Lecture 22 : PLM Components and levels (Part-1)

IIT Kanpur July 201
20 followers
Sep 6, 2024
[Music]
welcome back to the course carbon
accounting and sustainable designs in
product life cycle
management till now Professor deip has
given a detailed introduction to what is
carbon accounting different kinds of the
systems that is productivity sustain
ility concepts are also introduced Caron
accounting models are also given and
some introduction is given to product
life cycle management certain examples
are also discussed certain case studies
are also discussed and PLM components
and levels is one that I will discuss
today I will take further what Professor
deu has discussed in the prod Flex
management and I will try to discuss the
components of PLM levels of PLM and in
integration of PLM of different other
Management
Systems PLM as a system now we
understand is managing the life cycle of
a product the product could be at any
stage a stage is there when the material
for the product has just released a
manufacturer and there is a stage when
it leaves the company or a factory that
is other stage gate we call so there are
different stage Gates but from from the
credle to grave when we design the
product in such a way that till grave
when the product is totally disposed of
it is completely accounted for its LCA
that is life cycle assessment these were
the few words which were being used
previously a lot life cycle assessment
now what we do because now carbon
credits carbon sequestration lot of
things are there now we use the word
carbon accounting because finally what
is the amount of different other gases
equivalent to CO2 e or total carbon
footprint what are we producing could
now be calculated or could be Quantified
and this course is helping you to
understand how do we account the carbon
throughout the life cycle of a product
and how do we design the products in
such a way that those are sustainable so
let me have a quick review of the PLM
what Professor deu Philip has already
discussed in the last few weeks so there
were different stakeholders in a life
cycle management system so I'll keep
drawing the major stakeholder this would
be a symbol for stakeholder I keep
drawing throughout this lecture so this
is a
complete
product life
cycle
management product life cycle management
was previously restricted to designers
only what they used to do they used to
safeguard the design information now PLM
must connect facility connected to the
products that consist of mechanical
electrical software any components so I
will keep putting so we need the
connections other than the basic
requirements from
customers because finally what we need
to have is quality conformance as per
the customers requirement so
different people other than the direct
use customers are also there and we have
a business process
strategy these are all connected to
PLM previously as it was a
designers the designers used to play the
ma major role in designing what the
product is that is the ideation
concept or the product
planning this was all taken
care now different systems are
there for instance
it could
be
mechanical
electrical
electronics you know each of the cars
that we have discussed the smart cars
whatever those are we call it AI what is
AI we are definitely working for the
hardware in AI when we talk about iot
internet of things or we talk about iiot
industrial Internet of Things always
there are three components one is the
sensors which are the hardware which are
always Electronics electrical mechanical
components majorly Electronics
components are there then we have the
user who was to interface between them
and the final result the AI what we
output that we require so these
components are always part of it so when
we talk about PLM so we need to release
the things to the manufacturer so
whatever product planning the designers
are doing those are released to
manufacturer
when those are released to manufacturer
definitely when product planning is
there when we talk about people there
are vendors that whom do we order whom
do we get the materials from that we
call it vendor
development for instance we are running
a facility called as Medtech medical
technology I kpur where we design the
medical devices which are generally
non-invasive medical devices this is an
ISO 13 485
facility so here when we talk about
vendors vendor development is very
important to maintain the ISO standards
so the vendors should have
ISO
14971 this metric facility is though not
a complete manufacturing facility
because we only design the prototypes
then we send it to the clients or we
leave it to the clients to take it to
the manufacturing for approvals or so
but whatever material we produce
whatever materials we procure all the
materials should be gotten from an ISO
certified whether it is ISO 14971 or
those are the other General ISO
systems I am writing ISO 90001
derivatives I'm calling derivatives
because different components different
class of the component different kind of
the materials are having other than the
regular 901 derivatives which are
derived from this only now when we are
talking about the vendor development if
there are vendors who are not having the
specific certificate we have to develop
the vendor information now if I am
saying carbon accounting for a complete
cycle or the life cycle of a product the
raw materials that I'm getting should
also be certified in such a way so that
I calculate or put the carbon CIT into
my present use it is always in the three
phases when we say before
use during use after
use before
use during
use after use so this is from the
customer's perspective I'm talking about
customer
here so during the use of the customer
when you have purchased the Toyota
Innova High cross car you are the
customer you are using the car for next
5 years you will drive the car that is a
during use
space once you sell the car or you
resell the car the car becomes a used
car it is reusing then further it goes
to recycling phas that is after
use anything that manufacturer is doing
is before use even whatever is happening
before manufacturer that is also before
use itself so these phases we'll discuss
in the forthcoming lectures the point
I'm trying to tell here is vendor
development evaluating the vendor with
the experience of the vendor for example
many vendors are there those who are
supplying to I kpur for more than 10
years and the materials that they have
supplied they question which are
developed so how are the materials and
go so those vendor development systems
are to be developed this always
becomes the stakeholders of the total or
complete PLM system and definitely when
we are talking about product planning
ideation design we cannot
forget when we're talking about product
planning process planning would come
definitely following the product
planning so these are the
major concerns which are there in a PLM
system other than this because we are
not talking about digital devices we are
not talking about software application
we are talking about many other
electrical electronics components we
will talk about slm service life cycle
management we'll talk about Alm
application life cycle management and
how do we finally try to have a carbon
accounting throughout the life cycle of
any service product application whatever
we are developing so we'll talk about
all these things let me try to see now
the components of the product life cycle
management when we try to develop a bill
of material or when we try to develop a
total requirements for our product there
always has to be
collaborations so these collaborations
are social collaborations like of the
things that exchange of information by
means of mobile technology within an
extended business processes in PLM to
utilize a single source of the
information a single source of the
document that helps us to totally put
the information within the PLM system so
as products becomes even more complex a
technically advanced in the era of The
Internet of Things these things are
mandate so there are certain softwares
which are available that we can use I'll
call software
systems for
instance
seamons
BM so here I'll talk about the seens PLM
system in detail the NX that designs the
techn matics that makes a process
planning for you then team centers that
give you complete carbon accounting
those parts we will discuss now when we
are talking about the components of a
system we need to understand the
different factors in addition to
requirements that have been identified
that is we establish P&M to be a dynamic
and a gap between different individuals
different components and pmm
professionals will bridged so these
components are to be first jotted down
then a prompt provision of the training
of different business stakeholders is
important so let me first first try to
put different components so first part
is the data
product data
management following my part of the
course Dr peral Pratap Singh will come
up with different databases and how do
we develop the databases how do we
connect them the UI he will discuss but
product data management is important
part when we talk about components of a
PLM system in which when we talk about
any PLM system any product I'm talking
about a tangible product here so
we have a cad computed edit design that
is the feel of the component that we
Design This is a stylus I need to design
the stylus I need to understand the
complete carbon counting and whatever
first and the form was part or the step
would be to design this design means I
will have a software design computer
edit design where specific sizes all the
specifications we put colors could be
put I could have a feel or the look of
the product when we have developed there
and using different other parts I will
come to that we can also have a rapid
prototyping system that a 3D print and
try to have a feel of the weight size of
the components as well so CAD is one
data or one data set that you develop
for any component then definitely we
need to have a Bill of material I'm
putting
ebom e is engineering bill of material
when I say engineering bill of material
this is a complete list of the
components which are required from the
engineering Viewpoint so this e bill of
materials is a entity here in the
product data management then we
have release orders when I say release
orders these are the lead orders to the
manufacturing concern after product data
management another component is
manufacturing Process
Management manufacturing Process
Management employs when we have already
the E bill of materials that is
engineering bill of materials now I need
to have the processed layout
process layout that how would be my
machines placed now how would be my
different transfer of materials or
material handing system would be there
this would be a processed layout then we
have long process layout because we have
developed the engineering bill of
materials that is the product bill of
material already there in the part one
one now we also we will have
MB this MB is my manufacturing bill of
materials when we have manufacturing
bill of materials I will definitely have
a process
plan then when the process plan is ready
this process plan has to be further
disseminated or to be given to the
people are going to work upon the
operators the workers that is my work
instruction and definitely when one
constructions are given there would be
small changes we have a control
plan this mbum is also known as
po that
is Bill of
processes for instance if I have to
manufacture this stylus I would first
have to put what are the different
processes if it is a metal component I
would first say I have a complete
cylender for example uh uh maybe a m
still Rod is perchase that is one
process then there has to be Machining
second part is a machine that is
circular cutting machine called as L
machine then there has to be certain
Cuts may be available certain holes
might have to be made here then a drill
machine is required that is Bill of
processes that would be following so
that is a manufacturing bill of material
I will put it
here and ebm are engineering wheel of
material now when I say control plan at
the end here definitely there would be
difference between the plan or the
schedule and the actual processes the
schedule and actual processes differen
is there therefore we always have a
change management
system in a change management system
there are different uh stakeholders
further here we
have production requirements we have the
product requirements known
as
PR because if any changes there that has
to be reported in this then we have
ECR
[Music]
ecn and EC
o what are these ECR is my engineering
change request so this is
a request and ecn is my engineering
change notice engineering change request
is for instance there is something that
is to be changed some machine when it is
available the put the specifications are
put lth machine cannot do a small stion
like this for example there's a step
here that specific L machine could not
do that has to be taken or that has to
be maybe outsourced or specific
components had to be ordered for that
that is the engineering change request a
small request if ordering of components
would be big request but if a small
change in the setup of the machine is
there that is a small request
engineering change request is a document
that is circulated to the all the people
who are involved in it so engineering
change request could also be sometimes
uh maybe unaccepted or unapproved by the
seniors so this is a very minor thing so
this is a request in the change of the
process on the other hand engineering
change notice those are issued by little
senior people that is something a change
that cannot be ignored that cannot be
disapproved this is a notice given to
the people then once engineering change
notice is ready then we come for
engineering change
order engineering change change order
now in this process in this overall
change order when we're talking about
I'm talking about General manufacturing
processes or general product design and
development process here when we are
talking in the context of product life
cycle management when we also involve
carbon accounting at any point when a
machining is happening for a specific
Machining specific set of operations
energy that is being used could be Heavy
for a specific set of operations the
scrap that is being produced could be
very high in amount so those changes
could also be requested could also be
notified using a notice or could also be
ordered further so these are parts of
change management other than this in
change management we have the quality
management man say quality management
there are documents such as corrective
preventive action
if there is a non-conformance
non-conformance could be minor could be
major minor non-conformance is a
component specific that is given it is
given little
01 out of the specified limits that is a
minor non-conformance it could be mo
non-conformance the the product or the
component that is being reported as
within the sustainable limits is
completely black in color black in color
means it is completely going out of the
the reports which have been given so
that is a corrective and preventive
action has to be taken what is the
corrective action immediately that is to
be taken to correct this mistake or this
error that has happened a preventive
action is in the future this would not
come so that it reflects Upon A
corrected part in the future components
which are being manufactured so that is
a corrective and preventive action
document is being presented other than
that we have ppap
in ppap is production part approval
process production part approval process
once the components and corrective
actions everything is taken then part
approval is again given by the further
people now along with change management
definitely we cannot leave here the
supplier management so as I mentioned in
the previous slide as well the vendor
development is very important so when we
talk about the change management because
the components or the raw materials some
of them are also supplied by the vendors
so we always have a vendor management or
supplier
Management in supplier management we
have majorly the approved vendor list
approved manufacturer part list I will
put it here
AML that is
approved manufacturer part
list then I also
have
AVL
approved vendor part list so this is my
manufacturer and this is
vendor we talk part lists here so all
the part lists are here developed Supply
management is very important what are
the requirements of the manufacturer the
parts which are required and sometimes
exact components are not gotten
sometimes the equivalent components are
there equivalent means the components
which are compatible to it for instance
maybe some of the mobile sets that you
purchase some of the cars that you
purchase those are stopped by the
company in manufacturing and spare parts
are also not available you try to get
the components or the parts which are
compatible with your car or with your
mobile and try to make your system work
so the manufacturers part list vendor
part list are
also gotten here then overall when we're
talking about all these systems here let
me try to put it in a
box so I'll put it like
this different components
this is to be completely managed by a
team that is managing your product the
team that is called as project
management
team that is also we call it one of the
components you call it the umbrella
under which all of these systems work
here we have a team that is working on
the new product
introduction NPI and it is talking about
as well the new product development so
these are the major components of the
PLM I will talk about the components in
detail in the forthcoming slides I will
JW on certain pointers here that is
number
one PLM starts during the concept
phase and during which components of
high quality and reliability are
selected for their anticipated and
extended
lifespans call it concept phase or you
call it the design
phase second important point
is all the important all the vital
components definitely and critical
components are securely regulated
through
an Enterprise business
process that is what is the
responsibility that lies with different
components here product data management
the manufacturing Process Management
change management supplier management
overall taken by the project management
the system if it is to be regularized
the components critical components are
definitely also taken into control with
the specifications the validation
because the product has to be commenced
the validation of the component till the
point the product is manufactured and
then till the point the productor goes
beyond during use and to the after use
phase also it goes so that is it is
regulated in this way also so another
characteristic or important point I will
put is the critical areas such as
product design and data development and
supplier and change management are all
taken care by project management team
so this
enables the manufacturing concern or the
product development concern to come up
with a
resilient product
development resilience means quick
response to the change a quickly having
corrective and preventive actions I
think this is well enough for this
lecture I will continue the components
of PLM in the coming lecture where I'll
try to explain all the different
components in somewhat more detail
product data management manufacturing
Process Management change management
supplier management and overall taken
care by the project management team and
also I will give an introduction to the
model how carbon accounting is taken
throughout the PLM process in the next
lecture thank you