Thank you to Total Boat for supporting this video.
My friend Duffy started a history museum and every now and then I get the opportunity to
contribute with some kind of woodworking task.
In this case, Duffy acquired an original 24 pound Howitzer cannon made in 1847 and of
the original 69 produced in the mid-1800s, 36 of them are known to have survived with
only 3 of them, this is one of them, being in personal collections.
The cannon itself, or the tube, it is original, the carriage it is sitting on is not.
The previous owner said that he had it for 30 years and doesn't remember all of the history
before him.
Now there's a few original items like the axle and the double link chain, but all of
the woodworking and some of the metal are reproductions.
My task was to relocate the elevating gear, or in this case the screw.
Rotating this screw changes the elevation of the rear of the cannon and therefore changes
the firing angle.
The carriage was originally made for a Napoleon 12 pounder and the only difference between
this carriage made for the Napoleon versus one that was made for the Howitzer is about
1 and 3 quarters of an inch in length of the cheek plates and about 2 and 3 eighths difference
in the location of the elevating screw.
Other than that, they're basically the same thing.
With the screw removed, you can see the size of the holes that need to be plugged.
Before making any adjustments, I wanted to make sure that the original locations were
well documented.
Some masking tape was applied to both sides of the holes and then their locations were
transferred to the tape with a pencil.
The screw is threaded into a bronze nut at a very specific angle and after measuring
it a few different ways, I determined that 12.5 degrees was the angle of choice.
This angle will be used later to cut a guide block for starting the new holes.
The main construction wood for these carriages is white oak, so that's what I'm going to
use to plug the holes and first up is to cut some turning blanks.
Then the dowels can be turned, starting with the smaller dowels.
I used an open-ended wrench as a guide to get the dowel to a uniform size and then after
that I reduced the diameter little by little to sneak up on a very, very snug fit, checking
it between each reduction.
After the small dowels, the larger dowel is turned and for this one, I turned it around
and then reduced only one end for testing.
With a test fit confirmed on the smaller end, the rest of the dowel was turned to that diameter.
A little prep work was needed for the large hole.
The screw was lubricated with grease, so some residual grease was on the inside of the hole.
I used mineral spirits with a wire brush to give the inside a quick scrub to remove any
loose debris.
Fix-O-Flex, flexible epoxy adhesive by TotalBoat, is what I'm using to secure the dowels.
Now as the tube says, TotalBoat Fix-O-Flex provides for stronger bonds than adhesive
sealants and with greater flexibility than regular epoxy.
It's excellent for applications where bonds must withstand flexing, twisting, contraction
and expansion, shock or vibration and this carriage will experience literally every one
of those forces.
The tube also says it's ideal for damp or oily woods, which gives me a little better
peace of mind regarding the large screw hole.
Before I show myself struggling with the super cheap caulking gun, the only one that I had
at the time of doing this project, let's jump into the future and show a test with a much
more appropriate caulking gun.
The blue gun that I'm using is a newborn Duracor 18 to 1 thrust ratio and the red gun is a
generic medium duty caulking gun.
The test is to squeeze out as much as possible in 30 seconds with the same tube and the same
nozzle opening and as you can see, the red generic medium duty gun does not provide much
pushing force.
I have to really struggle with this just to get a tiny amount to come out.
The blue gun on the other hand, it has a much higher thrust ratio and pushes more material
out with a fraction of the effort.
This is a perfect example of using the right tool for the task.
Back to the project and as I said, at this time all I had was the medium duty gun so
the struggle was definitely real with this one.
After getting a bunch of thick sew into the hole, I applied a liberal amount to the side
of the dowel and then spread it around with a piece of cardboard and then drove it home
with a mallet.
The process is the same for the other two dowels and one thing to note here is the grain
direction on the dowels.
I am gluing them in perpendicular to the grain on the carriage.
Typically you would not want to do this because they will expand and contract in a different
direction than the rest of the carriage.
However, the center section of this carriage is just two large white oak beams that have
already been pinned together with bolts in various different directions anyway.
I don't see an issue with these wooden pins or dowels in this exact situation.
I let the thick sew epoxy cure overnight and then flush trimmed the dowels on top and bottom.
The large hole still needs a square plug to cover the bronze bushing mortise but before
that can be installed, I needed the top of the dowel to be parallel with the top surface
of the carriage.
To do that, I used a small trim router and a low angle spiral bit.
All of this was done freehand to just nibble away the center dowel only.
Next I cut a rectangular block of oak slightly larger than the original mortise and traced
its location with a marking knife.
Then the rounded mortise is chiseled into a more patch friendly rectangle down to the
same depth as the top of the dowel.
You can see here that there is still a little bit of tapered mortise around the front side
of the dowel.
The options are to trim the dowel and mortise deeper to eliminate it or just fill it with
the epoxy.
Because it wasn't much space, I chose to fill it with the epoxy before seating the patch.
I also let this sit overnight for the epoxy to set up before trimming it flush.
Remember that 12.5 degree measurement I took earlier?
I used a few blocks on my drill press table to establish that angle into a guide block.
With the elevation blocks on the right clamped in place, just one clamp is needed to keep
the left edge of the guide block stuck into the t-track with downward pressure.
This locked the angle while the hole was slowly and carefully drilled.
I know what a lot of you are going to say, just tilt the table.
Well this setup was pretty easy and afterwards I don't have to worry about calibrating the
table back to 90 degrees again.
Back to the carriage for another quick fix.
It dawned on me that the front dowel is the only one that will be exposed in the new position.
I was worried about the end grain of the dowel telegraphing through the paint so I drilled
a shallow hole with a forstner bit for another plug.
This time the grain will be parallel with the rest of the wood and hopefully not telegraph
through the paint.
I don't have a 1 inch plug cutter so I used the CNC machine to cut the plug.
Because I wasn't worried about the glue dripping through and I needed to get back to work on
this area immediately, I used a fast setting PVA glue.
A hand plane was used to remove the bulk of the patch waste and then a few quick passes
with a sander to make sure everything was flush.
I couldn't complete the work with just the hand plane because there were too many bumps
and irregularities in the surrounding wood.
This cosmetic patch up front was right in the middle of the two main beams and the crack
you see isn't a crack, it's a seam from the two beams shrinking slightly over time.
So I used a thin saw to cut a kerf into the new patch to make the seam look continuous.
Once covered in paint, there shouldn't be any visual indications of a patch being here.
Here's where the 12.5 degree guide block comes into play.
After carefully positioning it for the new holes, it was clamped securely to the carriage.
Then we used the same digital angle gauge with some shims to get the top face to 12.5
degrees from parallel with the floor.
With the carriage at the correct angle, we can focus on keeping the drill vertical.
And to do that, I had some help from Duffy.
When looking down at a drill, I find it easy to keep the drill tracking vertical left to
right, but as I'm standing over it, I can't really tell front to back.
I clamped a level vertical to one of the wheels for Duffy to use as a visual reference.
He could tell me to lean forward or to lean back to keep the drill tracking vertically
while I was able to stay vertical left and right.
The 2 1⁸ inch hole was drilled deep enough into the surface just enough to remove the
guide block.
Then we used an overdrive bit to quickly hog out the center section.
Removing the center makes the Forstner bit much easier to drill with.
Back and forth between the overdrive bit and the Forstner bit until we were all the way
through.
With the main hole drilled, the mortise for the bronze nut needed to be cut.
Nothing fancy here, just some guide blocks for the sides and lots of chisel chopping.
One thing to note is the front of the mortise is rounded, so that part did take a bunch
of back and forth testing to get it to fit right.
Once the screw was fit, we knew the location of the two bolt holes, and they were drilled
as deep as possible with overdrive bits and then drilled all the way through with a long
reach electrician's auger spade bit that I happen to have.
I only have one of these bits and it just happened to be the exact diameter I needed.
At this point, all of the work in my shop is done and so it's just time for Duffy to
take it home for the last minor repairs and a fresh paint job.
I did send Duffy home with some penetrating epoxy to fill in any of the tiny cracks and
cheeks that was in the wood.
And if you need epoxy to get deep into super tiny cracks, this is definitely the stuff
to get.
It has an incredibly low viscosity.
Also note that we will be firing this cannon in a later video, so be sure to subscribe
so you don't miss that.
And this is the size of the projectile, it's quite large.
The hat is here for a size reference.
Here it is on display in Duffy's museum with the original 24 pound howitzer cannon in place.
The tube is stamped from Springfield, Massachusetts and made in 1847.
And here you can see the correct location of the elevating screw.
Before it was contacting the tube 2 3 8 of an inch forward, not contacting the back ring
like it should have been.
Here's another look at the diameter of the tube and the size of the projectile.
Duffy also has one original spike.
And a spike is used with a pair of rings at the end of the carriage to get a mechanical
advantage to more easily move and position the carriage.
And finally, the rare howitzer cannon is displayed with an even more rare 24 pound howitzer ammunition
chest, which is the only known howitzer ammunition chest surviving to this day.
If you would like more information or would like to see Duffy's museum in person, check
out his website StarkvilleCivilWarArsenal.com where you can find contact info and get in
touch with Duffy to schedule a visit.
Duffy does not charge an entry fee to get into his museum, although he does have a donation
bucket by the door to kind of help keep the lights on as the saying goes.
If you're interested in more of this history type content, I do have the sweet gum mortar
video 1 and 2 where we fired a sweet gum mortar.
So much fun in both daytime and nighttime.
We have the rolling forge video, an ammunition restoration chest video, and an ambulance
photo shoot that I did with Mr. Duffy.
So lots of stuff on this particular topic.
Go to my website jayscustomcreations.com slash newsletter and sign up for my email newsletter
so you don't miss anything that I publish.
Thank you to TotalBoat for supporting this video.
You guys take care.
Have a great day and I'll talk to you in the next video.