Basement Finishing Series Part 2 Laminate Flooring Trim Waterproofing Shower - Time Lapse

ZEM Construction
5 followers
2 Video Views·Nov 3, 2022
Basement Finishing Series Part 2 Laminate Flooring Trim Waterproofing Shower - Time Lapse
Hey guys, Zach here with Zim Construction bringing you another video in our
basement finishing series. If you haven't checked out part one, make sure you go back and do that.
So where we are at right now, the subcontractor drywall guys have just left. They did a great
job. We walked around and made sure to inspect everything. It looks really good. They hung
everything, mudded, taped, and then finished the texture. We did a light orange peel all the way
through. Now that everything is drywall, you can kind of get a vision of what this is going to
look like. Here are the pocket doors. I think we did a really good job at hiding this beam up here.
Turned out really nice. Master bedroom, nice and big space. And then the closet that we talked
about earlier. And again, another pocket door. And we went underneath the stairs. You can see
there's lots of space in there now with tons of really, really good light. So we work our way
over here. You can see the egress window over here. And we made sure to do bullnose corners
to match what they have upstairs. We put in a windowsill here. And work our way into the bathroom.
Again, another pocket door. You can kind of get a good idea of the footprint now. Huge, massive
shower. The vanity is going to go here. Of course, with the toilet. So the next step in the process
is we're going to run through with a PVA primer to treat all this drywall. And then flooring starts
tomorrow morning. So stay tuned. Okay guys, so like I mentioned, after all of the drywall is complete,
we like to come through with a PVA primer. PVA is essentially a treatment for the paper as well
as the mud products that are used for doing all the drywall. And what it does is it essentially
hardens those surfaces. Adds somewhat of an insurance policy for both me and my guys, right?
If we are going through and we accidentally hit the wall with a piece of trim or something. Just
making it a little bit harder makes our lives a little bit easier in the long run. As well as
for the homeowner, of course. You know, people live in these spaces. They move in furniture. They live,
play with toys. You know, all of those things. So anything that we can do to make that
a little bit more durable for them. Of course, we like to take advantage of that.
So after all the primer is done and dry, we pull up all the masking. My drywall subcontractor
lay a masking for us anytime we're planning on putting a laminate or an LVP down. Just to keep
all of the excess mud and build up off of the concrete floor. But of course, we like to go
through. Sweep it all really well. Vacuum everything. Scrape off every little piece
of debris so that doesn't come through the flooring later. So the product that the homeowner
actually chose was a laminate flooring. A very nice durable product. Has a foam pad underneath
for both sound as well as comfort. But the manufacturer did recommend that when installed
over a concrete slab or subfloor that we lay down a moisture vapor barrier. So
my supplier essentially calls this product a glorified plastic bag. That's really all it is.
Comes in large sheets like this. So we lay it down using a moisture specific
tape. Essentially just a thicker duct tape that has really good adhesive properties. So
we get that all laid out and then we can start going on the laminate flooring.
So something that I learned somewhat recently, which is kind of a surprise as long as I've been
in this industry, is I assumed that all click-together flooring, so laminate and LVP,
was all installed the same way. That is absolutely not the case. Most products have a little bit of a
unique way that they are installed. So the way that the tongue and grooves face where to start.
So this product, for example, the manufacturer suggested starting in the top left corner with
tongues facing up and then working your way left to right. So again, those little pieces of paper
that you normally just throw away when they fall out of the box, I would grab that, read that when
you're installing flooring for yourself, and make sure that you're following the guidelines that
they set. In some cases we have to go against those guidelines like we are here and working
our way up backwards. Most flooring is capable of being installed this way, just a little bit
more difficult, a little bit more time-consuming. So we did it in this case because we wanted
the lines that travel through the pocket doors to be perfectly straight and parallel with the
rest of the room. So we started in one room, worked our way down, established those straight
lines, and were able to work our way back up the other way. We learned that the reason the
manufacturer suggests this is that putting in those last final pieces up against the wall
was a little bit difficult. We took our time, made sure we did it correctly,
utilized the right tools to get that installed, and it was not that big of a deal at all. But
as you can see running through these pocket doors it turned out perfect. We're very happy to not
have any seams or transitions or anything like that. The entire space is laid with one product.
One thing I'd also suggest when bringing in or installing in your own flooring is
saw blades. There is blades out there that are designed specifically for laminate flooring. I
would invest in those. Just know that either way you're going to be buying a new blade. So if you
don't use a laminate blade designed for laminate flooring you're going to destroy that blade and
it'll be ruined and it'll have a really hard time making any other cuts on wood or anything else
like that. So we used both a chop saw as well as a track saw in order to make the long straight cuts
for some of the smaller thinner pieces and of course had specific blades for those. And I've
made the mistake in the past of not using correct blades and just completely ruined them. It doesn't
matter how nice they are, how much money you spend on it, carbide tip, any of that. If it's not
designed for laminate flooring it will be unusable after that. So after we worked our way through
the gap where the double pocket doors go, we're essentially working on separate rooms at that
point. Just kind of moving along. I do have a very specific method that I use when laying flooring
as far as a pattern. I looked all over YouTube and everywhere else, even asked industry professionals
about how to lay flooring in a systematic way that appears random and there really isn't a
correct answer. So my brain is way too systematic just to pull stuff out of the box, make random
cuts and get it laid down. I do not like when scenes line up or when there are patterns that
look kind of ugly because essentially what could happen is if you do have two or three pieces that
don't look great, that pattern is replicated throughout the entire row of flooring. So if
that is something that is interesting to you guys or something you've found, please let me know.
Leave a comment if you'd like to see a video about that. I'd love to show you some of the methods
that I've developed over the years. So after all of the laminate flooring is laid, we go back and
actually mask everything again with a RAM board or an X-Board, one of those products. After all
that is done, the next step for us was to waterproof the shower. So I have said it time
and time again, I know there are many, many ways to waterproof a shower. This is, again, this is
the method that I was trained on, I have been taught. We went with this method as opposed to
a Schluter or a Wedi or a Tile Pro or any of the other ones simply because the shower pan was a
pretty unique shape. We didn't feel like spending a bunch of money on a huge pan having to cut it
all down and essentially not using it. So we poured our own pan anyways and then decided to
use a Redguard and mesh waterproofing system. I also, as a little bit more of an insurance policy,
my drywall subs will use an exterior grade dense shield in the shower. As you can see,
it's a little bit different color, it's actually a gray product and it is mostly fiberglass and
is rated for exterior use and will not degrade or rot or anything like that with exposure to
moisture. So that coupled with the Redguard method that we use, we actually incorporate a
fiberglass fleece mesh. This is the proper way to use Redguard or a roll-on waterproof membrane.
I think these products get a bad rap in the industry because they can fail and the reason
they fail and just like any other waterproofing system is because they are installed improperly.
I see countless videos all over YouTube and everywhere else where Redguard is used as
waterproofing system but they do not utilize this fleece here. So I think it is crucial to use this
product. Extra precautions are taken in order to make sure that we do not have any issues down the
road as far as water in those things. So essentially how this stuff is installed, similar to paper
mache or anything like that, you do a very even coat where the mesh is going to be laid, stick
the mesh in, squeeze out any of the excess to make sure you have it nice and flat and then go back
and do a layer over this. Completely encapsulates the mesh, adds even more barrier as far as
waterproofing. My employee Cody is going through, he added a layer inside the niche, outside the
niche, in all of the corners. Now he's going through and doing the pan and the back inside
corner. We essentially add this product anywhere there is a change of plane for most corners and
then we also paint a roll on any of the flat surfaces. So the walls as well as the shower
pan itself. The walls and the pan will get two to three coats. The inside corners will naturally get
three to four coats just because of the two layers on both sides of the mesh. So after all of the
waterproofing we go through and start laying trim. So we spray all of our trim and baseboard. We use
an airless sprayer. I just think it looks so much nicer than painting it prior and then having to go
back to fill nail holes and touch up. So that's why all of our flooring is masked because we're
essentially getting ready for spraying that. We had the painter on site a little bit early. They
were available and they asked if they could come in and start prepping. So they were prepping
door trim and as I was laying base they were coming right along behind me getting all those
nail holes filled, caulking, getting prepped for paint. It was kind of a game, a little bit of a
I was making sure to try my best to stay ahead of them. It worked out fine. They were completely
understanding that they were there a little bit early but it worked out great. One of the things
that I did in this project that was a little bit unique was because of all of the pocket doors
there was really only two steel studs on each side running through where the pocket doors go.
As opposed to doing some type of nailer or ledger or something like that for the baseboard to be
nailed to, actually I still screwed in the baseboard to the steel studs just like I did on
the uprights of the doors but I also used a construction adhesive to adhere the baseboard
to the drywall that goes around there. So screws with the construction adhesive and I got little
one inch 18 gauge brad nails to fasten the baseboard to the drywall itself while the
construction adhesive dried. So again a little bit unique, a little bit different but I think
it worked out just fine. All of my outside corners are pre-assembled and CA glued so that
we have no gaps that develop over time and those corners look really nice. Of course all the inside
corners are coped and here is a really good example of a pre-assembled outside corner piece.
All three of these pieces are pre-assembled so that the corners are at perfect 90 degrees. The
miters look really nice. Both sides of this piece were coped in order to match up against the left
side and the right side around the stairs going through adding a bunch of small pieces.
Wherever I can I try to avoid using quarter round. I know it's an industry standard just for me
I feel like it kind of looks like an afterthought. Maybe the flooring wasn't installed right, it's
too big of a gap. It's like okay we'll just add quarter round. So where I can avoid it I do.
Of course I think it looks really nice and it makes for much cleaner smoother lines.
Hey guys thank you so much for taking the time to watch this video. We are wrapping up part two. So
we have got all the trim and everything ready to go. The painter is currently in the process of
painting the trim. We didn't show any of that because it's white on white. It's kind of hard
to see but you can get an idea of what it looks like. So we also got all of the door trim done.
All of the pocket doors are all completely trimmed out. Look really nice. We're going to leave those
in right now because the paint is currently drying. We don't want to touch those. And the
flooring is all completely done. This is a really cool piece of the project because although it
looks like a job site we really are in the home stretch. We really only need color on the walls
and then to finish up the bathroom. You guys saw we got that all red guarded and waterproof and
ready to go. Next step is tile the shower and then we can get the vanity and all those bathroom
fixtures in. So again thank you so much for taking the time to watch this video. If you would please
subscribe. We have more videos coming out from this project as well as lots of other projects
down the pipeline. So if you like these this type of content please hit a like. It shows the YouTube
algorithm that this type of stuff is doing really well. So thank you again so much. I'll talk to you
guys later.
