Adding Equity - Finishing a 1300 Square Foot Basement - Full Build Time lapse

ZEM Construction
5 followers
14 Video Views·Nov 3, 2022
Adding Equity - Finishing a 1300 Square Foot Basement - Full Build Time lapse
Hey guys, Zach here with Zem Construction. In today's video I'm going to show you how I took
this unfinished 1300 square foot basement, added two bedrooms, a bathroom, a couple closets,
and a huge living space. Without any further ado, let's get into the video.
So first, I wanted to give you guys a quick walkthrough of what the basement looked like
before we did anything. So as of right now, the framing is already done on most of the exterior
walls. There's already insulation in them. Most of the electrical is already done and ready to go.
You can see right there, there was an ejector pump getting ready for a bathroom to be put in.
There were egress windows, as you can see right there, throughout. So bedrooms were already
legally allowed to be put in that space. Here's another closet that is behind the
furnace back here. It's a great big space for some more storage.
So the first thing that we needed to get done was frame up all of the interior walls. Like I said,
the exterior was already framed, so at this point we're just putting dividers in between to create
those spaces that will eventually become the bedroom, the living room, bathroom. So this is
bedroom number two here, just putting up the dividing wall. Now this space right here is going
to become the bathroom as well as a hallway to walk down into bedroom number one. So there was a
lot of different things to deal with in this space. There was ducting, pipes up top, electrical wire,
different things like that. So I had really had to get creative. As you can see, there's some tape
hanging down and that is actually from the builder was labeling different aspects to eventually be
finished later. It actually made my life really easy. He actually had labeled which water sources
to use, where to place the exhaust fan, where to vent it out, different things like that. And even
on the ground, you'll see a big orange letter S and that is showing that this is where the sewer
line runs to connect for the toilet and the shower and the sink. So it made my life great. So I've got
all those dividing walls in and now I'm putting in the pocket door. Usually when I frame walls,
even though there's going to be a door, I just let the bottom plate run all the way through,
as you can see right here, so that I can make sure that it is in line and then go through and attach
all the places that need to be attached and then cut out the bottom plate where the door is going
to go. So it makes alignment, especially with things like pocket doors, which are very crucial.
It makes it much, much easier. So one of the big things for this house was they wanted to maintain
as much storage as possible. The basement was used for storage previously and they were
finishing the basement for a resale value as well as be able to utilize the space. But
storage was a big concern for them. So that back room where you can see a lot of the homeowners
things right now, we're going to leave that unfinished. One, because it is a utility room,
has a drain back there, the water heater furnace and all that. Also, we wanted to leave plenty of
room for storage. So some of those walls were built with that idea in mind. So here's an
under the steps with, we're going to put a closet in there. And this area right here is where the
bedroom closets are going to be. They're going to be four by eight, one for each bedroom.
There were some large glulam beams that were going across. And as opposed to trying to wrap
those or hide those, we actually just used those as the dividing wall for the front of the closet.
So we've got those built. Now I'm actually building all of the soffit in the house. So
there is the vents that go underneath. This is actually in the hallway. So getting that
all framed in places for the drywall to get attached. And then a little bit more soffit.
As you can see, I do layouts very similar to how I build walls. I line up all three of the
boards and then mark them so that all of them are perfectly square and straight. I just use
two by twos pre-drill and then screw them together. Very, very good way to do it. Very strong.
As you can see, I have a lot to cover up in this room. There's the vents as well as all the
electrical and the water lines. So as opposed to having a bunch of like step downs or different
seams and stuff, I just decided to go with one big flat soffit, try to keep it up as high as possible.
The less lines that you can have, especially with soffits, and then eventually will become drywall
and paint lines, the better. And also because these two rooms didn't connect, I didn't feel
the need to keep that consistent all the way through. By the time you walk in there, you're
not going to see it anymore. So that soffit is a lot smaller. This area of the job was kind of
cool. This becomes a little playroom. We ended up calling it. That was a change made by the
homeowner later. I think it was a great idea. So make sure you stay tuned, watch how we finish
that out. More soffit in the storage closet off of the living room. There was a lot more
plumbing and things like that in this area. The kitchen is right above. So there's water lines
for the refrigerator, sink, dishwasher, things like that. So we're just covering that up.
Here I am marking out where the can light's going to be. I just used a
scrap two by four to make sure that I had perfect spacing all the way down the room
and then getting the can lights in to then later be hooked up. As you can see, there was already
lights in there. So just had to get those connected. So now that all the framing is done, I'm going
through to expose the drain line. You can see there's that orange S. So I went through and
kind of had a little bit of an issue. It wasn't exactly where they had marked it. I'm not quite
sure if they lost track of it or what, but as you can see, there was a lot more concrete than
needed to be cut out in order for me to actually find the drain line. Luckily I did find it,
did get everything connected. Everything was fine. So going through and getting that filled up.
So this was fascinating. I had the drywall delivered, but in a basement, you have to go
through the egress window right there. So we just pulled that egress off. They were able to bring
those 12 foot sheets in. There's 120 sheets. So I thought you guys would think that was pretty
cool. I just want to make sure I showed you that. So here I am running the ducting and then the
outside vent for the bathroom exhaust fan. This is again where the builder had labeled. This is
the best place. This is the quickest way to get out. Make sure you have the straightest pipes and
everything like that. I used a hard line ducting as opposed to flex because the run was a little
bit longer. So I wanted to have as much smooth airflow as possible. Now, one thing he has all
mentioned in previous videos is that we didn't use soundproofing between the bottom floor and
the upstairs. In this one, the homeowner obviously wanted to incorporate some soundproofing. So we
got a rock wool insulation. One piece that's very interesting is now in most modern homes,
they're actually using a 19 on center joist span. And traditionally all joists or studs
walls were 16 inches or 24 inches. As you can see here, I had to actually cut each and every one
of those bats of insulation to get them to fit. Luckily, my supplier made me a good deal on the
24 inch so I could cut a little bit off. I ended up using some of the cutoffs too. So it wasn't a
huge waste. It all worked out really well. So now all the plumbing and everything has been roughed
in. So getting the shower insert installed comes in handy when you actually frame out the walls
and you know that they're plumbing straight. So when you put something in that is as crucial as
it is to make sure those all those walls are straight and parallel, you put something like
that in it makes life a lot easier. So getting those four pieces installed. And after all of
that I the drywall subcontractors are in this is one of my first jobs that I brought in a legitimate
subcontractor and I was so excited. They handled all of the material delivery and all of that stuff.
I was actually finishing up some framing and putting in the shower while they were already
started. So this is them getting going. Also some before pictures before all of the drywall is up.
As you can see everything is framed out. You can see the back of the shower there. There's that
little playroom underneath the landing of the steps. Down in through the hallway the pocket
door is all fastened and secured. All the roughed in plumbing through the bathroom, toilet, shower,
all of that is done. The can lights or pod lights are hanging down. Some places we use pods depending
on how much room we had above us. We ended up putting a wall there to divide off that playroom
completely. Getting all of the drywall hung up. These guys did a great job. Shout out to them.
I don't know if I want to say who they are so you don't want anyone to steal them from me.
I'm super happy with what they did. The homeowner was also very picky. Him and I got along
really well in that aspect. Neither of us could find any issues or anything wrong. We were
both very very happy with the outcome. They actually went through and hung tape, mudded,
and all the way through texture. So here's kind of a walkthrough after the texture is done.
There's the closets. As you can see here's the beam that goes up top. That tap right there.
So that's where the closet wall is actually divided off. Here into the bathroom. They did
really good job matching up all the seams right around that shower insert. Down in through the
hallway into the other bedroom. Again texture and everything looked great. So after all of
the texture is done you need to go through and put on a PVA primer. A PVA is actually designed
to harden the paper as well as any of the mud or the texture on the walls. Makes it a lot more
durable. Personally I noticed a huge difference as opposed to using like an all-purpose primer
or no primer at all as far as the durability and the hardness of the walls themselves. So
PVA is crucial what I do. So after all the PVA was done I was able to pull up the masking from
the drywallers. And the next step in my process I like to put flooring down at this point. And
the reason is I like to put my baseboard on the top of the flooring after it's all done to make
sure there's good clean lines. So from how I do things it makes the most sense to go ahead and put
the flooring in now. There was 1300 square foot of flooring total as well as 12 stairs. So this
process took took a while. Everything turned out great. All the seams went really well. The concrete
was really flat actually for being a concrete pour. I didn't have anything to worry about. And
of course this flooring did have a pad underneath as well as was 100% waterproof. It's an LVP
click together floating floor system. So it's a great option. We had to go through several different
options to make sure we wanted to match upstairs as much as possible. The upstairs of this house
actually has a really nice hardwood floor. Of course you can put hardwood floor in a basement
but subfloor systems and that do increase costs significantly. So we decided to go with an LVP
with a pad. I think it turned out great. It's also super durable. Has a little bit of insulation
property so you're not getting that cold concrete feel all the time. So getting all that stuff laid
in. Seams along the unfinished closet and the unfinished utility room. Working my way into the
hallway and then into the final bedroom. I have some different methods that I use to get a random
pattern. I use four boards at a time as you can kind of see here and then I make sure that I use
the cutoff from the first four rows as the starts of the next row so that I have minimal to no waste
as well as keeping the joint lines as random as possible. So now here I am getting the stairs
wrapped in that LVP. The rise on the stairs was perfectly one width of this. There was only one
spot at the top where I had to seam two together which was great and then the actual treads of
the stairs was a little bit less than two floor widths so I was able to just stack up those two
floor widths take my measurements cut them all in one piece and then get them all to fit and after
everything was fit I taped the seams together going through and getting that adhesive down there
and here's the last little bit of flooring into that closet that's off the living room.
So after all of the LVP is down next up was putting tile in the bathroom. So again the goal was to
match the upstairs as much as possible so we found a tile that was very very similar to what was
already used upstairs. I think it turned out great and one of the requests of the homeowner was that
we get a larger format tile so find something similar in color a larger format less grout lines
everyone was really really happy I think it turned out awesome. Some of the tile patterns that I
didn't like as much I put made sure they were under the vanity as you can see those two gray ones
that look very similar. I didn't really like that pattern so I put those up there intentionally so
that when the vanity is in you actually won't even be able to see them. So got those all in got the
clips removed silicone around the shower and then grouted that. After all the tile and the flooring
is done now it is time to hang the doors. There were eight doors total in this project both
bedrooms utility room closet two closets within the bedroom and then inside the closet little
playroom had its own door as well. So lots of doors spent a lot of time making sure those were all
true framed up again because I did the framing I knew that the walls were straight so I made
shimming and all that so significantly easier than going off of somebody else's wall.
So getting the utility room hung bedroom number one the closets are going to be getting a double
bifold door all the patterns for all these doors matched exactly what they had upstairs we were
able to find the exact pattern. So the small door that goes into the playroom underneath the landing
of the steps was 24 by 30 inches tall. So I actually just purchased a 24 inch regular size
door and then custom cut the frame the jam and the door itself and make it fit within that space it
was pretty fun little piece of the job as you can see there the frame is significantly smaller
is able to move the hinges around using again the door panel that match everything else so that it
all looks cohesive getting that cut off using different pieces of it to make sure that all the
strength and rigidity of a regular door is still there getting that put in as you can see it fits
almost perfectly eventually when we do doorknobs and those types of things we'll get make that all
match. So now I'm putting in the jams for the bifold closet doors again because I was the one
hung up makes makes a lot easier putting in the tracks now for those bifolds these bifolds are
great they do have a solid wood edging all the way around so if you need to make adjustments
trim off a little bit you totally can and of course I took advantage of that in this job
because I was limited on the height because of that glulam beam that goes over the top
so I had to cut off a little bit from the height made some adjustments on the left or right
ended up fitting really really well same thing on the other closet so one of the things that
I like to do is actually hide the track so I actually put a thinner piece of casing or trim
around the jam so that it drops the top down a little bit over the front of the track and then
when I put my header across the top or the piece of trim across the top I line it up with that
piece and so it eventually essentially hides the track which is great now I'm putting in the pocket
door homeowner and I agreed that for this bathroom in this kind of unorthodox space you could call
it pocket door was the best solution I completely agreed so I got that pocket door in now going
through any of the other openings getting the jams installed for the pocket door as well as this
hallway making sure that the reveal is perfect slides right up against that jam perfectly
putting the jams in the openings in and this was a actually a six by six load bearing wall
so I had to get a little creative they don't actually make readily available jams for six
by six openings so I made that now here I am making the window boxes I used a cabinet grade
MDF to build these boxes of course custom cut no walls are straight so each one of those had
their own dimension did take a little while to get those all dialed in but once I had the
dimensions putting them together was very simple I'm using glue and brad nails and in some places
pocket screws depending on where it was and how big the box itself was assembling those on the
nice flat ground and then putting them in and adhering them with some 18 gauge brad nails
the since it was MDF the end grain is very porous and sometimes it's not painted very well so what
I actually use is a shellac based primer painted that on sanded it did several coats and as you
can see the edge turned out perfectly so that reveal is going to look really really nice
here I am putting in the window trim the casing all the way around I actually like if it's a
similar size like all of these ones I go measure everything and then go back and cut it all at once
and just run around and hang it especially with all of the window and door trim that was involved
in this project significantly easier just to stand by the saw do everything you need to do right there
then put it all where it needs to go as you can see I have some leaning up against
the wall right there I can walk around with my nail gun and just shoot everything
I do use a reveal marking gauge set to a 3 16th or quarter inch depending on the job
so make sure that all of the reveals are matching in the same going through going the hallway into
the bathroom pocket door make sure that if you do hang trim on a pocket door you have the
appropriate size nails in your brad nailer so you don't nail all the way through and hit the door
or in some cases you nail the door in place it's all something to keep in mind the utility room
and inside that little closet do remain unfinished just for some storage everywhere else does get
flooring and drywall and trim on both sides like the closets and that storage room off the living
again because of all the door openings and all of the windows there's a lot of trim to hang
there's a little bit of a specialty trim again we were trying to match upstairs the builder of this
house did a wonderful job looks beautiful upstairs so I had tall order to fill make everything look
cohesive as far as downstairs I think it turned out great here we I am going through and putting
in all of the baseboard of course all of the corners are coped because as everyone well knows
no corners in houses are 90 degrees so by utilizing coping method it makes sure that all
of your joints look perfect it was really as big as this space was there were only two seams in the
entire basement I of course got 16 foot baseboards and was able to use full length boards throughout
the entire space and so there was no awkward seams no anything to worry about as far as
filling and sanding and those things made my life a lot easier potentially a little bit more waste
the end result is well worth it working my way through the bedrooms in through each and every
single closet making sure all those look nice and finished as well as you can see I use a really high
quality stud finder and so as I'm nailing in that trim I have the stud finder in my hand and I'm
dragging it along the wall every time I see a stud I make sure to throw at least a nail in that stud
to really secure those that baseboard to the wall and here's the two spots where those seams were so
that long stretch of wall along the back was the only place that didn't have a way to break up those
and so I was able to use three pieces of baseboard two seams I use ca glue with an activator to make
sure it's a really strong joint and then I go back and actually use more of that shellac based primer
to get a really hard finish that can then later be sanded down and filled and then once it's painted
you can't even see those seams at all so there were two air returns along this back wall and I
just decided to do a return on the baseboard as opposed to going into the side of it I think it's
one of those finishing touches that looks a lot nicer I added some more returns of the baseboard
in areas like here on the stairs this part of the trim was really fun these are called crosshead
moldings they go up above any door or doorway they were a little bit hard to find ones that
matched the ones that were already upstairs once I did find them it took a little while to make
them I actually had to go through and cut off each corner glue them together make the tops and then
go through and nail those and I think it turned out wonderful it matches perfectly so the pocket
door as well as the small door into the little playroom were the only ones that weren't drilled
out as far as doorknobs and latches so here I am getting those drilled out and then I actually put
all my doors accordion style to spray those I didn't get any footage of the trim or doors being
sprayed but it's just a white paint so it'd be a little bit difficult to see anyways so here I am
painting the bathroom and one of the bedrooms actually at this point that I decided to bring
in a painting subcontractor I decided that it would be much more cost effective for me to hire
someone else to finish the rest of the painting and I'm so glad I did he was able to go through
get everything else finished up went through and touched up all the areas that I had screwed up
and because of that I was able to get on to other aspects of the job made the whole thing a lot
quicker so while he was painting the rest of the space I got to putting the bathroom together so
here I am bringing in the really nice beautiful vanity with a marble top and actually after this
project was done the homeowner felt that this bathroom was the nicest one in the house and so
throughout the rest of the house I went through and put marble countertops on all of the other
bathrooms to make sure we matched this one makes you feel good when the project that you do ends
up becoming one of the nicer rooms in the house so much so that you had to up the quality of the
other rooms to make it match so I felt really good about that got that all installed mirror hung up
light fixture now here I am putting in the glass doors on the shower this is just a store-bought
glass sliding door it's a great solution for a basement bathroom or you know more budget friendly
as opposed to going with like a custom tile and then a custom frameless glass door
I really like these products this is actually just from Home Depot really easy to install
really durable makes really brings out the space there's several different trim colors you can get
to make sure that you match the rest of the the trim as far as the shower and the faucet
and then after that shower door was put in went through to get the toilet installed and then just
going through and getting some finishing touches of course doing a nice caulk line around the
vanity to get that sealed up we also those faucets turned out so nice we ended up replacing all the
faucets in the rest of the house with those same ones as well so now that all the painting is done
all the trim is sprayed the doors are sprayed and all the walls have been painted I'm going back
through and mounting all those doors the doors actually came with a brushed nickel hinge but
the rest of the house had black hinges so I purchased a bunch of black hinges and was able
to put those on putting the closet doors in as well as little handles or poles that go on those
doors matching what they already had upstairs of course and as you can see here we put I put in the
little playroom door with a legitimate doorknob all the hinges everything else look exactly the
same as everywhere else so it just keeps cohesiveness so really going coming on the home stretch now
getting the closet rod and the closet shelves in so now that everything's done I was able to pull
up all of the masking on the floor and go through and do a final cleanup I got a nice little push
broom style mop and went through and just scrubbed everything any imperfections you can see I get down
and scrape those make sure everything looks really nice and after everything was finally complete
this is what the final product looks like this was a really fun project I think it turned out
beautiful working alongside the homeowners and their family was such a joy I had such a great
time they were so receptive and appreciative of everything that we did I'm so excited for them to
be able to use this space they have since the project has been done their 17 year old son has
already moved downstairs into one of the bedrooms he loves the bathroom having his own space down
there they are moved in a ton of furniture into the main living space already they have a pool
table and foosball tables ready to be moved in the main piece of it too is this added a ridiculous
amount of resale value to their home the basement total is about 2 000 square feet we finished about
1300 square feet of that added two bedrooms a bathroom a lot of living space and a lot of
storage so this is going to be great use for them as well as the next owners of this house
I think the design and everything turned out gorgeous everything looks great it matches
upstairs from the door panels the doorknobs the bathroom fixtures the flooring the paint colors
everything looks like it's one cohesive piece I myself am very proud of this project I think
it turned out great one of the bigger projects that I've taken on and couldn't have been happier
about it from the big changes that were made all the way down to the fine little details around the
windows some of the baseboards some of the returns dealing with different obstacles and challenges
and overcoming those and overall this was such a joy such a great project really happy with how
everything turned out hey guys thank you so much for taking the time to watch this video if you
like this type of content please hit that subscribe button we have a bunch of other content coming your
way in fact I'm on a job site right now we're getting a basement finished up so make sure you
stay tuned for that if you like this video please hit the like button that shows the youtube algorithm
that there's good content going on over here and shows it to more people I'd really really
appreciate it again thank you for watching we'll see you next time