dear students and participants of this
course on Railway
engineering we are now moving
forward and today our discussion is
going to be centered around
gauges in the previous lecture we
discussed about the permanent way the
requirements of the permanent
way the classification of the track on
the basis of the
speeds and then towards the end we
discussed about the single line and
double line broad gauge track wherein
the various components which are used in
con ction of a track like the formation
level and above formation level the bast
cushion the sleepers the rails what are
the sizes which will be there in terms
of the widths the slopes in The Cutting
or in the embankment all those things
have been
discussed now today when we are going to
Center about the gauges there are
different aspects which can be
talked first of all we'll be talking
about the definition
and then we'll see how the railway
gauges have been used around the world
you will find that they are not the same
there are different type of gauges which
have been used in different
countries then the next thing which we
are going to talk is the factors which
influence the selection of the
gauges another important aspect is and
has been experienced in India is the use
of multiple gauges and the problems
which has arised because of that use so
we'll also talk about this particular
aspect now this aspect has driven the
government in
1992 to adopt a uniform gauge policy and
this is what I also discussed in the
lecture one and lecture two and given
you some information about it towards
the end we'll be talking about the
loading gauge and the construction gauge
which are very specific items not
exactly related with the distance
between the rails but is related with
how the wagons are loaded and how the
things are being used in the case of a
construction now let us
start let us start with this gauge
definition now gauge definition as you
can see here there is a rail being
provided on this side as well as there
is another rail which is being provided
on the other
side this is the foot of the rail and
this is the Hat head of the
rail and there is a distance clear
distance which we can see between these
two heads and this is what is being
defined as the gauge so it is the clear
spacing between the two parallel rails
placed for the construction of a railway
track and as well as for the movement of
the
trains obviously on the basis of this
you will find that the wagons which are
being constructed the locomotives which
are being constructed and they're having
their wheels the wheels are going
to work in this particular Fashion on
this side and
similarly in this Fashion on the other
side so that means as soon as the gauge
is being defined what is the type of the
Rolling Stock what is the shape and size
of the Rolling Stock probably they are
also going to be defined by this
particular
aspect if we look at the various types
of track gauges which have have been
used across the world you will find that
there is a wide
variety and that is being shown here you
can see that they're starting from 600
mm and this is going to as high as 1676
mm and this 1676 mm which otherwise can
also be denoted as 5' 6
in is a gauge which is being used in
India and with respect to this one 676
there are two mortgages one is 1668
another one is600
mm so they can fall in the similar
category so one category can be defined
here in this
form then another one is related to 1520
1435 and
1372 now this 1435 if you remember in
the previous lecture we did talk about
it and we said that this one is a
standard gauge and there is a variation
within this standard gauge with respect
to uh this value there is two other
value 1520 and
1372 then apart from that if we go down
we have the narrow gauges the usual way
of using the narrow gauges again as we
discussed previously was 1,000 amm but
there is also 1067 and
914 and then we go down then we have two
more gauges one is 762 and 600
mm so this is a big variety which is
available of course when you select all
of these and when we'll talking about
the selection factors or considerations
we'll found
that the conditions at the ground level
will also govern that which particular
gauge we should adopt and
Implement here there is another diagram
wherein the different countries have
been shown they have been green color
coded and those colors they are
associated with the particular gauge
which is being adopted in that
country say if we start with India which
has a a light green color being shown
and that is also there in the case of
say
Argentina and this particular one if you
go on the right hand side you found that
that's the extreme corner and this
extreme corner is related with 1676
gauge now let us look at this particular
figure now here are two things which
have been shown one on the right hand
side another is in the center and these
are
correlated this figure gives you an idea
about the various gauges which have been
used across the countries in the world
say if we start with
India and if we look at the extreme
Corner in the diagram which is being
given on the right hand
side the light green color it Associates
with 1676 mm of the gauge and the same
has been used in the South America the
Argentina so this is one gauge which is
being used in two of the countries now
if you see in India it is also being
used in
Pakistan and the similar color if you go
towards a bit darker side then it is a
bit lower than 1676 which is a uh
another broad gauge
gauge which is being used here and this
you can see
here now in the case of uh various other
countries where the blue color is being
shown say you talk about the North
America you talk about China you talk
about Europe you talk about Australia
some portions of Africa then this is a
blue color if we go to that then that
comes out to be 1435 M that means a
standard G gug is being used
here if you see Russia then the gauge
which is being used here is600 mm a bit
different than what we are using in
India or what is being used in the other
countries where the standard gauge is
being
used again if we see half of this Africa
then half of this Africa is being using
a gauge which is again a bit different
than the normally standard gauge being
used
so that means there are large variety of
uh gauges which have been used depending
on their requirements depending on
whatever are the uh type of development
they assumed perceived and then
implemented here there is another
diagram and in this one again the
networks have been shown and those
networks are again color
coded so if we start from the bottom and
we take 1676 mm which is being shown in
a yellowish shade then this is provided
here this is also being provided in some
parts in this continent but if you go to
1668 or 160 then you may find that there
are color codes different color codes
which are here as well as here and some
part of Australia also is having this
type of a color code that means the
gauge is being used but not the normal
one which is being used in
India if see you see this red color this
red color is
1524 a big area is being utilized by
that along with the 1520 so these are
the two things which are being
considered you can see that there is a
bit difference of color here and then
the beggar network is of the same color
if you talk about southeast Asia if you
talk about Europe if you talk about
North America then we are at this point
which is 1435 the standard gauge which I
have talked to you in the previous slide
also so this is a overall Network which
is available but there are many
countries say if you see here in this
area or if you see in this particular
reason we find that the railway network
is not available or the railway network
is not available in the to more north of
the North America or if you're going
north of the Canada or Alaska so there
also there is a issue similarly in
Australia 2 a major portion is there
which is not being connected by the
railway
Network now let us come to how we are
going to select a railway track
gauge now this is going to be decided on
the basis of first of all the cost
you're going to implement the biggest
one or you're going to implement the
smallest one the cost is going to be
different another one is a traffic
consideration what type of traffic what
amount of traffic what is the load so
that also is going to decide that what
type of gauge needs to be
selected and lastly the physical
features of the country will also define
whether we can go for the biggest one or
the smallest one see if we talk about
the third component here which is
physical features of the country what it
says is the gradients curves Bridges and
tunnels they become the important
aspects which needs to be taken care of
while deciding or selecting a gauge now
if we say that we are talking in an area
which is something like this a rugged
area hilly area and there we need to
provide the rail network so as to reach
to the top of the hill now in this case
the gradients needs to be
decided in the previous lecture we did
talk about that the gradients should be
gentle and they should be
uniform so that means we cannot have a
gradient which goes in this form and
then we directly reaches here it is
going to be a very steep gradient and if
we talk about a full load of a train
which can be thousand turn then in that
case it will be difficult for the
locomotive to haul it so this is one
aspect and when we talking about curves
bridges in tunnels see in this case also
another important aspect is how much
space is available for cutting at
different points so at this point or at
this point wherever the cutting is
required and it may not allow us to go
to a bigger gauge which is a broad gauge
which is of 1676 mm size and instead we
need to go maybe the Narrow Gauge or the
hail gauges uh so as to be providing the
connectivity between the two locations
which are a part by aain Heights
similarly in the case of tunnels to you
have to dug it so how much space needs
to be dug in the horizontal Direction in
the vertical Direction vertical
direction is going to be decided on the
basis of the height of the wagons and
the locomotives and the clearances which
needs to be provided alongside that and
the width is going to be decided on the
basis of gauge so here if this is the
total width which we are requiring
for say the broad gauge in the case of
Hill gauge then maybe the requirement is
very less so this will also
Define similarly in the case of bridges
whether there is a change in terms of
the cost we are going to talk about that
particular component just in the next
slide where we will be taking of cost
considerations so physical features also
have a say in deciding what particular
gauge needs to be selected now let us
look at the cost
considerations we are going to provide a
new connectivity so the very first thing
which will come as a commodity there is
the
land now what is the cost of the land if
you're talking about a builtup area if
you're talking a area which is very near
to the development then in that case you
may find that the cost is very high and
if you acquire it and you have to pay
for
it even as a government agency then this
is going to be very big
component so this is one consideration
here and has been a point in the
selection of the meter gauges or the
narrow gauges when we started developing
the railways in India from the British
period
onward along with this when we say that
we are going for a broad gauge then what
amount of earth work needs to be
done this is also another important
aspect you will find that the the more
area is to be occupied and therefore the
Earth workor requirements in terms of
the digging in terms of stabilizing in
terms of then putting the material there
is going to be much different we have
discussed about the single track we have
discussed about the double track we have
talked about what is going to be the
formation width in one case above 7,800
mm on another case more than 13,000 mm
so that defines
that how much earthw work is going to be
involved in that and similarly the
components the components in terms of
what type of sleeper is to be provided
what type of rail is to be provided what
is going to be the cushion of the veloc
below the
sleeper so what it says is as we keep
increasing the gauge from the smallest
to the highest one there is going to be
a proportional increase in all of these
components so this this is one aspect
another aspect is
Bridges now in the case of
bridges it is being observed that the
total width which is going to be taken
up that is not going to make a much
difference in the case of the
construction activity and the cost to be
incurred on the construction of that
particular Bridge so there is only a
marginal
increase because many of the things the
deck Etc needs to be decided on the
basis of the possibilities that tomorrow
tomorrow there may be a requirement of
upgrading a smaller gauge to a bigger
gauge so the bridge cannot be
constructed again and looking at that
particular
scenario or those particular condition
you will find that the bridges needs to
be constructed with all those weights
which are required otherwise for the
bigger Bridges and here when we are
talking about bigger gauges we see broad
gauge then buildings and
signals these are the Commodities which
needs to be there so if you're going to
operate a system there will be a
building it is not going to be affected
by whether you are operating a broad
gauge or you're operating a meter gauge
or a Narrow Gauge similarly the signals
have to be provided their sizes their
functionalities are not governed by the
selection of the gauges so therefore
there is no change in the
cost Rolling Stock this is independent
of gauge this is being decided on the
basis of what gauge is there and
accordingly you have to use that so we
cannot consider it as a cost
consideration here when as soon as we
have decided we are going for broad
gauge or we are going for a met gauge so
Rolling Stock is going to be a different
in that
sense then another consideration is
traffic how much amount of load is going
to be there how many passengers are
going to be moved how much amount of
freight is going to be moved from one
location to another
location so number of passengers the
gross million tons of of the freight
which is to be transported so those
things if you go for a wider gauge
allows us to transport more so high
volumes can be transported if you're
going for a higher sizes of gauges
because those higher sizes of GES will
change the Rolling Stock and that change
will come in terms of the coaches and
wagons which we are going to utilize for
the transportation and as soon as the
sizes of these coaches or wagons are
increasing it means it allows us to
Ferry more number of passengers it
allows us to transport more of the
freight from one location to another
location another aspect is that if we
talking about smaller gauges narrow
gauges or Hill gauges then stability is
one
issue there's a movement of a train at a
speed and the winds are also blowing in
that case this uh aspect becomes more
important so when you go to a wider
gauge say a broad gauge it allows for
that stability and allows for the speed
increase
also so when the speed increases there
is a faster movement and the travel time
is going to be reduced it also has an
indirect impact on the GDP of the
nation then if you talk about signaling
or the traction equipments in the case
of a traffic whatever traffic is there
now that has to be there if you have to
go for signals if to go for
interlockings if you go for any other
devices which needs to be provided on
the track they have to be there so it's
independent of the gauge now operating
cost per 10
kilometers it reduces with the wider
gauge because you have traveled the same
distance but you have taken more
Commodities with you and because more of
the amount of more of the passengers
have been transported from one location
to another location so the total cost in
terms of
tons kilometer or in terms of passengers
being hauled from one location to
another location uh that improves a
lot now let us talk about the problems
which any country can face if they are
adopting multi- gauges so they have all
the gauges which are possibly there so
whatever has been shown
here these gauges are available in our
country and then what are the issues
with that the very first thing let us
talk about the passengers who are going
to be transported from one location to
another say from A to B and then they
have to finally reach C whereas AB is a
broad gauge and BC is a meter gauge
section so what are the issues which are
going to be there very first thing at
this location is station B there is a
change of
plateform and because the type of the
Rolling Stock is different type of the
permanent stock is different
here so here in the case of the two
platforms wherein one platform is
dedicated to Broad gauge another
platform is dedicated to meter gauge
there will be a requirement of Crossing
from one platform to another platform by
way of a say a foot over Bridge so this
becomes another hindrance when we are
going for a multi-gas system the
material has to be transported so there
is a hauling of luggage it may be
required that if the Manpower is not
available there then in that case you
have to do it by yourself otherwise if
the Manpower is available then they can
haul your luggage to the other
platform but another important issue is
that the train which has come on the
broad gauge and now you have to go to
the meter gauge or a vice versa in all
of these cases if this train arrives
late then you may find their connection
is being
missed so this is also an important
aspect you always have a tension that
you have to catch the train on the link
line and if there is a time which is
being lagging there is a delay in the
arrival then there is an
issue transfer during the night time is
also an important issue and specifically
it becomes more important for the
vulnerable users like uh woman children
and if they are to move from one side to
another side it is a difficult aspect
transshipments of goods is another
problem now as I said that you have this
one platform wherein the lines have been
used for a broad gauge and there is
another platform where the lines have
been used for met gaug now if the
material has to be transported from this
direction to this or the vice
versa then there is a possibility that
damage may occur to the goats which have
been transported
at the same time during this
transporting the material there is a
possibility of a theft
also or sometimes if the train is not
available simultaneously on the two
platforms then we have to store so the
storage facilities have to be created
and those storage facilities will get
created on both of the sides because if
this material is going to this side so
so first of all it will be stored here
and then as soon as the specific train
arrives in which it has to be loaded
then this material will be loaded and
similarly there is going to be a storage
on this
side now delays are caused in this
particular case if the train would have
been there on the same platform then the
material whatever is lying here could
have been transported to this side or
this side depending on which particular
train is to be used mishandling is also
another important issue which may occur
in this case
then let us talk about the Rolling Stock
now because we are talking about two
different type of tracks say as an
example which we have taken there is a
combination of a meter gauge and a broad
gauge so the Rolling Stock is going to
be
different the locomotives which are
there they will be different the wagons
will be different coaches will be
different so because of this what
happens is there is an inefficient use
of this Rolling Stock
the material which has come the train
which has come with the materials of the
freight it stops there empties it and
now probably it is going back empty
unless until there is a material which
is to be transported back and which has
been brought up at that particular
location okay so this is a problem this
empty movement this empty movement is a
having a cost means there is an
operation but you are not gaining
anything as a revenue because nothing is
being taken with you now another issue
is that this material Rolling Stock will
remain lying ideal for a long period of
time say we have provided a schedule
wherein the meter gauge train has been
connected with the broad gauge
train now the meter gauge train has to
arrive and once it arrives then only the
broad guge train will be moving now this
is getting late so if this is getting
late and this remains standing here it
is not in
use so this is one another aspect which
can be there and it can also happen that
this broad gaue train has brought the
people and then it has moved with the
meter gauge train which has a round trip
so in this round trip unless until it
comes back with the people then this
broad Gau train is not going back so
this type of a situation can also arise
and if any of such thing happens then it
is simple a waste of the Rolling Stock
there now transferability of equipment
is not possible between the broad gauge
and the meter gauge for the obvious
reasons because both are different they
have different wids they are different
type of sizes of the material which have
been used as a component of the track
and therefore we cannot use that okay if
there is a problem on a broad Gau strike
we bring it from the meter gauge if
there's a problem on a meter gauge
strike then we can take from the broad
gauge and put it on the meter
gauge another issue is the duplication
of facilities this may also appear now
this duplication of facilities may be in
terms of say the sheds and yards because
there is a difference in the Rolling
Stock and you need to have two different
yards or two different shetes where the
maintenance activities of these
particular Rolling Stock can be taken up
and when we talk about this maintenance
activities then the maintenance
equipment will also be a point of
consideration there another thing is
that multiple waiting rooms and spaces
needs to be created on both the sides on
one side where the broad gauge lanes are
being provided on other side where the
meter gauge lines are being provided so
this is another issue as we said that if
there is a connectivity between the two
trains one coming on a broad gauge
another going on a meter gauge or meter
gauge versus broad gauge then people
need to uh wait there and if they have
to wait we need to have certain spaces
for that platform are also going to have
different
specifications the size of the Rolling
Stock say the wagons which are being
used the coaches which are used for
transporting the passengers they are
different and accordingly the height of
the platform is also going to be
different in these
cases then if you go for a future gauge
conversion in these cases it becomes
difficult because in the case of a meter
gauge to be converted into a broad gauge
first of all you have to take out each
and everything and then the totally new
new material totally new components
needs to be
installed so this is also another
important
issue then hindrance to fast movement of
goods and passengers wherein the delays
or the emergency situations may arise
because you cannot do it in a faster
manner there is a location as we
discussed previously we are moving from
A to B and then connected to C where in
one case it was broad gauge in another
case it was meter gauge so now there's
no possib ability to move from a to c
directly and because of that now this
delay which is appearing at this
connecting station B is a issue now
hindrance to the balanced economic
growth is also another important point
now what happens is when you're using
broad gauge when you're using the bigger
size of the uh rolling stocks the wagons
Etc it means you're transporting more
and if you're transporting more it has
direct correlation with the industrial
growth in terms of the Productions and
the consumptions which otherwise are
associated with
it so the Industrial Development will
come more if you have a wider gauge as
compared to a smaller gauge the movement
between points of production and
consumption is also going to be an
important aspect because here it will be
more easier to take it as compared to
the same condition as we discussed that
if there is a transshipment of the
materal
at the station B because of two
different tracks then there are
possibilities of hindrances there
possibilities of TS their possibilities
of Damages etc
etc now let us come to the uni gauge
policy of 1992 which was started and
from there onwards the government
decided that we are going to slowly
convert all meter gauges or narrow
gauges as far as possible based on the
ground conditions or or the tering
conditions in that particular area to
Broad gauge now if we do this then
whatever the problems which we have
discussed previously are going to be
eliminated one by one and that is what
we are going to discuss in these one or
two or three
slides so very first thing is the
elimination of the transport bottle
neck what are the eliminations here
there is no need of trans shipment from
one location to another location so we
are here on a broad gauge system and we
are there on a meter gauge system so
nothing is to be taken here or here
everything is going into that
same ambut of broad
gauge there are no waiting and delays in
terms of these trans shipments because
everything is there so we can do it
faster if the commodity comes through a
particular train here then it gets
transferred to another train on the
other side as soon as it arrives so much
not much weight or delays may be there
there in elimination of the
inconveniences which are being caused
and the handling of luggage is also
easier you need not to cross unless
until of course in the case of a
multirack system you need to cross from
one platform to another platform but now
we are providing facilities in terms of
lift we are providing facilities in
terms of the escalators and therefore
the problems which are associated with
the handling of luggage may not be there
the removal of trans shipment hazard
it induces the better safety for all
users for all type of Commodities which
are going to be transported this is uh
one
aspect another aspect is the reduces the
damages Taps and mishandling of the
luggages because if you're going from
one side to the another side and there
is a difference in the the way it has to
be transported there the conditions are
different then there are possibilities
of these d es and Taps or mishandling
which reduces but we cannot say that
they have got eliminated they will not
get eliminated there is still
possibilities even on the same platform
if you have to transport from one side
to the another side platform two to
platform three these things may happen
elimination of unsafe transfers during
night time now because now you have one
single platform you have combination of
platforms depending on the number of
tracks all being lit properly and being
connected properly so this unsafe
movements will be lesser so there is a
possibility of elimination or there is a
possibility of reduction in these
particular
things now in the previous case we
talked about that this non-efficient
utilization of track and the Rolling
Stock is there but as soon as we go for
a uniform policy what happens is that
higher efficiency will be achieved and
his higher efficiency is in terms of the
movement it it is in terms of the travel
time Associated and it is indirectly
associated with the cost of
Transportation so these efficiencies
will be there now reduction in the
operating expenses are going to be there
because here we are not changing the
Rolling Stock the same Rolling Stock is
going to be utilized so
that's brings in that particular
positive aspect lesser or no idling
situation may be there the Rolling Stock
will remain continuously in use of
course it has to be kept idling for
certain period of time and that period
of time is a
minimum maintenance
time and that minimum maintenance period
has to be there we cannot remove that so
that will remain so that's why we can
say that there is a listening of those
type of
situations provision of alternate roots
becomes possible as soon as this a is
being connected to
B and then connected to C there may be a
possibility that there is a another
route through which we can move directly
to C without requiring to going to be so
such type of things may happen if they
happen then the positive side is that it
reduces the pressure on the existing
Network another thing is because the
movements are faster there are different
ways in which or different roads in
through which we can move them so
economic conditions May improve there is
a possibility that if D is here then D
will also starts developing along with B
so that's a situation may arise higher
penetration of products will be there
because now we have a flexibility to
move in different directions without
requiring to change the things at
different locations there is more
flexibility which comes into the
movements and the connectivities becomes
much better
and when all of these things happens and
if we look towards the economic
perspective towards the people who are
producing the things who are interested
to distribute those two across the
length and width of the country then it
improves or boost the investors
confidence also so this is another
positive side of a uni gauge
policy now one another thing is that
when train has moved to one location to
another and then it has to come back and
that is what is a
turnaround so we are going in One
Direction and coming back to the same
location from where we started and if
this better turnaround is there then
that means we are improving upon the
operational conditions we're improving
upon the utilization of the Rolling
Stock so higher use of equipment will be
there and it will have a reduction in
the operational expenses because now the
stock is continuously in use and as soon
as it is continuously in use it means
the revenue is getting generated and as
soon as the revenue is getting generated
if we take it in terms of the cost and
benefits conditions we'll find that the
improvements are coming
there another thing is if the better
turnaround is there and there is a
possibility that this train which comes
out back here after moving from A to B
and now it has to go maybe after 12
hours or maybe after 15 18 hours again
on the same row so in that period there
is a possibility that we can move it to
C and it comes back from C to a
again and this happens within that
particular idling time period when it is
not going to move from A to B so this is
another possibility so better scheduling
of the operations are possible if we
have a uni gaau policy then higher user
benefits will be there we already just
talk about the uh benefits in terms of
passengers in terms of the industries
and optimization of facilities are also
going to be there so all of the
facilities now because previously we
said if we have a broad gauge here and
we have a meter gauge here so the two
sets of facilities will be
there two sets of yards will be there
two sets of uh maintenance equipment
will be there which are required for
these two different type of a Rolling
Stock now that is not required so that
optimization will be there it will
reduce the overall cost it will improve
upon the uh the utilization of those
equipment also which otherwise are lying
idal if that Rolling Stock is not
available for the maintenance
reasons balanced economic growth will
come into an area and this balanced
economic growth will be in terms of say
the reduction in the regional effects
previously if we have been developing
something in one area only now because
the connectivities have improved
therefore this whole of the system is
expanding laterally longitudinally and
that's where this becomes a better
aspect better and improved growth of
connected and unconnected areas this is
also uh related with the type of
connectivities which have been provided
and the branch lines or the other lines
which are being connected with the main
lines and dispersal of activities will
be a possibility now no multiple
tracking will be there extra facilities
with different specifications will not
be required so uh the
duplications the multiplicity of the
various things will not be there in this
case then multiple tracks yards
equipments with different specifications
will not be required we already talked
about this particular aspect uh
previously better transport
infrastructure is going to be there and
once better transport infrastructure is
there so efficient movements will be
there and when we say efficient
movements they are related with the
travel time and the travel cost and how
much minimum time period we can move
Commodities or the passengers from one
location to another location then direct
connectivity to different areas
previously served through meter gauge or
the Narrow Gauge networks now they come
into the direct connection with the
broad gauge connectivity and they get
connected to the different other areas
of the country and higher opportunities
in that sense will come to the masses
who were previously deprived because
they were provided with the Narrow Gauge
Hill gauge or a meter
gauge now let us talk about two specific
aspects and with that we will close this
uh lecture one is a loading gauge now
what is this loading gauge here in this
diagram you can see that there is
some size being
defined so there is a rail here and a
rail here so rail level is being defined
for that and then there's a height and a
width being defined for those rail sets
here we are talking about a broad gauge
so in the case of broad Gaz this maximum
height which is being defined is 4140 mm
where width is defined as 3250 mm what
does that mean is that anything any
wagon which is being loaded so if there
is a wagon which is moving here so this
should not go beyond these boundaries in
the horizontal direction or Beyond these
boundaries in the vertical Direction so
this is a loading gauge which is
provided usually at the Freight
locations where the freight is being
transported from one to the another
one now moving Dimensions which we are
talking here is basically related with
the construction aspect so here what we
do is we add the clearances to the
Loading gauges and those clearances when
being added to the Loading gauges then
in that case it will come out with
something like this as been shown here
for a broad gauge here 1676 a gauge then
2 440 and 3050 they are basically
related with the uh the sleepers and the
bast cushions width which are being
provided but then with respect to that
what is important to see here is that
the heights are being defined so if you
go up then the height is being increased
but it cannot go beyond 3250 maximum and
because have an electrified system then
it not also go to Beyond 4 to 65 mm
maximum so this is also important and
this is used in the construction of
bridges tunnels plateform sheds Etc so
this is one another aspect when we take
up a construction of these tracks needs
to be taken care of so with this we
close this lecture to today what we
discussed was the types of gauges the
factors which are used in the selection
of gauges the problems which are being
faced by the country because we have
used multiple type of gauge system then
the uniform gauge policy which came and
what are the benefits it has given to us
and finally we concluded with the
loading and the construction gauges
which are important in terms of the
operation and construction activities of
the tracks so we close this lecture now
thank you and we'll meet in the next
lecture