frame of the drawn box It is mounted on the wall
Diamond drilling unit The process of drilling a hole is carried out The unit is connected to
A water hose and vacuum for collecting dust and water Drilling is very fast and relatively quiet
Quietly It made a neat hole in the wall Also a fashionable concrete keychain remained
A gasket is attached to the pipe This is done so that the pipe fits tightly into the opening
The hole is drilled at a slight angle to prevent moisture from entering the apartment At the entrance
The check valve is tightened from all four sides There is only an outlet on top and bottom along the axis If
Tighten from the side screws will hinder the opening of the panels Let's start assembling the ventilation system
All connections are secured with screws and aluminum tape The ventilation system is almost complete
Last touch Installing the front inertia grid Apply with silicone Check
The system worked because of what was at hand My wife's hairdryer was at hand Everything works This is what we have
It worked Thank you for your attention If you liked the video of course support it with a like
Subscribe to the channel and click the bell See you next time