Hey everyone, Zach here with Zim Construction bringing you another remodel video.
In this video I'm going to show you each and every step that I took to take this bathroom
that was completely original to the house. The only update that was made was the toilet
and turn it into this beautiful luxurious bathroom here. I'm going to go through and
pull out the bathtub, all new vanity, new paint, trim. The main piece of this project was expanding
on the bathroom size. So this closet right here runs the length of the bathroom and is a little
bit awkward and wasn't used very much by the homeowner. So they felt that they'd rather have
a large bathroom to leave enough room for a big walk-in shower than have that closet.
So that will be one of the main steps in the process. There's another look at the closet here.
We are going to be pulling off all that tile. I'm going to be very strategic about what drywall we
do pull off and reuse some of it. But of course we will be adding all new green board or cement
board in its place. So one of the first steps in any good remodel project is demolition.
So because I wanted to reuse some of the drywall I was very careful about how I pulled out this
vanity as well as didn't want to cause any damage to any of the plumbing fixtures.
Like I mentioned earlier that toilet was updated somewhat recently so we are going to reuse that
When removing a nice big portion of tile I've always found it's easier just to score around
the drywall in exactly where you want it to go and then you can actually pull the tile
chunk off all in one piece. Do keep in mind it is going to be quite heavy and if you do need
to break it in half or a couple smaller chunks so you can carry it that's probably a really good
idea. But everything came out pretty easy. I did decide to go with pulling out that wall first
and work my way around as opposed to going the opposite way with all that tile. There was a
light switch that came down through this wall so I was very careful not to damage that in any way
and fortunately for me it is on a separate circuit so I was able to turn off any power to that
completely while still having light in the bathroom. Once I got that wall removed I kept on
working my way around and come to find there was actually a pretty large space on the right side
right there which comes in handy a lot later. So after pulling the tub out of course I found a big
blob of mortar underneath the bathtub. It is very common practice to do this and I end up doing that
as well but we will have to chip that out later. So of course when we got the jackhammer to remove
all of the old floor tile having the jackhammer made really quick work of this. I did try
doing it with a hammer and a crowbar it just was taking way too long so the jackhammer was a savior
in this aspect of the project. Getting all those chunks cleaned up and here's what I was talking
about before with that big mortar bed that goes underneath the bathtub. I just had to go through
and break up as much of it as I could to get everything as flat and level as I could. Then I
went through and did some a little bit of extra cleanup with all the mortar. One big piece of
this project too in order to have enough room for a nice big walk-in shower is we wanted to move the
toilet to the left about six inches. So all I did was uncover where that plumbing pipe was find out
where it ties into the main drain line and then added a slight elbow a 22.5 degree elbow
with a little bit of an extended three inch abs pipe and just by adding those two little pieces
I was able to move the toilet flange over just exactly where we wanted it to go.
This does have a little bit less room for the vanity but we ended up choosing a single sink
vanity instead of a double so the spacing actually works out great. I need to do a little bit of
plumbing adjustment as well over where the bathtub used to be. I wanted to move the drain away from
the wall as much as I could but also needed to sink it down a little bit because bathtub drain
is a little bit higher than the surface so I had to make some fine-tune adjustments here.
After everything was cut to size and looked good where I wanted it went back with some abs glue
permanently fixed all of those drain lines in place including the toilet flange you can see
right here and after those were all set I backfilled in as much as I could leaving plenty
of room for a nice thick concrete patch and then went over with a concrete mix. I did use a fast
drying concrete mix and I wasn't too worried about the finish I did make it as flat as I possibly
could but it is all going to be covered so I wasn't too worried about what it looked like.
Getting everything cleaned up for the next step in the process so after all the drain lines were
ready to go the next step was to start building the framing for the walk-in shower so I added
a dividing wall right here adding tons of support so it was very stable didn't rock or wobble at
all tied into the joists and added a ton of anchors into the concrete you can also see that
I used my laser to make sure everything was lined up and square and both the dividing walls on
either side of the walkway were perfectly square to one another again adding a little bit more
support for that wall as you can see that little room that I was talking about back there
came in handy that being able to get back there for certain aspects of the job
so on this side the homeowner asked if we could do a shower bench which I thought was a great idea
there's plenty of space so putting a bench right here is going to be a great use of that space
of course when building any surface that is going to have water near it you need to make sure that
it is sloped you do not want to have any perfectly flat surfaces where water can just sit and stand
because that can cause issues down the road so any flat surface including on top of the walls
the benches of course the shower floor and then the curb those are all going to be sloped
a little bit the rule of thumb is a quarter inch per foot of travel anywhere that you can go and
that's true across the board and plumbing drainage shower tile even the bottoms of the
shampoo niches that I'm framing in right here they will all get a slight slope so getting those
shampoo niches installed I just pre-built them and then screwed them in in between the studs
that seemed to work out really well so the next is adding the lights over the top of the shower
again I just used the same circuit that was in the closet lighting before
just fish the wire through from the switch adding two of those lights up through the top
there was some joists in the way that was actually running perpendicular to the direction of the
so I just had to get a nice long drill bit and work my way through those joists and then
get some fish tape and fish the wire through it's a little bit tedious but it ended up
working out just fine the lights that I end up using for this project are
great product that I will end up using significantly more in remodel projects down the road
and they actually don't use a can they actually attach to the drywall and the box that everything
is wired into is a completely separate piece that can just be floating up inside the drywall in
between the joists so everything is wired in and then the light actually clips onto the sides of
the drywall here I am getting everything nice and stapled in but with those lights they work
significantly better I think that install is way easier and the coolest part is you can actually
adjust the color temperature to fit your house so both the homeowner and I were very excited about
that we felt like we could make those adjustments later down the road and again with the ease of
install of course that does come with a little bit of a higher price tag but the features that
come along with it are well worth it in my opinion so after all the electrical is buttoned up I need
to go through and make some adjustments to the plumbing so pulled off that drywall there and
since there was two sinks before and we're going to be putting in a single sink I just had to cap
off some of those drain lines and water lines and then move the sink line over just a little bit
make room for that single sink we also are doing all new shower faucet handle valve so all that
was going to be updated as well of course using all pex products shark bite products
super great for installation any plumbing in my opinion the install went very well went nice and
smooth you could tie into copper pvc anything went very smooth so after all that plumbing was
buttoned up I was getting ready to put the drywall back on so I went through and added
blocking in a bunch of different places so that I could have good adhesion and plenty of places
to screw in the new drywall to any drywall that I replaced I used the mold resistant green board
it wasn't very much that I needed so I just bought two full sheets of that and ended up
having plenty of extra worked out great so you can see I'm kind of going through and scoring
some of the old drywall making sure that I'm going to have a nice solid seam everything is
going to get mudded and taped of course but the less gaps that you have early on the easier that
makes your life down the road so after all that drywall is put in and secured just going through
and taping those joints this is very small little space so I ended up using a quick drying mud for
each step in the process just to allow a little bit more efficiency when doing the mudding and
taping this was a multiple room remodel or a big basement or something just a standard all-purpose
mud or taping mud does work great just of course it does take a little bit longer to dry since
there's only a couple spots and I was really hopeful to get multiple coats in one day I did
end up going with the fast drying mud and then overall I think it worked out really well so just
make sure when you are doing some tape you put plenty of mud along the seam put your tape over
the top and then squish out as much of that mud as you can but also making sure that you have plenty
of coverage underneath that tape so I'm getting all of those buttoned up even where I knew that
tile was going to be over I still wanted to add some mud in there just so we could have a nice
flat surface for the tile to sit after the first coat was nice and thick I did go back and knock
some of those edges down although I ended up doing four coats total one tape coat and three top coats
and sanded lightly between each one I also went through between the coats and did some
sponging with a little bit of a damp sponge just to get off any of that excess dust
so here I am going through adding and yet another coat of that top coat the drywall work that was
done previously was done fairly well so I wanted to ensure that everything looked cohesive and
matched there's also some spots where the old shelving was and that was in the closet that
left a couple holes and dings and dents and also when I scraped off some of the caulk lines a
little bit of that surface came with it so I wanted to make sure to go through and patch that up
also when I was sanding I was making sure to knock down any of the previous texture
so that I could feather out these new pieces of wall as much as possible I am going to eventually
go through and re-texture the entire room so that everything does match and look really nice
so one of the creative parts of remodeling bathroom is dry time so while the mud was
drying on the walls I felt like it was a great opportunity to start working on the concrete
shower pan so in order to make sure that there was really good adhesion between the concrete
shower pan and the concrete slab that was supporting the rest of the house I used a
layer of thinset now it's with that the white thinset was there and so I troweled that in and
then packed the dry pack over the top of that to make sure that there's a good bond and then after
the pre-slope was all sloped again with that quarter inch per foot I go through and add the
pan liner because I have all those blocking around the perimeter of the shower pan this
makes the pan liner install go nice and quick I did use a three-piece drain that was glued in
to the pan liner and also the bracket underneath to make sure great seal great bond I did use my
laser to go through and mark a level line just to make it a little bit easier when I do end up doing
the final dry pack mud so when you're doing a quarter inch per foot that goes for the longest
distance so I measured from the longest distance into the corner and did my quarter inch per foot
and then did a nice level line all the way around matching that same distance so even the long sides
do have that plenty of slope and then when you're putting in the dry pack mud just use a screeding
screed and a level take it nice and easy plenty of time it's way more important that this is
flat and true and sloped properly so again going back and forth with different mud products
using the dry time efficiently as possible putting I want to say that this is the final coat of
mud that is feathered out to add a nice flat surface so after the shower pan was all done
next steps going through and adding the cement board so I know there's tons of different ways
to do showers this method I use might be a little bit slower than some of the newer methods out
there but this is the one that I've been taught and I've been using for years now and it's tried
and true never had any issues I am interested in learning about some of those new shower systems
that everyone is talking about but in this project I just decided to stick with what I know
so going through wrapping up anywhere that's going to have tile underneath it is going to
get cement board within the shower including inside those shower niches and then after all
the cement board was installed I go through with a mesh tape and cover all the joints and seams
after all the mesh tape is in you go back with a fast drying mud compound and that mesh tape
allows for the mud to hold and stick and gives it a place to stay here I am adding all that now
so any joint or seam is going to get a nice thick coat of mud just to make it a solid surface
waterproof plane this will be getting a waterproof paintable membrane over the top of it
but anytime you can make it flat and level underneath is what you want to do
so I waited to the last second to pull off the light fixture coming to find out that the
junction box or the light box was way off so of course that added a bunch more work for me
but it was not that big a deal I ended up doing it off camera real quick just added a little bit
more drywall work so going through getting everything removed and masked off prepping
for the first coat of texture now that all of the seams have been taped mudded and filled
I also didn't feel like I wanted to get a bunch of texture all over the
shower because I'm going to be applying a waterproof membrane over that and so I figured
if I can might as well avoid getting orange peel texture spray all over the shower so I have a cheap
Home Depot texture sprayer that for these small types of job actually work
just fine for this application actually worked great one of the things I do when I am applying
texture over finishes that are already done like a pre-painted wall for example in this case I
actually dump a little bit of an all-purpose primer into the texture mud just to give it a
little bit more adhesion let it stick a little bit better so after all of the texture was done
I started the process of waterproofing so again I've mentioned this in a couple other videos there
are several different ways to go about waterproofing a shower properly there are tons of
videos all over YouTube that show you all those steps this process that I went with was using
a paintable membrane red guard in this case there's tons of other products that are very very
similar I also used a fiberglass mesh to add even more protection in the seams and corners
so paint on a thick layer of the paintable membrane press in the fiberglass mesh very similar
to like a paper mache or something press that in there and then go back over that again and
just completely encapsulate that fiberglass with the waterproof membrane as you can see I'm going
through all around the bench in the shampoo niches anywhere that two seams meet together
in a corner and then all of the rest of the surfaces will actually get rolled on so painted
all the corners and the places with the mesh will get three coats and the main surfaces will
actually get two coats rolled on here I am applying the second coat and this all gets
completely wrapped all the way around from the floor to basically as high as you want to go I
mean there's no way water is going to get up that high but just add a little bit of peace of mind
so a homeowner elected to have a pebble shower floor which is very popular nowadays so I'm going
through laying that out I've done pebble floors in some other videos and the goal with these is
try to make as little of cuts as possible make it look like it's just meant to be that way all
the pieces are as large as possible I did go through with a thinset and raise the floor up a
little bit there was some confusion on how thick the pebble floor was or the pebble tile was and
it was actually a lot thinner than we had originally anticipated so I had to raise the
floor up a little bit with some thinset and to make sure that the drain would drain properly
so that's where you saw that white layer down there first so actually one of the things that I
do is completely finish the floor before any of the tile and so that I can actually rest the wall
tile on top of the finished floor so that as water drains down the wall it will just hit the floor
and drain into the center of the floor into the drain so as opposed to putting the floor in last
where water can seep down in between that grout line I just elect to do the floor first it does
add an extra step and also there's some masking involved but in my mind it makes a lot more sense
to have the water run from the wall to the floor first as you can see I put some cardboard down
to keep that safe while the rest of the tile process goes on so again I mentioned it in several
of my other videos but I elected to use a laser again to keep everything nice and straight all
the grout lines and I'm using a nice big half inch by half inch square notch trowel to apply
these wall tiles they are 12 by 24 of course back buttering every single one I really did a lot of
work to try to prepare to have these shower niches line up perfectly with the grout lines
of course with a little bit of extra measuring and time to prepare for all that it worked out
really well these shampoo niches and all of the half walls are actually going to be getting an
aluminum corner trim so I have a little bit of wiggle room there but they're the precision at
the end is very very important so after that was all lined up and perfect I continued on
I do like to do the back wall first just to make sure that that's where your starting point is
that's obviously where your eye gathers and everything the shower niches were super important
so I wanted to make sure I got those done first and then when the grout lines will make sure to
wrap all the way around the shower but I knew that I didn't have any freedom of movement as far as
moving up and down because of those shower niches so I liked to do as much as I could on
the back first before starting on the sides of the shower of course using a tile leveling system
I actually since this video I actually found a new system that I like significantly more I'll
actually be sure to leave that and several other tools and things that I like to use
down in the description so once the back wall was up to where there was about one row left on the
top I started doing the side again utilizing the laser to make sure that the grout lines are
wrapped all the way around nice and straight having a good level shower floor does make a
huge difference in this process there are several different ways to do it in other videos I actually
have used blocking before to do the second row first and then come back and then apply the first
row afterwards so that I can have custom heights but if at all possible I like to make the shower
floor as level as possible to then be able to have my first row actually sit on that floor of
course with some eighth inch spacers so one of the things that the homeowner really got creative
about was their tile selection so several different colors and finishes and they're very excited about
the different shades and transitions that they were going to have and of course I wanted to
do my best to make those look as good as possible they went with a little bit of a beveled subway
tile on the outsides of the walls with the same mosaic that goes in the back of the shampoo niches
along the bottom again like I mentioned earlier all of these corners are going to have aluminum
corner trim to have a good transition between different tile pieces of course I think it turned
out great with subway tile like this I find it's a lot easier to pre-cut as many of the tiles as you
can of course there's going to be situations where you had to custom cut some of them but if they're
pre-sized and ready to go it does make the installation go a lot faster and grout lines
do line up significantly more with a little bit of preparation and the top row is almost perfect
a full piece of tile as far as the 12 inch distance there was a couple spots that I had
to make some adjustments but it was so minimal that you could barely even tell
so I was pretty uh pretty excited about that from the shower floor using a full piece of tile all
the way up to the ceiling is full full sheets so there's no thin pieces or weird grout lines or
anything like that so now I'm working on the half wall as long as the curb that's all one continuous
plane getting the aluminum corner trim pieces prepped getting those all thin set in there
and they are several transitions I mean these wrap from the top of the wall up to the side
of the wall down there's three-way corners going through the tops and coming down and then
of course through the shower curb and again I mentioned this several times and I'll probably
mention it again a little bit of prep work in certain situations like making sure your wall
is straight making sure the cement board is laying flat all of those types of things do make the next
step in the process significantly easier again doing my best to line up grout lines where I can
but also not having excess grout lines in places where I don't really need them here for example
but the wall was just a little bit taller than that 24 inch tile so I had to go with a smaller
piece right here and ended up working out great the transition as far as those corners looks
seamless once it's all finished up of course using tile leveling system anywhere that I can
now doing the top of the wall of course this section right here that I'm working on as well
as the curb and the other little section of the half wall and the bench itself now and even the
shower niches all of those do have a slight slope so that water can run off back in towards the
shower towards the drain the homeowner elected not to have a glass shower at this point they
felt it was big enough that they could just have a nice open concept walk-in shower so
there is no nothing keeping the water in so of course wanted to make sure that everything was
sloped going through and getting some of the last sections wrapped up one of the things you know
tiling leveling system does work great but in some situations using a little bit of blue painter's
tape is really really helpful now I'm going through and I'm actually priming that trim they
wanted to paint it white and so going through and painting some of those areas and after the
first coat of primer was on started laying out the floor I wanted to do the floor first in this case
so that I could put the baseboard trim on top and have like a nice seamless gap all the way around
or lack thereof a gap this situation was kind of interesting if you look closely there's only like
three or four different patterns of this tile they were the homeowner was actually quite
disappointed showed up and there's just so many duplicates and so they worked really hard the
night before I was going to put the flooring in and actually arranged the entire floor out in
their garage exactly how they wanted it so I was very careful to carry in the pieces in the same
order that they had laid them out you know things were turned slightly and I think it actually
turned out great they did a great job at making it look and appear random no repeating patterns
so after all of the tile was in I wanted to go through and start preparing for grout so putting
the grout on we did use a light gray grout that does work with some of the other furniture that's
going to go in here as well as work with all the different colors of the tile I really encourage
them to try to pick a grout color that we could just so we just have one that is used throughout
the entire bathroom I feel like especially when you start getting several different colors of
tile incorporated in the bathroom if you could have one aspect of that color be cohesive it does
help a lot with the overall look and so picking a light gray grout with all of these different
colors of tile ended up working out great going through and getting all that pressed in there
grouting can go pretty quick again like I said many times a little bit of preparation before
doing the grout process so getting all the thinset cleaned out making sure there's no excess thinset
squeezing between the cracks or even on the surfaces of the tile does make this process go
significantly quicker and just like the old expression paint yourself in the corner don't
grout yourself in no corner either so plan ahead a little bit make sure that your last section of
grout is by the door especially when you're planning on doing it all in one step so now that
the grout is all dried and cleaned up let's start getting the furniture moved in so the vanity that
they had actually purchased was uh the way that it was set up originally the drawer could not
open because it was too close to the wall and it would have hit the trim and so I called the
owner in and said okay this is the situation and they elected just to move it away from the wall
slightly so they were not worried about that at all they had kind of anticipated that anyways so
there is going to be a little gap on the left side of the vanity again like I said they were not
worried about that at all so now that all the baseboard is laid and caulked I'm going to go
through and start painting now so of course I wanted to mask off all the tile so I didn't get
any paint on that I did run out of plastic so I got creative and used some garbage bags and
different things like that I did go with using an airless sprayer wherever I can I do elect to spray
if possible I just think it is so much more of a consistent finish it does lay lays a lot of
paint on there if necessary you can go through a back roll but the overall look is so much better
especially with trim and even doors and things like that if possible I will try to paint
the and spray the trim and doors with the semi-gloss white in most cases also to save some
time I did go with cutting in by hand the gray so that I could paint all of it on the same day
I did allow a couple hours for the white ceiling and the trim to set up a little bit before I went
back through and cut everything in by hand now everything was all painted I could start getting
rid of all the masking really gumming in the home stretch now getting really excited we with this
project there's tons of issues with ordering materials and and things like that but it ended
up working out great the homeowner was very understanding very flexible about different
situations so I was very happy to get this one finished up it did take a little bit longer than
expected but sometimes that is the case with with renovation projects we're going through now and
just getting everything installed got that new light fixture installed getting the vanity hooked
up countertop in plumbing drain all of that hooked up you can see there there's the little
gap that I was mentioning before now we're going through and putting the actually original toilet
that I had taken out back in like I'd mentioned this toilet was new they had recently purchased
it and so of course there's nothing wrong with it so we put it back in of course getting new
wax rings and new fittings new valves those things so going through and getting the countertop all
caulked in and sealed around the edges getting the handles and everything put on and then in
certain situations like that mirror I actually brought the homeowner in and either we could have
had it sideways horizontal or vertical so I actually brought her in and said okay you know
exactly which way do you want this so there's no confusion and and I didn't mess it up so we
decided which the best way was to go so now that all the grout was all dry and I've made sure to
buff all the haze and everything off I'm starting to go through and get the plumbing shower fixtures
on going through and wiping everything down again it looks like so now after the grout and everything
is dry I do like to go through and silicone caulk all of the seams one last time of course I get a
sanded silicone caulk that matches the same color as the grout so anywhere where there's a transition
or a seam I could go through and once everything dries you can't really differentiate between the
grout and the caulk but it does add a little bit of more waterproof water direction now I'm going
in and hanging up the towel bars you can see there's a nice big storage cabinet that we had
brought in also of course getting the finishing touches the fan cover there well that's actually
where the old light switch came down so of course I had to make sure that that was it became a
junction box that was accessible and then put a access panel over the top of that so now I'm going
through now that everything has been caulked I'm going through with a grout sealer so it's an
impregnator I like to do it over the top of the silicone I figure an extra layer of protection
over everything can not hurt so just going through and wiping all that on over all of the grout seams
and see here are some final pictures that's exactly what the homeowner was looking for
of course everything looks straight and seamless and all the grout lines match up
all of the different colors of tile turned out great the homeowner was very excited and
it has been several months now since I finished this up and I've actually heard
that they elected to shower in this bathroom and use this one more often than the one that
is actually attached to their to their bedroom which makes me feel great that they're so excited
about it that they actually go to a different section of the house in order to shower and use
the restroom so but I have to give it to the homeowner picking all of these colors and tiles
I was a little apprehensive to be honest with all of the different things they had going on but
once it all came together especially with the cohesiveness of the grout I think it turned out
awesome so thank you so much for watching this video I really appreciate it if it is
your first time watching these videos I really appreciate if you smash that subscribe button
I post as often as I can all of these videos of course with all of the craziness that's
happening in the world right now there was a little bit of a lull there but we're back in
so again really appreciate you watching and we'll see you next time