Hey guys, Zach here with Zim Construction bringing you another remodel video.
In this video I'm going to show you how we took this completely bare,
unfinished, scratched concrete basement and finished it into this beautiful
master suite with a big master bedroom, living space,
and a big bathroom with a beautiful walk-in shower.
So we're going to do things a little bit differently. Normally I talk more in
depth about materials and the processes and those types of things,
but I want to break it down more about what the homeowner
There's obviously a lot of different ways that we can go about figuring out a
final plan for your space, whether it's a kitchen, bathroom, basement,
even the entire house. One of the ways that I really like
to show what I'm thinking is actually we utilize 3D renderings like this.
So obviously you saw what the basement looked like prior. I'm able to take those
dimensions, draw out a floor plan from a top view, and
then the software I have is relatively
detailed to where I can give the homeowner a pretty good idea of what I'm
thinking. As you can see, these renderings
actually look a little bit different than what the final product will look
like, but it is so nice to be able to have a
starting point that the homeowner and I have
that we can refer back to. Okay, yeah, we like this, but we want to move the wall
this way, for example. Or we, in this specific case, the homeowner
at first they thought they wanted a bathtub in their bathroom, but then once
I was able to show them these renderings with the dimensions that they actually
had based on the measurements that I
actually took in the real world environment,
they ended up deciding that they didn't want a bathtub. So it was a very nice
feature. In this case, I often use it as much as I can so that we,
like I mentioned, have a good starting point, a reference that we can come back
to, and sometimes we can even get into
colors and those types of things as well so they can have an idea
what that is going to look like. I know a lot of you guys are awesome, you guys
watch all over the world, but some of the people that watch these
videos are actually clients of mine or future clients of mine,
so I want to show and tell a little bit about what to expect
from the business aspect when you're working with Zem Construction.
Hope that makes sense.
Alright guys, so first step in any process that we do
when finishing a basement is, of course, the framing. In this case, the
insulation was already done, and so one of the things we did a little
bit differently, you will notice that we actually used 2x3s instead of 2x4s,
and that was to give us more space for the insulation that was already there.
Traditionally, we go through and hang the insulation in between the studs,
so a 2x4 in that case works great, but because we wanted to maximize the
square footage for the homeowner, that was one of their main concerns
obviously when finishing this basement was
they asked for as much square footage as they possibly could.
The other reason we did that goes into pocket doors and those types of things
as well, so any floor space that we were able to maximize,
we made sure to go about doing that. The most efficient way that we have found
when working with 2x4s and doing all the framing is we
pre-assemble as much of the walls and the soffit as much as we possibly can
just to save time and efficiency. Of course, when you hire us,
one of the things that you are concerned about is how quickly you'll be able to
utilize this space, especially in a basement. Homeowners often
store a lot of things downstairs, so when we're down there working, that's
a huge aspect of your house that you are no longer able to use anymore,
so we fully understand that and we want to get in and get out as quickly as
possible, so anything we can do to maximize
efficiency and those types of things is something
we really strive for. In some cases, like me
going around this window, it's a little bit easier to build it in place, but
other than that, we try to pre-assemble as much as we
possibly could. As you can see right there, Cody was actually lifting the wall
into place. We have tolerances that we use to make
sure we still have good structure and stability, but
we also want to make sure that we can get
that wall into place fairly easily without having to beat the crap out of
it to get it in. Of course, all of these walls are
non-structural, so using two by three, a little bit of a thinner wall
does not make a difference at all. The only purpose for the walls is actually
something to run wires through, something to run plumbing through, and
then to hang the drywall on itself. Like I mentioned earlier, as far as
insulation, you need an R21 minimum insulation where
we're from up here in the northwest. It may be different in your area, so of
course if you are hiring a contractor outside of this area, make sure you talk
to them and get those things figured out. So this
doorway, as you can see right here, is a little bit wider
than what you would traditionally see a doorway, and that is because we are
actually going to be putting a pocket door here. So of course,
pocket door, that's something to think about when you are wanting to have a
pocket door. You can't do it in a wall that's fairly narrow.
The wall needs to be over twice the width of the doorway that
you want to put in. So for example, we did
32-inch doors throughout, so we had to have at least
64 inches of space in order to put that door
in its spot. So we have that doorway right now, it looks really big, but once we put
the pocket door framing and the hardware in place,
it will make a lot more sense. So right here, we're actually building the
back of the shampoo niche. Also something really important to talk about with your
contractor, storage once you're in a shower, and
that is something that needs to be done at this point. If you
don't bring it up with your contractor or us sooner,
once the walls are sheeted, insulation, everything's done,
it's really difficult to add shelving and shampoo niches and those types of
things after the fact. So make sure that is planned out prior.
Also, I'm a huge stickler for cleanliness, neatness,
where the niche lines up with the grout lines of the tile. So the more time that
someone like myself has to plan that out, the better.
So right here, we're actually putting in all the framing for the pocket door. So
under this beam, the homeowner actually asked for three
pocket doors, which because of the spaces I was
talking about earlier, takes up almost the entire width of the
room. As you can see earlier guys, I was cutting off
the bottoms of those steel studs that we ended up using for the pocket door
framing. The reason I did that was because the
steel beam that is actually structurally holding up the rest of the house
obviously is a finite height. We're not going to mess with that height at all.
And so in order to get all of the pocket doors to fit, we had to
adjust those frames. Later in the video, you guys will see me make some
adjustments to the doors themselves as well.
But it'll all make sense once we do that. So one of the things that's really
important, especially when finishing a basement, and really any room depending
on where it is, but if there's a floor above
or below, is soundproofing. There are endless ways that you can soundproof a
room or a basement or any space. Of course, that comes with endless
amount of money that goes into it. I think that
the most efficient way about doing that is using what we
call a rockwool insulation. That's actually a brand name that now we use
to describe all of that type of insulation. It's like a wool
product that you actually put up inside the joist. It
dampens a lot of the sound. In other cases, we can really get into
some things that suspend the drywall from the actual studs as well so you
don't have that sound transfer going through the walls.
Like I said, there's lots of options depending on how important it is.
For example, if you have a YouTube studio or you're a musician and you have
playing music downstairs, you don't want all that noise going and traveling
upstairs as well as noise coming back down when you're trying to record.
So I've mentioned this before in several of my videos, but how we build a
shower is pretty important in how you go about doing this. This method I'm
actually using, I did explain it to the homeowner and went through all the
different options with him. I informed him that at this point, this video is
several months old now. At this point in time, this was the method that I'm
very familiar with. It's called using a pre-slope in a three-piece drain,
Redguard for waterproofing. That system has been around for years. It's
tried and true. It's very, very widely used in the industry. Anyone doing
tile or shower installations is going to be very familiar with it. It does
get a bad rap, especially here on YouTube, because there are a lot more
modern systems that work really well. Like I said, at this point in time, I
wasn't super familiar with those other systems, so I didn't want to use
something that I wasn't familiar with. Of course, my entire goal was to make
and create a product as best as I possibly can to give the homeowner the
best product I can. So we are doing a pre-slope right here in this process,
but some of the other things and systems that I've used, of course, is
Schluter, which I think is the most widely known shower waterproofing
system. It's all the orange stuff. You ever see people putting tile up and
there's a bunch of orange stuff all over the walls? That is called Schluter.
That product works really well. My favorite, however, is a TilePro system.
That's actually the most readily available system that my supplier uses.
I love that system. It's very similar in a lot of ways, but also has its
advantages and disadvantages. So something really important to discuss
with your contractor, whether it's me or someone else, is waterproofing. If
your contractor is hanging tile directly on drywall or Durock or
some substrate that is not waterproof, it is really important that you
discuss that with them and make sure that they are providing you a proper
product. So one of the things that is obviously super important as a general
contractor, there's a lot of things that I'm pretty good at, but I'm not
excellent at everything. And like I mentioned, one of my goals is to, of
course, produce the best product that I can for my clients. And sometimes
that means bringing in a subcontractor. For example, as you can see here,
drywall. So I can hang drywall. I can take texture, mud, all that stuff.
However, it is not something I do every day. It's not something I do all
the time. So in this specific case, I like to bring in the drywall
subcontractor. There's a lot of different trades that obviously need to
be subcontracted out. Electrical, plumbing, drywall. I use a painter as
well. I don't use a flooring contractor because one of my employees has a
lot of experience with flooring. So I utilize him in that way. And then I
really enjoy the framing tile and finished carpentry aspects of the job.
So every general contractor is going to be different. There are some out
there that do absolutely nothing and they subcontract out everything, which
that has its merits as well. However, that being said, I would ask and make
sure that the contractor you're using is worked with the subcontractor that
they are bringing into your home before. It's okay if they haven't, but it's
just something that you want to keep in mind. For me, I've been working with
these drywall subcontractors for years now and I enjoy them a lot. I think
they produce an incredible product and that's of course why I keep having them
come back. But this is really nice for me because I know that I can trust
them. I can bring them into your home, which is very obviously important to
you. And I know that they are going to do the best they can. They're going to
take care of your home. They're going to do their best at masking, taking
care of the air quality, masking, sanding, all of that type of stuff. As
you can see right here, we are getting ready to spray a primer. So the primer
that I actually like to use is a PVA primer. I've mentioned this before in
other videos, but I want to talk about why it's so important to me. The main
reason that I use a PVA primer, it's actually a plastisol based product. And
what it does is it soaks into the paper as well as the texture mud and the
taping mud of all the drywall products that we use. It actually hardens those
surfaces. Of course, this is most likely going to be a space that you're going to
live in. Hopefully we create a product that you want to be utilizing, have
people down into using as guest spaces, those types of things. And so anything
we can do to increase that durability of any of the products we install,
it's flooring, tile, paint, all of that stuff included. Of course, we're going
to take advantage of that. So using a PVA primer is very important to me.
Again, it kind of goes back to that soft close hardware as it's an insurance
policy for me and my guys. Of course, we have a lot of things we're still
installing, doors, trim, flooring, all of those things. And if that wall
substrate is actually harder and more durable, that's going to make our lives
easier too. If we do happen to ding something or bang something into the
wall, that durability will allow us to keep working, get our job done even
sooner. Here we are pulling up some of the masking, just another way that we
try to be efficient, take care of those types of things, allow for us to move
on to the next step more quickly. Of course, we're going to go through and
vacuum all that up, but now there's not texture, there's not mud all over the
concrete, that flooring products. In this case, we're going to be laying down a
is going to lay down just significantly easier, a lot better. We really take
pride in how well Cody is at cleaning up subfloor. Like I said before, he has
done flooring in the past and has some things that he brought from his
experience, and that is subfloor preparation is definitely one of his
strengths. I call the shop vac his magic wand, actually. It works really well.
This product that the homeowner picked out was actually a laminate flooring.
There's a couple different ways that I go about utilizing products and
figuring out what products to use in different jobs. When working with a
homeowner, or when I'm working with a homeowner, I have a little bit of a
process that I like to go through in order to pick the finishes that are
ultimately going to go in their home. For me, one of the most important things
that I like to stick with is I want to use products and materials that are
congruent to the rest of the house. When you are finishing your basement or
remodeling a bathroom or kitchen or anything like that, the last thing I want
is for that to not feel like it belongs in the house. Yes, there are some cases
where the homeowner is planning on remodeling the entire house, and so it
doesn't really matter what that specific space looks like. It's all going to
match that eventually someday. Some of the ways we can do that is matching
paint colors, matching flooring as close as we can. Sometimes we can find
the exact product. That is great. Trim finishes, door shapes, all of those
types of things we can. We can most likely find something that's pretty
close, or in some cases, exactly the same. The way that I like to go about
finding those specific finishes is there's two different types of
spectrums that I like to use. I'm going to use my hands here. There's the
person that knows exactly what they want. They're on Pinterest constantly.
They have sometimes even the product names that they like, and those are
great because then we can go and purchase those and get those installed
into their house. I can also do good pricing estimates on those products
themselves. The other end of the spectrum is somebody who knows nothing.
They don't have any idea about colors. They don't have any experience with
products, and I've worked with both ends of the spectrum and all the way
through the middle. I have lots of different ways that we can go about
that. Like I said, if somebody knows exactly what they want, of course, in
some aspects, it's a little bit more simple. Someone who doesn't know what
they want, I actually have designers and different suppliers that I use,
and I can set up appointments with those people, and it's actually their
job to find the specific product that works really well in your house, and
of course, something that you are going to like and enjoy. Of course,
every product is going to have its own recommendations from the
manufacturer. This product, it did have a pad built into it, so it's going
to be nice and soft, really good for soundproofing, but it did recommend
when installing over a concrete subfloor, so of course in a basement,
that we use a vapor barrier. That is, questions that can be asked when you
are going over different products with your homeowner is what the
manufacturer recommends. Layout, different conditions, moisture
conditions, where you are from, the location of the actual flooring,
where it's going, whether that's bathroom, kitchen, those types of
things, but make sure you look into that type of stuff. This product, for
example, is very water resistant, so it is allowed to go in a bathroom.
However, it is not waterproof, so if they had young children getting in
and out of bathtubs, I wouldn't have recommended using this product. Of
course, they didn't. This was going in a master suite where they can
manage their water and drying themselves off obviously a lot better
than children would, so I think this product will do just fine.
I have mentioned this before. I have a certain method that I like to
lay flooring in. There's a pattern that I like to use. The way my brain
works, I'm way too systematic to just pull stuff out of the box and cut
it and lay it down. I think you could run into some issues down the
road. Also, when you're working with two guys like we are or more, if
both people are on the same page about the pattern that they are using,
it makes life a lot easier, again, getting into that efficiency. If we
can work together and lay this flooring, I think we laid this flooring in
a day, maybe two days. Again, that's just another opportunity for us to
be efficient and get on to the next step. Another thing we do, and this
is often a question that comes up from the homeowner, is we are actually
laying the flooring pretty early, I would say, as far as where you would
normally remodel, the remodel process. We're laying it right after we put
primer in. The reason I like to do that is because I want to make sure
that there is minimal to no gaps between any of the base trim and the
flooring itself. We also like to spray all of our trim in place. I know
some people out there pre-paint the trim and then install afterwards. I
just don't think that produces a high enough quality of product. The way
we like to go about it, we get everything installed on the top of it,
mask the flooring, and then we can go back and spray all of the trim, the
doors, door trim, casing, window trim, all of that at the same time. It
allows for a much more uniform look that I think is significantly better
than doing it in parts and pieces. Yes, it does add an extra step of having
to mask the floor, but again, I think it's completely worth it. Also,
when we are moving things in cabinets, vanities, anything else like that,
even furniture potentially, the flooring is already masked. We use, of
course, a really thick X-Board product. It's a really thick cardboard that
allows for dings and dents to take place. If we drop a tool, for example,
or if we drag something across that cardboard, that's going to protect it
significantly more than, of course, not doing anything at all.
Again, another opportunity that we have to take care of the products that
we're putting in place. Like I mentioned earlier, guys, any opportunity we
have to plan things out, not only with the pattern, but where things are
going to go. One of the things that drives me crazy is when the flooring
is the same in two different rooms, but the installer didn't take enough
time to have that pattern into account, and so you have a transition strip
in the middle of flooring that is the same. Obviously, if there were
tile in the bathroom and laminate in the rest of the house, transition
strips make a lot of sense because you want that to be as uniform as
possible, but this entire basement all got the exact same flooring, and so
that was something that we definitely wanted to take into account. As you
can see right here, I'm actually cutting the bottoms off of the doors.
Like I mentioned previously, I needed to make an adjustment because the
height of the beam was finite. We wanted to make sure that all of the
doors could fit underneath. One of the things I did also is I made that
adjustment to all of the doors that weren't under the beam as well. Of
course, when you look, I wanted everything to be exactly the same
height. In this case, the bathroom door, we could have made that as tall
as we wanted, but we did shorten that as well so that it was cohesive with
the rest of the doors in the space. Any opportunity we have to make things
look the same, make doorknob heights the exact same, trim heights, all of
those things, we of course did that. The painter was going through
pre-painting the doors. In this case, we actually painted the doors first,
then mounted them within the hardware. Then we were able to do the trim and
go back and paint the trim later. Those doors were sprayed, of course, but
we felt that it would be a lot better to pre-paint, install, and then do
trim after that. I'm putting on all of the door trim now. It's a little bit
of a process here. I don't like to hide the edge of the door. I want to
just go right into the jam and be as seamless as possible. I'm using a
lot of different methods to ensure that that reveal is perfect. Of course,
shims is one of the great ways to do that. Shims, I think, is one of the
best tools that a carpenter has at their disposal. Going through doing
all of the casing around all of the doors, of course, we're going to do
that first. After all the casing is in, now we can go through and do all of
that baseboard. Like I mentioned earlier, the flooring is already
installed, so we don't have to do any type of quarter round or shoe
molding. I know in some parts of the country, it's very common to have
those things. Over here, it's hit or miss. Personally, if I'm the one
installing the trim, I'm going to avoid using quarter round if I can.
However, if the homeowner decides they want to put something over the top
of this laminate someday, they totally could. They could put that right
over next to it and then run a shoe molding or quarter round around it,
and it would look perfectly okay. In fact, I think they had some quarter
round in other areas of the house. Not everywhere, so I was able to have
that creative freedom and decide whether I wanted to do it or not. Of
course, if they did have it everywhere, I would then replicate that in
the basement. Like I said, they didn't, so I was able to choose for them
in this case. Going through, getting all of the baseboard installed.
Again, another subcontractor on site. This painter I've actually known for
over nine years now. I've worked with them in several different projects
in different industries. I think they, again, do an incredible job.
They were actually following behind me because they were on site.
We felt it would be efficient to have them there. There was a lot of
painting, a lot of trim. Pre-painting the doors was another big one too,
so he had all his tools in there, so we just obviously let him stay and
kept working. One of the most common things that carpenters joke about is
nailing baseboard to a pocket door. Of course, the pocket door is in the
wall right there, so if you were just to use your two and a half inch nails
and run that baseboard, it would nail itself right to the pocket door,
and that pocket door is stuck inside the wall. There's pictures all over,
there's memes everywhere about how to keep a pocket door in when
obviously that is not the goal. Different things to keep in mind.
Obviously, you don't need to be checking on your contractor about all those
types of things, but if you do see a bunch of putty holes in your pocket
door, you'll understand what happened. I like to use a CA glue on any of my
outside corners. I think that allows for those corners, those miters, to stay
closed over time. Of course, that is something that's really important to us,
guys. We're not trying to just get in, get out, do something really quick.
This is a space that will hopefully last 10, 20, 30, 100 years down the road,
so anything we can do to allow for longevity in any of the products we use,
we of course like to do that. Gluing those outside corners, there's no
possible way those will split, but waterproofing systems in a shower,
of course, is very crucial. Like I said, we went with a pre-slope,
post-slope, a PVC pan liner, a three-piece drain.
My drywallers actually use a Dentshield product. It's actually an exterior-rated
waterproof product on the walls. We like to go through and reinforce that
waterproof product with a Redguard. This is a waterproof paintable membrane.
Redguard is a brand that I like to use. It's in stock at Home Depot,
but there are other brands that have very, very similar products that
accomplish the same task. The next thing that we like to do
in order to further reinforce that waterproofness is using a fleece membrane.
It's actually a fiberglass fleece. It comes in a roll, kind of looks like
a roll of toilet paper, as you can see down there in the bottom right.
We will cut those and put those in anywhere that two planes meet,
so inside corners, outside corners, where the wall meets the shower pan,
basically the entire shampoo niche, and that allows that Redguard,
that waterproof membrane, to hold on to something to have even more of a membrane.
A lot of the newer systems, Schlute or Tile Pro, they all utilize something similar to this,
where there is further reinforcement over all of the seams and the gaps.
Part of the reason why I think this method still works just fine, I think a lot of those
newer methods kind of took some inspiration from this as well, so very important.
I think part of the reason that this method has become outdated is because it does fail,
and that is because people aren't using this fleece product.
Again, when you're going over those things with your contractor,
it is a perfectly okay question to ask is, how are you waterproofing my shower?
They should have a great explanation. There is tons of content all over YouTube and
all over the internet talking about waterproofing. It is a complete myth that Tile and Thinset and
Grout alone are waterproof, because it is not. If they aren't planning on doing anything,
I would highly recommend getting some type of waterproofing in, whether you install that
yourself or ensure that they do. We're going through all the way around the curb.
Any opportunity for water to get on the back side, the front side, we wanted to mitigate any
water seepage as much as possible. Of course, any of the wood around the shower that was touching
the concrete, because obviously concrete does have moisture, we used treated wood. It is actually
designed to be in contact with the ground, with concrete. Then all of the seams, like I mentioned,
got that fleece product. Everywhere else is getting two coats rolled on. Like I said,
it's a paintable membrane, so we get to paint that on. We got two or three coats on all the surfaces,
three coats plus the fleece in all of the corners. One of the things that some people ask often is,
why didn't we waterproof all the way out? In that case, if you have water going that far and
that plentiful outside the tile where the shower is, you have bigger issues that need to be resolved
anyways about shower doors, where your shower heads are facing, the height of those shower doors,
those things. We just do a nice waterproofing layer right up where the tile is going to go,
not over that, because we don't want the paint to cover or be seen at all on the outside of the tile.
So when installing a mosaic flooring like we are on the shower floor, there's a couple different
ways that we can go about it. This way, we just laid it out because it was relatively simple.
The shower was square. Of course, we built those walls, so we had a really good idea of the
dimensions of those. Another method that we use is called templating. We'll actually use cardboard
or some other product to build a template around, and then we can trace that mosaic. That's a little
bit more complicated. We can trace that out and make sure that it's going to fit absolutely
perfectly. Just going through now, getting all of the flooring installed. I like to install
flooring first because I want the flooring of the shower to be installed underneath the wall tile,
so that any water that does come isn't going inside of a gap, but actually going on the floor
into the drain, if that makes sense. Now, I'm doing the exact same tile on the back of the
niche. Of course, we like to try to coordinate as much as possible, keep things cohesive as far as
the design stuff. Of course, we had all that tile already done and cut, so we just figured we might
as well do the niche as well. We also, at this point, decided that would be most efficient for
us to put all the grout in. We grouted the back of the niche. Now, we're going through and grouting
the rest of the shower floor. Again, just finishing that off even more, allowing for more water
manipulation, if you will, to make sure everything is going back towards the drain as much as
possible. Of course, like I mentioned earlier, grout, tile, and thinset are not waterproof,
while water will seep behind there, but the majority of the water obviously will go down the
drain, of course. That is the main goal. One of the main tools that we like to use when installing
tile is a laser. Yes, we could go through and we could mark, you know, sharpie marks or pencil
lines on the wall, but as soon as you put mud on those, cover those up. Any opportunity we have to
keep things cohesive, keep things level, nice, straight, we will do that, of course. Having that
laser line going up the center, as you can see, it's going right through the faucet of the shower,
right through the center of the niche. It's going through the center of the drain down in the
shower. In some cases, if there was a showerhead involved on that back wall, we could utilize that
as well, but having that laser really gives us a reference point for the rest of the shower.
So once all the wall tile is up, I go back and I'm actually putting the first row of tile on last,
and that is just that transition between the floor tile and the wall tile, making that as custom as
possible. It's not always perfect. The shower pan and the concrete underneath isn't always perfectly
level, so that is kind of a custom cut row. Of course, that looks really nice. It looks complete.
We had a full, almost an entirely full tile on the bottom, as well as along the top, a little bit of
pre-planning. So now, here I am putting tile around the niche. You can see that schluder right
there, that black trim is what that is called. That is exactly on a full tile or a half tile,
like I mentioned way earlier. It's very important to predict layout, and the sooner you can have
the plans and stuff set up for this niche, the better that that overall product is going to be.
It's going to look like it was designed to go in that space. Any of the flat surfaces, so the
bottom of the niche, as well as the shower curb, which I'll probably be installing here next, all of
those surfaces need to be sloped. Anywhere that water has an opportunity to sit needs to be sloped
back towards the center of the drain. If there's an opportunity for water to stand or sit still,
that is even more opportunity for water to seep through behind the waterproofing,
potentially cause damage. If it wasn't waterproofed properly, it could cause tile to be
chipped off the wall, break down thinset, ground, all of those types of things. So
any flat surface, shower pan, top of the niche, or I'm sorry, bottom of the niche, top of the
shower curb, all need to be sloped in. There's lots of different methods to do that. Best way is when
you're doing the framing way beforehand, if you have it sloped prior. So anything you do over the
top just can be installed to the top of the framing and it'll slope back in. So here I was
putting on the curb topper. Again, it is sloped slightly towards the middle.
General rule of thumb is a quarter inch per foot. Getting all of that stuff installed, pulling up
the masking. And after everything was installed, we were going through and grouting the entire
shower. So one of the things that I really like to try to keep cohesive is the color of grout.
So if you're going to have multiple different colors or textures of tile, I would ensure that
all of those tiles can use the same grout. So in this case, we had a matte black tile, a white
subway tile on the walls, and then we used a really dark charcoal gray, which looked really
good with both of those tiles. Obviously it is possible to mix match and have different colors
of grout. However, if they're drastically different, for example, if you had a really
dark charcoal gray on the walls and a white grout along the bottom, that is going to cause some
difficulty when installing. And also as far as long-term, if any of that grout, the color does
fade over time, which obviously does happen. These are just stone products. If that does happen, it
could seep into the white grout, cause graying, and now you have all sorts of different colors
and issues. So like I said, anything, any opportunity you have to keep things cohesive,
use the same color, make sure you're planning for those as much as possible. So with these nice big
walk-in showers, we actually have several options with this one. It was over seven foot wide. And so
I had given the idea to the homeowner that we just use a panel, a single panel, a screen,
very high end luxury. Some of the higher end hotels have this where it's just one big shower
screen. You walk around, it is the door and the opening is so far away from the water source
itself. The chances of splashing a bunch of water out is very minimal. So I, I think in this case,
it worked really well. Obviously, if that is, isn't something you want, or if the shower is
smaller or potentially either more shower heads, there is other options that you have by having a
hinge door, sliding glass door. Of course, those are things that you should be thinking about when,
you know, prior to having the homeowner or the contractor purchase all of the products.
After we are done grouting, we're going through and caulking all of the inside seams. Again,
like I said, our goal is to get as much of the water to go down the drain as possible. Not all
of it is going to, but any opportunity that we have to manipulate that water and get that to
go down, we will. So those inside corners, all of the surfaces of the niche are very vulnerable.
So we use a color match silicone caulk to go around all the inside corners, the base of the
shower, all of those things. And of course a clear silicone around the glass. So here is a little bit
shot of my painter. He's going through and rolling all the walls. He cuts everything in by hand.
Of course, the ceiling and the walls, another big important piece too, is I really like having a
different color between the ceiling and the walls. I think it just adds a little bit more luxury to
the home there. Obviously there are some cases where it's all the same color. I've been in a lot
of spec homes where the builder is just trying to get in and out as quickly as possible and they'll
just spray all the same color everywhere. To me, it's just not as luxurious for you though. It might
be exactly what you're looking for. So of course, make sure you discuss those things with your
contractor. So he cuts everything in by hand. Anywhere there's a flat surface, so like wall to
trim, he puts some masking just to add a little bit more of a barrier. Makes his life a little
bit easier. Ours as well. So we'll have to go back and fix a bunch of trim. In this case, the vanity
was actually 54 inches wide. We felt that with the space that we had, that was the best spacing. So
one of the opportunities that you have to be very custom in your bathroom is a vanity. Of course,
toilets are generally the same size. Obviously the shower, you want to maximize that space as
well. But one of the things that is overlooked oftentimes in the bathroom is the countertop
space or the vanity. In this case, we were very limited on the width of the bathroom and so we
wanted to maximize the countertop space. They did want a single sink again to have as much counter
space as possible. But in order to use all of the space and leaving room for the toilet, having a
shower, the vanity that fit there was 54 inches. Standard vanities that you could pick up from Home
Depot or even suppliers are usually 60 inches, 48, 30, 24, 20, and then all the way down to 18 and
12, really small ones. So because this was slightly different sized, there wasn't a mirror that was
readily available. So in this case, we wanted to build our own custom mirror so that it would look
really nice over the top of the vanity. That was another thing that was important to the homeowner.
Like I said, the countertop space and also a large mirror. So we, of course, like we said,
wanted to maximize that. Yes, in some cases we easily could have bought a 48 inch mirror, which
was six inches, three inches on each side, not that big a deal. But because the homeowner made
sure to inform me the importance of mirror size in our initial meeting, that was something that
was in my brain the entire time. So I guess the moral of that is if there is something that is
important to you that needs to be addressed as soon as possible. If it's something down the road
where maybe the, you know, the contractor or myself even has purchased everything already and you come
in, we're installing a mirror. Oh, I wanted a really big mirror. At that point it's going to be
a little bit more complicated to make that work. Obviously everything, you know, anything can be
changed at any time. But like I said, if something's important to you, make sure that is addressed.
Sometimes I've even had homeowners write lists of things that it doesn't go over everything. It's
just, these are the important things. Now it's your job to take what we want and make it, you know,
beautiful and add all the rest of the things that you know how to do. The hardware that we used in
this project was a soft close and open hardware. It's a much higher end pocket door. They actually
have steel stud frame for all of the hardware. And the reason we went with the soft close and
open is because the homeowner was really concerned about lighting and they wanted to make sure that
from the master bedroom into the living space, there was light coming from that big EGS window.
So we did glass panel doors. They were frosted of course for privacy, but we wanted to make sure that
that light could transition all the way through. So with the glass in the doors, we wanted to make
sure that they closed softly and open softly as well. I like to use a round pocket door hardware
in this case. Their most commonly used one is a square one where you actually cut out a big chunk
of the door and install it that way. Personally, I don't think that looks as nice, especially if you
have doorknobs or handles in the rest of the house. I think it just adds a whole new element
that is completely unnecessary. So when I'm able to use these round doorknob like hardware, I like
that a lot. Even on this one where we had two pocket doors sliding into each other, this product
still works really well because we were able to put the receiver on the other door so the doors
were able to lock together. So they could actually have that privacy in their bedroom of course and
lock that out. So here we are assembling the cabinet. So in this case, this was a custom width like I
mentioned earlier. So it's actually a three-piece cabinet. A lot of the time that works really
well, especially if you have much larger master bathrooms. You can really get fully customizable
on the widths. Not to say that getting a pre-made vanity isn't bad either. Sometimes those ones are
beautiful and they work really well, especially if you have some in the rest of your house. It just really
depends on the overall goal that you're going for. Like I mentioned before, countertop space is very
important to them. So we did everything we could to maximize that. Storage was also really important.
They wanted to utilize drawers more than they did cupboards. Drawers are great for storing
brushes and those types of things. But we did have a cabinet in the middle so that we could have all
that sink hardware going through. So after most of the finishes are done, we're going through putting
in the plumbing fixtures. Again, this was an aspect of the project that was important to the
homeowner. So they actually provided me pictures of what they like specifically. So I was able to
take those pictures, find the exact product. Same with the light fixture that I'm installing now.
Those two things were very important to them. So it made my life super easy. I was actually able to
do a reverse Google image search, found the exact supplier that had those products, ordered those.
Some cases the homeowner doesn't really care and they just want everything to match. And so that
also is really nice for me because then I can get a faucet, shower fixtures, light fixtures,
all of those that just match really well. Sometimes they're even sold in package units.
So of course those things are going to be cohesive. Countertop, they actually didn't know
what they wanted. So this was a great opportunity for them to go meet with my supplier. So they were
able to walk through the showroom with her, pick out exactly what they wanted. I sent them with
the hardware. So they were actually able to hold the hardware on the different samples within that
space and use and pick out the best product for them. And of course, I think it turned out
beautiful. So pulled all the masking up, doing the final cleaning and sweeping to get everything done.
We do like to have everything clean at the end of the project, of course, so that you get a full
on fresh start, exactly how you're going to want it to be done once everything is finished.
All right, guys. So after everything gets cleaned up, of course, there's the final reveal, but I
want to show you real quickly what we started with, what we came down. As you can see, there
was tons of just concrete everywhere. The homeowner did utilize the space for a little bit of an
office and some storage, but there was no flooring, no walls, no any of that. We even
had to update some of the HVAC to make sure we had proper airflow down there as well.
And now into this beautiful space here, we have a huge space for living there. Of course,
they hung a TV right where all the outlets and stuff go. They moved the bed downstairs
right away. Throughout the project, they were actually talking about going, staying in the
master bedroom upstairs and then having the downstairs be like the guest room area. As soon
as we were done, they actually decided that they were going to live down there, which of course
makes me really happy that we kind of won the battle of which space that they are going to
choose. I would love to know if this was informative to you, a little bit of a different aspect,
as far as what we do and why we do it, kind of talking about the homeowner stuff. I hope that
is helpful when you are deciding what the steps you're going to take in your next project. If you
guys really like this type of stuff, please let us know, drop us a like. We have a ton of content
coming your way as far as other remodels, different things similar to this. Also a couple of
things that are a little bit different that we have in the works. So really appreciate if you
guys subscribe, hit that notification bell, of course, too. Thanks so much for watching.
We'll talk to you guys later.