Build This House/Part 5

VideoJoeShows
86 followers
259 Video Views·Jun 15, 2026
Build this house Part 5 is what this DIY howto video is about. VideoJoe is out at a jobsite & he wants to show you how the building foundation is coming along as well as the drainage pipe that is being installed around some of the new concrete walls. Watch & learn as VideoJoeShows you what VideoJoeKnows...build this house Part 5. Nice!
AI Generated·May contain errors
I noticed seeing this the other day and I thought okay I better grab my video camera and come back
come back out here that's a little that's a little mini excavator and here's a bigger
excavator over here and a little bobcat oh look at that little thing I've never seen one that
small before see that thing that that compacts the dirt those different things on that drum
and look at this look at this they've they've made this all flat here that's what they
that's what they were doing and that's why that's why they couldn't do anything
until they uh connected up and installed all that drainage pipe and that's why they put this black
paper down well actually that that is a felt material there and it's and it's designed to
breathe this this stuff is designed to breathe and look it's got it's got a backing piece on it and
then it had remember it had this other stuff that they put on it's kind of like a foam board and
they had that put that on with black mastic can you believe that a lot of work prior to them
backfilling this and now see I in the old days I've seen I've seen dirt uh
backfilled right up to a concrete wall before but they didn't want to take any chances they didn't
want anything to weep through there if you get any little hairline cracks in the uh that those
tall concrete walls you didn't want anything to seep down in there and get down in on the floor
down here that's the last thing you want is to have any moisture coming through a wall
kind of like this usually they would do something like that in a basement this isn't
necessarily a basement this would be called a walk out because this the main floor is going to be up
here okay and then you walk down to the second floor I kind of I kind of like that I call that
the second floor but the second floor usually for most people is above the first floor you
know what I mean that's just the minus first floor right down there and and then this is just
going to be a one story okay son of a gun I wasn't quite sure how how they were going to do that but
uh that's that's why they got all these big machines in here and since the since they had
had the machines they went ahead and they kind of filled in dirt in here they brought some more dirt
in down here at the bottom and they kind of made this nice and flat they kind of messed up their
black barrier coming around here remember it was coming through here and I'm not and and I'm not
sure why why they went all the way back here um oh I see I see what they did I'm not sure why they did
that but they did um you see remember they had the white pipe connected there and then they stopped
well then they connected it continued it I was wondering where that was going to end up
and that's what this is right here they they've put uh gravel down in there and then they put that
black breathable uh that's kind of like a weed block material it's breathable okay so when water
hits that it soaks down and here's the pipe underneath it can you believe that there it is
okay and I'm not sure if they did that on the other end of the property or not
uh they either did or or they came down with that one and then dug a trench over this way that's why
they have the excavators there and I kind of thought the property line stopped there but no
the property line does not stop there it stops way way back here probably where this uh I didn't
know that was there where where uh that ditch is see see right here where they got it contoured
down I've never even seen that before because I've not walked down here this far before okay
so this this is still on their property that's a good way for them to drain everything in there
now mind you I don't think there's ever going to be any water uh up against the back of that wall
but you never know how the water tables work and when it rains and stuff I'm just going to look at
this over here see where this uh white pipe was and uh you remember it stopped right here from
before okay and and they've and it's right here what well they um before they backfilled all this
looks like they put gravel before they graveled I think they put this black this black uh
uh rolled uh felt whatever they want to call it I think they wrapped it over the pipe before they
backfilled it not quite sure if they did that or not but um then they dug they dug all the way oh
I see it I see it over here okay see they did the same thing it's right there they didn't put any
black paper on this did they I call it paper but you know what I mean and maybe they will later
and uh then the water's going to dump out that way uh unless they continue that down I don't I
think they're just gonna they're just gonna stop it right there and if any water hits that it's
gonna go there and it's gonna weep up over hopefully it doesn't mess up their uh their
retaining wall but but like I say that that is a that is a deterrent that is like your your plan b
um if you ever do get moisture behind that wall along the side of the wall on that side of the
on the other side of the wall look at that they left their level here
today um if they get any moisture from here coming down here um it's it's gonna hit that
pipe you remember the pipe's got perforation did holes on the bottom of it and it's just gonna
on down that way now when they when they get ready to backfill this a hundred percent
normally what what they'll do is it is you have to have your backfill material lower than your
mud seal at least in when I used to do it years ago the code was uh your finished ground had to
be at least six inches below the bottom edge of any mud seal which means see how it jumps down
you got to have six inches below that boom six inches below that at that point six inches below
where it is right there okay in fact in fact they almost have this too high don't they they may have
to they may have to chop that back because it's supposed to be just a slightly lower than that
but then what there's what normally they do is they'll contour uh your landscaped
uh dirt and everything away from your from your house it's always supposed to be sloping you're
never supposed to have any dirt sloping towards your house on either side or anywhere for that
matter okay even though they have that pipe there I think they'll still later on slope this
slope it and and maybe have a swale in the middle of this going down that way or something like that
or maybe they're not even concerned about about sloping it away from the property I think they
still would be don't you I think the inspector will say hey it still has to slope away from that
and over here they still have to build this out and that's why and that's why they've been
mashing this down with that with that uh with that little machine right there see see all those
little see all these okay that they just roll on this and so when they backfilled this as they
backfilled way down then they rolled it and then they no
