this part of the shop series is
supported by pure bond plywood available
exclusively at the Home Depot part one
of the new shop series was an
introduction to the space part two
covered moving the tools to the new
space part three covered why and how I
will lay out the tools and in part four
I'm going to cover framing the walls
insulation wall sheathing and a little
bit of cleanup and organizing this was
an extremely busy week as I had a lot of
running around to do my family visiting
from out of state and coordinating with
a contractor to get the bulk of the
labor completed for me so first up was
to get the materials and for the walls I
decided to go with two by six framing on
24 inch centers in between the framing
is going to be our 19 fiberglass
insulation so many people recommended
spray foam insulation for the shop and
while I would have loved going that
route it was simply out of budget to do
the entire shop in spray foam I figured
that since the shop already has a
moisture barrier wrap on the outside and
the walls of the shop don't receive a
lot of direct sunlight after say 11 a.m.
traditional fiberglass insulation is a
cost effective solution that will still
get the job done for the walls the
largest offender of heat buildup from
the Sun is the roof and for that I will
get spray foam installed at a later date
the weekend before contractor work was
scheduled I started by removing all of
the pegboard and corrugated tin from the
walls this part was a bit frustrating
not because of the peg board or the tin
but because what was underneath one
section right underneath the right
window on this wall I found a termite
infestation which actually kind of makes
sense
termites termites love moist
environments and this window was leaking
for who knows how long there was dirt
piled up behind a couple sections of tin
and the termites had already started
eating away at the lower horizontal 2x4
now luckily the damage wasn't structural
it was not deep at all but it did add
another thing to the list to deal with
now at this point we were still less
than a month into living here so I
contacted my realtor to see what can be
done and in the state of Mississippi it
is the sellers responsibility to order a
wood infestation inspection which in
this case it was completed
not exactly sure where the
miscommunication happened but only the
house was inspected not the shop the
final result was a complete termite
treatment to both the shop and the house
at no cost to us so problem solved the
whole process was extremely frustrating
on one end but on the bright side there
was no structural damage and now both
structures on the property are treated
for the future contractor work started
on a Monday morning that our nanny had
previously requested off so I was kind
of on daddy duty and didn't get any
footage of them starting that day but we
did take a field trip 77 miles north to
the nearest Home Depot to pick up some
pure bond plywood for the walls 40
sheets of pure bond to be exact
this is a 3/4 inch birch plywood which
matches my miter saw station and gives
me a lot more options to hang stuff
pretty much anywhere in the shop if
you're not familiar with pure bond it's
a female to hide free plywood made here
in the United States and available
exclusively at the Home Depot after
driving home and unloading piece by
piece into the shop I shut everything
down and spent the rest of the night
with my mom and nephew who drove over
from Dallas to spend the week with us
this is the progress the contractors
made on the first day they were able to
stud and insulate one of the 40-foot
walls
not too shabby considering it was over
100 degrees with high humidity inside
the shop on day two the contractor
started off by installing the plywood
panels on the first wall these guys were
great I've known Ben for quite a while
he's the guy in the black shirt here and
we joke around about how we both cut
wood for a living but his type of work
stops at 1/8 of an inch I knew they
would do a good job so my only request
was to use screws to install apply wood
instead of nails or staples and maintain
an even spacing for the screws so it
doesn't look distracting on camera and
slowed them down by a little bit but
they did a great job day two of the
contractors was also day two of family
being in town so I kept running in and
out of the house to move the cameras and
to help the little bit that I could
after the full sheets were up the guys
came back and filled the small sections
on top and this is where I noticed my
a bit of an over estimate of the plywood
needed the ceiling is close to 10 feet
off the ground so I calculated 1.25
pieces of plywood which is 10 feet tall
for every 4 feet of wall and I didn't
take into consideration the 2 by
material high on the wall that the roof
trusses were resting on so in the end
this resulted in 6 extra pieces of
plywood or 6 extra full sheets of
plywood that I added to the 4 sheets
that I already had on hand in my plywood
cart so it's a little bit of a happy
accident nothing wrong with having a few
extra quality sheets of plywood to use
on future builds the work continued to
the back wall that day where we had a
few different obstacles to work around
first the tin on the ceiling needed to
be removed and pulled back along the
entire back wall then the stair treads
needed to be removed then the stringer
closest to the wall needed to be removed
and finally the forced air intake and
exhaust needed to be removed completely
these were temporarily patched on the
outside with a piece of ceiling ttan
just enough to get the walls completed
on the inside and a week or so later I
came back and tucked in a moisture
barrier layer from the outside and
patched the holes with a piece of tin
that matched the same profile as the
exterior of the building insulating the
back wall marked the end of day 2 for
the contractor work and on paper or this
video it may not really sound like a lot
of work getting done for two days of
work but when you consider the extremely
hot and humid weather we were having
magnified by basically being inside of a
hot tin can all day and dealing with
sweat sawdust and fiberglass insulation
I was quite impressed with her progress
and really glad that I wasn't the one
doing it
later that evening my ten year old
nephew Nate came out to help me shift
everything to the completed side so the
contractors could access the rest of the
walls moving everything that night was
it was a bit exhausting I was really
over moving stuff at this point in the
past two months I moved every bit of our
household belongings to redo the floor
in our old house unloaded my entire
materials shed into my shop to sell the
shed moved all of our household
belongings into our new house moved my
entire shop in
this shop and now I'm moving everything
from one side to another just so we can
work on another wall at this point I
felt like I was basically in a hamster
wheel just running and running and not
really getting anywhere I know in the
end it's gonna be great but it would
have been so much easier to renovate
this shop before moving in unfortunately
I just did not have the time to do so so
all of the walls are put up now I've got
insulation on all the walls where my
electrical panel is that's still just
temporarily secured so I can get in
there and I still have to trim out the
windows I still have to put covers on
all of the outlets and switches and this
top seam up here where the top of the
eight-foot sheets are I think I'm going
to do like Johnny Brooke and put a
continuous French cleat all the way
around the wall to cover all that up
that was a really good idea and I think
I'm going to utilize that here and I
still have to box in around the fan and
speaking of fan I do have it running so
I don't know how bad the audio is but
that is an exhaust fan and it's pulling
air out I've got just this window open
and it's got a nice cross-breeze going
still it's still early in the morning so
it hasn't heated up in here too much but
before I can proceed with cleaning
everything up I have to move my office
back over here and at least get started
so I can edit this video lots of changes
coming still and I've got a whole lot of
work to do the rest of that day was
spent getting the office section back up
and running and catching up on some
computer work and emails I was also able
to get a few more things in place on
that wall including the refrigerator and
so far the addition of the fridge has
been absolutely fantastic the next day
was Saturday and I was able to make a
little bit of progress trying to
organize here and there get the miter
saw station assembled and positioned the
tools in their approximate location that
evening my wife asked if I wanted help
in the shop which was completely
unexpected to be honest so of course I
agreed and we went to work first we
cleaned up the materials corner then the
area in front of the roll-up
and then we assembled a rolling scaffold
I picked up to help with the ceiling and
lights and and by the way after having
this in the shop for two weeks now I can
say that this scaffold is by far one of
the best 160 dollars I have ever spent
we were able to put all of the chemicals
and finishes into the metal sticker
cabinet and note here that all of the
harsh and more dangerous chemicals they
go on the bottom shelf instead of on the
top shelf like I previously had them in
my last shop someone called me out for
that in a previous video if they happen
to spill when pulled down from a high
shelf it can be much more dangerous to
your to your face in your eyes and of
course you versus if they spill when
pulled out from my lower shelf last up
was the lumber racks in the materials
corner and finally the heavy lumber can
be loaded and that's it for this video I
really wish I had more of a visual
conclusion visually compelling
conclusion for this video but that's
literally it at this point I was
physically exhausted and really just
looking forward to the next bit of
progress thanks again to pure bond for
supporting this part of the new shop for
more information on peer bond plywood
click the link in the description or
visit the pro desk at your nearest Home
Depot you guys take care have a great
day
and I'll talk to you in the next video