thank you to totalboat for supporting
this project this is a pecan slab i got
from a friend of mine ted alexander in
oklahoma in 2017 and in this video i'm
going to show you how i turned it into a
beautiful table with a somewhat hidden
drawer the first step was to examine the
slab and determine a game plan and apart
from the obvious voids and cracks that
you can easily see it was full
absolutely full of small cracks and bug
holes here and there house wrap is
commonly used in epoxy projects but i
went with a regular clear packing tape
instead it's just much cheaper actually
a lot cheaper and i already had a lot of
it on hand i put a layer of tape over
the major areas first and then a layer
of tape over the entire top side i
figured it would be easier to pour from
the bottom side first as the larger bark
inclusion in the center would be easier
to fill that way i'm only using the
epoxy to fill in the bark inclusion and
the cracks and i won't be
i guess suspending the table and epoxy
around the perimeter kind of like a
river table so rather than a melamine
form i decided to use some wax paper to
to kind of gift wrap the entire slab
this will allow me to flood the slab
with epoxy and hopefully stop any extra
from spilling out the epoxy i'm using is
total boat high performance with medium
hardener and i'm also tinting it black
with some epoxy dye that a friend of
mine left in the shop a couple of years
ago
the bottles of high performance say that
you need to mix it for at least two
minutes so i recommend picking up a
cheap kitchen timer to dedicate to this
task we all use our smartphones for
everything and i really don't like the
idea of getting sticky epoxy fingers
touching my cell phone here's a mistake
i started the first pour without using
caulking as an epoxy dam to focus the
location of the poor
that was an instant eurodummy moment as
i started to pour
luckily it's the first pour which means
all the voids can accept the most amount
of epoxy at this time after letting the
first pour set up for a while i added
the caulking to create a dam around all
of the major flood areas and here's a
quick tip for you store a few large wire
nuts near your caulking tubes and use
them as caps to prevent the opened tube
from drying out all right mix number two
now i'm not a big volume epoxy user i
mainly just use it as adhesive for
joinery so i had no idea how much i was
going to need or how much i should have
mixed with each batch mixing smaller
batches like this also guarantees that
i'm not going to pour much thicker than
the recommended layer height for this
product here's another mistake the
caulking dam keeps the epoxy
concentrated unless you're a dummy like
me and just pour way too much at a time
so at this point i had not only a dam
but also a spillway more of the same
just just flood the defects now this
second pour was better and that i didn't
have to babysit certain areas just fill
the epoxy and watch the bubbles come up
as the epoxy floats into the cracks
this area had so many small cracks so i
just just figured
flooding the entire area was a good
option here's another pour on i think
another day i was working on this right
before christmas so mixing and pouring a
little bit while i walked away and did
something else was actually pretty
convenient for my holiday schedule after
a few more days i flipped the table over
to pull from the other side
now i could remove all the packing tape
i had on the bottom and it actually
worked much better than i had
anticipated at this point the bottom
side should be pretty sealed so i didn't
add any tape or wrap it for the
remainder of the pores i did add some
more caulking to the top and a few areas
on the end grain i had some pretty old
slow hardener that i needed to use up so
that's why this batch kind of starts out
yellow
the age kind of made it yellow and i'm
not sure how much of the age affected
the chemical composition of the epoxy
but i rolled with it once again here's
some more pouring of the epoxy i think i
think this was day 375 000 of this
project
uh i'm not exactly sure i lost count
with the epoxy work hopefully done i
finalized the base design and picked out
a single ash board for all of the pieces
step one on the base material is to mill
the lumber starting at the miter saw
station and after all of the cross
cutting on this board i noticed some
internal checking it was kind of minor
but i really didn't like it every bit of
this board went right into the scrap bin
so that was kind of a bummer but
onward on take two i picked out two
smaller boards that looked pretty clear
of defects i cross cut them to rough
length at the miter saw jointed one wide
face at the jointer plane the opposite
wide face at the planer then back to the
jointer to joint one narrow face making
sure to go in the downhill direction and
then completely stopped the milling
process this was the morning of
christmas eve and my main goal was to
get the milling process started so that
they could rest over the next few days
while i was out of the shop and focused
on family time a few days later and a
few pounds heavier from the holiday food
bombardment i started the flattening
process now some people have asked in
previous videos how i hold down the
slabs when flattening on the cnc and my
answer is that that i don't these slabs
are too heavy to lift up on their own so
the only concern is to just prevent
lateral movement i always start if
possible by pulling the slab against a
few bench dogs and then using my y to
stop blocks on the other side if the
slab is any cup or twist to it i'll
divide the high areas by using wedges
along the high diagonal this one laid
pretty flat so no edges were necessary
the bit i'm using is a bits and bits
sb25-2 it is a two and a half inch
diameter surfacing bit with two
replaceable astra coated carbide inserts
which i'll get to in just a second i'll
leave a link in the description down
below for a video on my second channel
where i tested this bit out to determine
the proper feeds and speeds i normally
use the manual jog feature to shave off
the high spots before i run an actual
program and in this case
i got a little carried away and i got
nearly the entire slab surfaced manually
unfortunately the cut quality was not
good at all i had a lot of burning areas
which means either the bit is traveling
too slow and rubbing building up heat
instead of cutting or the cutting edge
is dull now i had the machine jog
settings set to the appropriate feeds
and speeds of the bit so it wasn't that
the problem was the carbide inserts were
pretty dull as i rotate the inserts here
is a cost breakdown of using this bit
the initial cost of this bit is
wait for it
399 dollars and that comes with 10 extra
inserts that sounds crazy but it's
actually not that's 12 inserts with four
cutting edges per insert for a total of
48 fresh cutting edges two inserts are
needed at a time so divide the 48
cutting edges by two and this one bit
purchase is basically the equivalent of
24 new flattening bits so 399 dollars
divided by 24 equals 16. and 63 cents so
if you're using this over and over again
you can see how the replaceable carbide
inserts are actually a big long-term
cost savings after you go through the
included batch of inserts you can get
another 10 pack of replacement inserts
for 82 dollars and 50 cents do the same
math 10 inserts times 4 cutting edges
divided by 2 per set up equals 20 setups
that means each fresh setup costs a mere
13 4.13
that is a huge cost savings versus
buying traditional carbide tipped bits
one more pass with a .125 inch depth of
cut and a 1.65 inch step over and you
can see a much much better result
regarding how long the inserts last i
used the previous cutting edges for a
couple passes on each side of this osage
orange slab and i was also doing some
speeds and speeds testing so i was
cutting way too aggressively a lot of
that
and a couple passes on each side of this
cherry an epoxy river table that a
friend of mine brought over to flatten i
also used it to flatten the entire cnc
spoil board once
so everything that i just mentioned plus
one roughing pass on this pecan slab had
a router bit consumable cost of 16.63
i'm not sure how entirely necessary it
is but i decided to flip back and forth
to remove a little bit from either side
to work my way down to the final
thickness similar to a typical milling
process you want to take a little bit
from either side the goal here was to
release the stress in the wood little by
little and prevent any warping that may
occur this slab remained perfectly flat
through the rest of the build at this
point both the top and bottom have been
surfaced and some new defects are
starting to show up some areas where the
epoxy didn't flow into and a few large
worm or bug holes packed with dust both
of which i cleaned out the best i could
with some compressed air and an awl you
guessed it more epoxy i really didn't
want to make a mess this time so i used
a paper funnel to pour it into a harbor
freight storage bottle these little
bottles hold eight ounces of liquid and
they have a pretty small hole in the
nozzle which is great they come in a
three pack for like three dollars and 27
cents so relatively inexpensive
they're also super handy for stuff like
mineral spirits denatured alcohol and
lacquer thinner which i keep in my
finishing cabinet as it turns out these
are super handy for epoxy as well this
is great for forcing the epoxy in one
end of the defect and watching it fill
from the bottom up that that visually
ensures that there's no trapped air much
better than just flooding it from above
i let that dry overnight and on day i
don't know 482 000 i cleaned up the top
surface once more with a small .05 inch
depth pass with a 0.5 inch step over i
wanted to be as as conservative as
possible cleaning this up at this point
all of the major voids were filled with
epoxy or so i thought so i switched over
to medium ca glue to fill the super tiny
areas using a light raking across the
surface is great for highlighting all of
the tiny stuff that blends in is just so
hard to see finally i determined all of
the cnc work on the top surface was done
so it's back to the bottom side my
original plan for the legs was to use
through mortise and tenons and the shape
of a dog bone like i did on a recent
bench but at this time i decided against
that the top already had so much going
on visually so i thought adding a dog
bone would kind of take away from the
natural beauty of the wood i laid out
the location of the four legs and the
two sliding dovetails and you'll see a
lot of these slab tables with inlaid c
channel on the bottom to prevent warping
of the slab instead of c-channel i
decided to make sliding dovetail rails
so i could add a low profile drawer once
i had everything drawn onto the slab i
used a center point pin in the spindle
just hand tightened to locate all of the
necessary joinery and then transfer
those coordinates from mach 4 to v-carve
pro from there i could create all of the
cuts instead of dog bone tenons like i
said i went with a triple mortise
antenna joint this provides a ton of
glue surface area to create a strong
joint the mortises are just three slots
with a 0.5 inch spiral up cut bit
[Music]
for the tenons the vertical table is
used first a shoulder is established and
then a spiral profile cut is made for
each of the three tenons rinse and
repeat for all four legs
[Music]
okay
a test fit confirms the fit and you can
see the mortises are a little longer
than the tenons are wide now i did this
just because it's easier to do and it
also allows a little bit of room for the
epoxy to squeeze out next up is the
sliding dovetail work starting with the
bulk removal of the material with a 0.5
inch spiral bit you can see that they
won't be the same length my concern here
is that they are both the same distance
away from the opposite edge of the table
i don't i don't care how long they are
they just need to be the same amount
inset from the ends for the dovetail
shape the spiral bit is replaced with an
8 degree dovetail bit i haven't pushed
this dovetail bit before so i don't know
how much waste removal it can actually
handle so i got the final shaping of the
dovetail slots by a series of full depth
profile cuts to sneak up onto the final
width i also was able to control the
start and stop location of the cut this
way a profile path is better in this
case because it can force the start and
stop location to be outside of the
material that way you don't raise up and
break out the side of the dovetail
to make the male side of the joint i put
the same bit into the router table and
made a test cut on scrap stock the first
test let me know that the bit was just a
touch too low on the router table so a
slight adjustment and the test pit
matches the female side of the dovetail
perfectly with the proper height
established the actual material can be
cut with the fence set so that the
resulting piece is too wide the plan is
to make successive passes while moving
the fence back a tiny amount until the
perfect fit is achieved everything was
going according to plan until the fence
position slipped without me catching it
the resulting fit was too loose bummer
luckily the pieces were still oversized
in the height direction the height was
also the only dimension that wasn't
covered in the rough milling process so
one rip at the table saw to square up
the final face and another rip cut with
the new face against the saw fence to
remove the dovetail completely and
establish the final height of the rail
all right take two at the router table
to get the appropriate fit and luckily
this time i got it the end of the
dovetail slots have an interior radius
and not a sharp corner so i had to
remove some material so the corners
would fit no need to be exact with it as
it'll never be seen so i just made a
simple plunge cut into the fence opening
at the router table to kind of clip
those interior corners now the length of
these rails needs to be established and
the joint was pretty darn tight so i
didn't want to seat these all the way in
so with them resting in the slots kind
of on
a diagonal and pushed all the way
forward they will both be the same
distance from the opposite edge i used a
square pushed in the same distance from
the front edge to mark the length of
both rails and they can be cut to their
final length at the miter saw
i decided that the easiest way to make a
drawer runner was to add a strip of wood
to the bottom of the rails that the
drawer could slide on top of i already
had some surfaced walnut scrap on hand
so i used that and glued it right to the
rails with the plan of trimming it to
size later switching back to the legs i
cut two tapers on the bandsaw to give
the effect that the entire leg is angled
in one direction the legs will be
installed so that the legs are splaying
out slightly
the bandsaw and faces are cleaned up
pretty easily with a hand plane
and then all of the leg edges get a
generous 0.5 inch round over it's
important to chamfer or round over the
bottom edges of table and chair legs if
you don't the outside faces are much
more likely to snag and splinter off if
the piece is dragged across the floor
back to the drawer runners they are
first cut to the final length at the
miter saw and then they're cut to the
final width at the table saw when gluing
these pieces in place i made sure to
overhang the walnut only on one side
this way the ash is used as a reference
face against the fence to cut and
establish the final width this new
walnut face is now parallel to the ash
so it can be ran against the fence to
establish a slight bevel on the outside
face of the rail i thought something was
something was needed to minimize the
blocky look of the rails and this was
basically the simplest solution i also
thought that the walnut looked a little
too thick at this point so i reduced its
thickness before leaving the table saw
here you can get an idea for how the
drawer rails will work and you can also
see that the bevel cut does a lot to
break up the shape and make it feel
a little bit more like the rail belongs
on the table i'm using epoxy as an
adhesive because the joints are tight
and i don't want any pva glue expanding
the wood making the joints frustratingly
tight during assembly starting with the
legs a generous amount of epoxy is
applied to the mortises and the legs are
hammered home and then checked square
before moving on to the next one the
primary reason for these rails is to
keep the slab flat while still allowing
for expansion and contraction that means
the entire rail should not
be glued in place i only added epoxy to
the last couple inches of the slots
leaving the rest of the joint free to
slide as needed because i wanted the
rails to be inset the same distance on
both ends some of the dovetail slots
were left exposed i didn't want to leave
it like this because of you know
clothing potentially snagging on the
corners so i used some of the same ash
as the rails to make basically dovetail
plugs these were left epoxied in place
leaving an inch or so gap between the
plugs and the rails for expansion and
contraction the last bit of construction
for this build is the drawer and i
milled some of the scrap ash from
earlier in the build for the four sides
and every bit of it was a beautiful
straight grain with a decent amount of
curl to it i went with box joints for
the drawer joinery and this was the
first time that i tried making vertical
table joint cuts without first running a
shoulder scoring tool path and the
results were great a quick test fit of
the joint confirms the fit and the rest
of the joints are knocked out a couple
stop blocks in the vertical table
direction make batching out all of these
cuts quick and easy i'm not sure how
much of the clean cuts were due to not
being aggressive with the cut versus the
great cutting properties of ash ash is
probably my favorite hardwood to use
with a cnc machine because it just cuts
so cleanly
for assembly of the drawer i used hide
glue and hide glue is another great glue
choice when you want a little extra open
assembly time versus pva glue hide glue
also lubricates the joint which is my
favorite reason for using it versus pva
glue which swells the joint makes it
harder to assemble due to its
water-based nature i didn't use any
clamps on the drawer as the joints were
tight enough to not want to move once
seated i just made sure that the drawer
was square and set it aside to dry
because the drawer was already on the
short side i didn't want to waste any
interior drawer height by putting the
drawer bottom in a dado instead i set up
the router table with a rabbeting bit to
cut a rabbet on the bottom side of the
drawer this will maximize the interior
drawer depth i made this entire rabbit
cut in the climb direction making climb
cuts with a router will guarantee no
tear out
but it also makes the process a little
bit more challenging meaning that the
direction of the bit was wanting to
climb the material or pull the drawer
away from me the entire time the
rabbeting router bit creates a radius
for the inside corner so either chisel
the radius square around the corner of
the bottom panel which is the route i
took the bottom panel is cut to length
and width at the table saw and then the
radius on the corners is established
with a belt sander
a small amount of fast setting glue is
added to the interior corner of the
rabbet and the panel is set in place
rather than clamps i used some scrap
wood and steel weights to add some
downward pressure while the glue sets on
the drawer i sanded the legs and broke
all the edges on the dovetail rails i
also sanded as much as i could on the
bottom with an orbital sander once the
drawer was dry i cleaned all of the
sides at the belt sander i have a
precision miter gauge for this machine
so once dialed in it's pretty fast to
sand objects square by rotating the
freshly sanded face against the miter
gauge fence over and over again here you
can see how the drawer will work the
drawer can slide in and out from either
end and the square end will be facing
the main seating area while the angled
end will be into the open area of the
living room i contemplated not adding a
drawer pull at all because it will be
pretty easy to pull the drawer forward
by lifting up slightly on the bottom
edge but i ended up cutting a 0.75 inch
hole in the front and back just in case
now after having the table complete for
a few weeks i can say that this step was
kind of pointless we always just pull
the drawer up and forward from the
bottom with all the building done some
final detail work can begin and the
first detail was to cut the three ends
of the slab to their final length on the
very first cut i revealed a few internal
defects that didn't get filled with
previous steps so yay
more epoxy work
luckily the second and third cuts didn't
reveal much
time to pause once again and fill the
exposed areas with more epoxy after
another night of letting the epoxy cure
i was able to start cleaning up the
edges i have a rotex sander that can
remove material so fast add the foam
contour pad and it's a perfect tool for
stripping the slab edges while still
maintaining a natural edge look
even the end grain dovetail plugs are no
match for the sander it's just such a
time saving tool
for the top i switched out the contour
foam pad and stock medium density pad
for a hard density pad the hard density
pad does a better job of keeping the
surface flat and preventing any minor
dishing from softer areas being removed
faster finally a finish can be applied
and my go-to finish for the past year or
so has been a basic oil wax finish
nothing fancy but it really does make a
good job of highlighting the wood grain
it's not incredibly durable but it is
incredibly repairable for refinishing
your touch-ups down the road
also i'm not sure how well it's showing
up but after applying the finish to the
top i noticed i didn't do a good enough
job sanding and i still had some of the
milling marks from the cnc work so it's
not shown here but i did have to sand
off half of this finish on the top get
rid of the marks and then reapply the
finish the drawer got the same treatment
as well and i like how simple the whole
drawer system turned out it's it's
basically a tray i can move this around
as needed although it's it's going to
live its whole life underneath the table
here's a few close-ups of the table
while still in my shop and the wood just
speaks for itself there's a lot going on
there's some spalting here and there
there's some curl and compression
features in the crotch section there's
larger cracks that are stabilized and
highlighted with the black epoxy
and the bark inclusion is filled with
epoxy as well there's so much naturally
going on with the slab and now that i'm
finished i'm really glad i did not
distract from that beauty by making the
leg tenons through tenons
and here are a few final images of it in
place in our living room the
non-symmetrical shape of the slab it
aligns perfectly with the
non-symmetrical shape of our sectional
this is a great piece for this exact
scenario
and the most important thing the most
important thing is that my wife loves it
so yay that's it for this project thank
you to totalboat for supporting this
build be sure to go to
jscustomcreations.com
newsletter to sign up for my email
newsletter so you don't miss anything
that i publish give this video a thumbs
up if you liked it i would very much
appreciate that subscribe if you haven't
already done so and i'll talk to you in
the next video
you