Hey guys, Zach here with Zem Construction bringing you part three of our basement
finishing series. Last video we got all the trim wrapped up,
started the painting process, the shower is completely waterproof.
So if you haven't checked out part two make sure you go do that.
So in this week's video we are going to be finishing up the shower,
wrapping up all of the paint, and then putting together the bathroom. So the
vanity, countertop, sink, faucet, toilet, and other
fixtures like that. So make sure you stay tuned.
Alright guys, as I am cutting the bottoms off of these doors I wanted to
make sure include everything that had to do with doors in part three as opposed
to splitting them up to parts two and three.
We're backtracking a little bit technically, but what I'm doing here is
I'm using the track saw to cut about three quarters of an inch
off the bottom of the door. Then the painter can go through and spray it.
We had to cut a little bit off the bottom of them because three of the four
pocket doors are actually going to go underneath the large steel
structural beam. Make sure you go check out part one to see what I'm talking
about. But we were limited on the height and so
in order to fit the doors we just had to take a little bit off the bottom.
You can barely tell, I think it worked out fine. There's one door that was a
pre-hung door while the rest were pocket doors.
So getting that hardware all mounted so that they slide nice and easy.
This is the one in the bathroom. We pre-painted
the doors in this case so that we could mount them inside and then wrap the trim
all the way around. See I'm opening and closing that a bunch to make sure that
that jam on that side just lines up perfectly. Making minute adjustments to
the slides, the rollers, the jam, just everything.
Make sure that it is nice and perfect with a perfect
uniform reveal all the way around. Those double doors
were quite the process to get them to line up perfectly, but a little bit of
prep work prior to drywall made that process a lot easier, a lot more simple.
We did include soft close and open hardware. We'll see a little bit more of
that later. So as the painter was working getting
everything done there with trim, walls, ceiling, all
of that stuff, we pretty much locked ourselves in the
bathroom for the remainder of the project. So
first was get the tile done on the shower floor. I've talked about this a
little bit in previous videos where we like to do the shower floor first
and then the wall tile on top of that just to give
an even better surface for water to flow as it comes down the wall,
hits the tile floor and then makes its way into the drain as opposed to going
the opposite way leaving a potential gap or grout line in
between that seam. So just an extra precaution
that we have to get water to flow in the correct
direction. The homeowner decided to go with a small
hexagon black tile. I really like the look of
this. We've actually used it in several other projects and have
clients coming up that also like this the same pattern.
We did the same mosaic in the back of the niche
going through and getting that all lined up making sure it is centered,
has good lines. We do grout the floor first oftentimes before we do the wall
tile. Because the niche tile was already in we
decided we'd just grout that as well. They went with a dark charcoal gray
grout which I thought was a great choice. It
wasn't close enough to the tile color where
you couldn't see the shapes of the tile. I still think the shapes of the tile
stand out and look really nice but it does have a really nice overall look.
Getting that all cleaned up. This was a pretty big shower so it was nice to have
a helper to go through and grout with me. You'll see a lot more grout later when we
do the walls. This is a 3x12
ceramic subway tile. We did a 50 offset in this case. This is what the homeowner
wanted. As you can see we got the laser lined up
all the way through the center of the shower with the faucet.
Just going through back buttering every single piece
getting those laid on. Again really nice to have a helper in this case.
Using a tile leveling system. I know with these smaller tiles it may not be
completely necessary. This size of tile I hadn't worked with a
ton before and so in this case we just thought you know
better be safe than sorry. We'll use the anti-lippage or the leveling system.
I'm going through making sure the grout lines all match up with niche
perfectly. I'm a huge stickler for making sure that
the grout lines work their way around the niche. Make it look like it was
planned and intentional. Stay away from the pre-built niches. I
know some of the really good shower systems do have a pre-built niche and in
some cases you can make those work if the niche is the right size
for the tile that you're using. Oftentimes that is not
not the case. We can pre-fabricate our own niche that will line up
perfectly with the grout lines. As you can see there's full tiles on the top
on the bottom and either a full tile or a half tile
on the sides of the niche. We used some clamps to make sure we can get that
perfectly level. After the back wall was all done we came
through and did the side walls. We did those
simultaneously kind of working our way back and forth.
There's a couple different ways you can go about doing the Schluter trim
on the outside. Obviously the easiest way is to
set the Schluter in while it is wet while the thinset
is still drying and that is what we did in this case. We built our way all the
way up the walls on the side. You can see the
nice big black sharpie line that we used as a reference and then
before the thinset all dries you take your Schluter trim
and put that into the side. The other option which we use
sometimes as well is we'll actually staple the
aluminum trim to the wall prior to installing the tile.
Kind of just gives us another reference point. We use staples because there still
is a little bit of an adjustment as opposed to like screws or nails or
something like that. So you can move the Schluter in and out
accordingly to make the reveal look as nice as possible.
We went with a matte black Schluter aluminum to match the rest of
the hardware in the bathroom. A little bit of a satisfying clip of
getting all of those leveling clips removed. We do go back and
do the first row last after we remove the
ledger board. As often as you can you want to try to
make the shower floor level but sometimes you know especially with
concrete slabs and those types of things you don't
necessarily have a perfectly level surface to start with.
So to put up a ledger board using the laser using nice
higher end levels you know that you have a perfect starting point. The rest of the
walls are going to be perfect. Then you can come back and do a little
bit of a custom fit for that first row just in case there is
any imperfections in the in the slope of the concrete.
After all the walls were done I'm going through here and putting
tile in the niche. Doing my best to line up the grout lines
so that it just wraps all the way through seamlessly.
We did go with the same black Schluter aluminum trim
around the niche as well. I think it accents really well with
the black hexagons. I'm a big fan of this look.
You can see even how one row to the next does have an offset pattern. I actually
carried that pattern through into the niche so the top and the
bottom of the niche will have an alternating tile pattern
just so those grout lines match up even nicer. We did plan it out to where
we could use a full tile on the width of the niche so that just
again adds to the overall look a little bit more planned out.
Then we also made it to where a full tile
goes up the front of the curb as well as opposed to having some small sliver
pieces or anything like that. So again just a little bit of pre-planning
make things look a little bit nicer. Doing the outside of the curb
inside of the curb we did go with a quartz
curb topper. If I can I try to use a single piece and they do sell those in
in 72 inch long quartz pieces and they're readily
available at the big box stores. This shower was a little bit longer than
those pieces so we went with a little bit of a smaller one.
We do end up using as you can see right here we did use a white grout a high
gloss white grout in order to make it appear that this
was one solid piece going all the way through.
So we did that one first let that set up. Again the shower floor and niche were
already grouted. Now we're going through and grouting all
of the shower walls. Usually when you grout they say do as
far as you can reach. Give that grout 10 to 15 minutes or so
to start setting up and then come through and wash with a sponge. We
usually like to use two buckets. We have a
rinse bucket and then a clean bucket. Again really nice to have a helper in
this case to where I could just keep on moving and
then my Cody could move along behind me and just keep stuff clean.
Again we're really trying to pay attention to that setup time that 10 to
15 minutes. We broke it up to where we did one wall
on the left side the right wall half of the back wall and then the other half of
the back wall. We felt that we could grout and sponge in a good
pattern that would allow us to follow the manufacturer's recommendations
If you didn't have a helper I think you would just wait. I think you would do
one wall wait that 10 minutes wipe it down go to the next wall
wait that 10 minutes. So it is possible but
oftentimes you're going to have to be mixing up multiple batches of grout as
opposed to one big batch where you can just move along.
So once everything was grouted next was the massive
glass panel. This panel was 78 inches tall
by 60 inches wide so that left about a 29 inch opening on the left side.
Really big piece of glass. Luckily the painter was there to help us get this
installed. He's a big guy obviously so while he was waiting for paint to dry is
when we decided to get this installed so it was nice to have his help.
After the glass was installed I'm going through and using a color match silicone
to go through all of the inside corners bottom corners inside corners of the
niche and then after all of those
corners are silicone I go through with a clear silicone
of course to get the shower panel and the glass
all sealed and waterproof make sure we don't have any. There's several different
ways to caulk a shower. This one I was using
denatured alcohol. I put a nice bead spray on some denatured alcohol.
What that does is anywhere that denatured alcohol is
it doesn't allow the silicone to stick so you can go through and wipe that off.
We use masking as well in order to apply silicone just kind of depends on
the product and how we're. Now here is a shot of the painter we actually have
several cameras going at the same time so you can see we're in there
doing some tile while he was out here painting so there's a little bit of a
gap in the time but just so you can get an idea of how this project was moving
along. The color we use often in our remodels is agreeable gray.
This is one of the most popular colors looks good with everything.
This is the color that I use in my house and most of our clients really like it. I
end up buying it by 10 to 20 gallons at a time just because
it's nice to have plenty of extra and it's not going to go to waste. There's a
very high probability that that same color will be used on the next
project as well. So the vanity that we end up using in
this bathroom is actually a three-piece custom cabinet vanity and the width came
out to be about 54 inches wide so because of that it's not a standard
vanity width. A 48 is very standard and 60 inches
wide is very standard so because we had a little bit of a weird
width I couldn't find a vanity frame that I like so I ended up building my
own. I used the trim that we used around the doors
to build my own you'll see more of that later.
Here you actually see my employee Cody he's going through
and assembling all of the cabinets so we went with a ready to assemble product in
this case. There was a very large storage cabinet
it was 94 inches tall. I was worried that we weren't going to
be able to get that down the stairs very easily
so we went with a right there it is right there you can see it on the right
we ended up not using that in the bathroom the homeowner felt like it
didn't really work with the space so didn't end up needing it but we did
went with a ready to assemble option so that we could assemble those down
in the basement and install those easy so after all the painting was done you
can see there the painter was taking off the masking over those beautiful
frosted glass panels. Now I'm going through and installing the
pocket door hardware. I really like this product it is actually
a round pocket door hardware as opposed to the
square ones that you you know have seen most likely where you
have to cut a big square notch out of the door. This one
you can actually use traditional doorknob installation techniques where
I like it I think it looks a lot better it matches especially if you have other
standard doorknobs in the space using the same doors
this one I put one of the doorknobs on one door
and then the receiver on the other door so that when they slide together it
actually could be latched and locked together.
Great product and I actually have a video that we're planning on coming out. I have
a different method that I use for installing those so make sure you stay
tuned and subscribe for that video. Now we're getting those cabinets
installed that Cody had assembled going through screwing the face frames
together using some nice clamps making sure that is all uniform
and then going back with shims and ensuring that everything is square
plumb and level. These of course all had soft close hardware and we go through
later and install the handles. Once that was all in I go through and put
the toilet in now. We really are in the home stretch this is
some of the last things you see the painter was helping us get things in
he was just waiting on paint to dry doing touch-ups and things like that.
So through in doing some of the plumbing fixtures the shower faucet shower
handle shower head so they had a really cool
adjustable wand head system turned out really nice matching
sink faucet we actually had subcontractors come in to install the
countertops the supplier they offer free installs of course I was
going to take advantage of that getting a light again that matches all
the rest of the hardware and now we're getting to installing our
custom built vanity mirror I think it turned out really nice it was the exact
same paint colors all of the trim is actually the same
material as the trim so it matches looks nice it's the perfect width of the
cabinets which is super important as opposed to doing something smaller
the way that it was set up that would really be the only option which I really
didn't want big gaps on either side so now that
everything was completely done the last step is to get everything
cleaned up so we pull all the masking up of course we had
some dirt and dust from the previous steps so going through getting those
swept this project was really fun turned out
beautiful we ended up getting some referrals from this client
where they this client was very very good to work
with we enjoyed them a lot all right guys we're all finished up came
down the stairs into the main living room we got this
utility room all finished up of course the venting for the hot water heater
that's in there two big double pocket doors which you
saw it's one of my favorite parts and because
they had glass panels we were made sure to do
a soft and open close hardware in the main master bedroom
with the big closet that was underneath the stairs
again another five panel soft close pocket door
and then the egress window with all of the trim everything of course matches
upstairs windowsills and the bullnose and then
my favorite part of the whole project is this bathroom with a massive
seven and a half by three and a half foot shower 54 inch vanity with a
beautiful granite top we actually fabricated that mirror
ourselves but thank you so much for watching this video
please leave some feedback in the comments down below tell me if you like
the long time lapses if you like the more in-depth breakdowns with
of course with time lapses involved there tell me if you want to see some
more if you want some more breakdown more in-depth maybe weekly videos on
on how we do things so love to hear from you thank you again so much for watching
we'll talk to you later