This week, I get down to business on the HOn3 Barlow Pass layout, putting down some cork roadbed, laying flex track and custom turnouts, and wiring everything for DCC power. Along the way, I demonstrate how to control model railroad turnouts with inexpensive slide switches that move the points while providing power routing to the turnout frog. My little slice of Colorado narrow gauge is well on its way! Empire Trackworks graciously provided the custom, hand-built HOn3 turnouts for the layout. Check them out at https://www.empire-trackworks.com/
Music: "Jeremiah's Song" by Dan Lebowitz - YouTube Audio Library "Country Cue" and "Rocktop" by Audionautix - YouTube Audio Library
[Music]
Howdy folks. Dave here at Thunder Mesa
Studio where this week I'm back working
on the H3 Barlo Pass layout. And I think
it's high time we got some track laid
and some trains running. Don't you?
Barlo Pass is my little 4x8 slice of
Colorado Rocky Mountain narrow gauge.
And my goal this week is to uh get the
cork roaded down and the track and
turnouts put in up here in the town of
Barlo Pass and then get all of that
wired for DCC operations. I'm not going
to be laying all of the track this week
for the entire layout. Mostly because I
have a couple of big bridges that need
to be built before I can really do that.
No, my focus is just going to be on the
town area up here. Getting the track
laid, getting it wired, getting
everything fine-tuned and running well.
So, let's take off these models here,
which I've put in place temporarily,
because the first thing I want to do is
sand down this joint right here where
these two sections of plywood come
together. It uh it could be a little
smoother.
I think that'll work. Now, these
beautiful customuilt turnouts that I'm
using on Barlo Pass were graciously
provided by Alan Lewazo over at Empire
Track Works. And I'll put a link in the
description down below so you can check
out all of the stuff he has to offer.
And before I go any further on this, uh,
I need to determine which of these
turnouts that he built for me goes
where. You see, they're all number six
turnouts, rights and lefts, number
sixes. But um he very thoughtfully asked
uh which side of the turnouts do I want
the throw bar to be on for each of of
the turnouts on the plan. And that's a
very important consideration. And the
reason that's important is say you have,
you know, a crossover with two uh
turnouts
uh you know parallel to each other. You
want that throw bar on the straight
route, right? Not in the middle in
between those two tracks where it's
going to get in the way. So now I have
lettered each of the turnout locations
and where the throw bar is going on this
one. It can go either way. Letter them
A, B, C, D, E, F, and G. And then I put
a corresponding letter on each of these
skeleton turnout kits that I got from
Allen. And then when it comes time to
put these together, put the the rest of
the ties in and lay them on the layout,
I'll know exactly where each one is
supposed to go.
I've also
glued down some of these FastTracks
templates.
Cut them out and glued them down in each
of the turnout locations. This is a PDF
you can download off of the FastTracks
website for free. It's a great service
that they offer. These are all for
number six turnouts. And I'm going to
lay the cork roaded right over the top
of these.
And that way I'll get an alignment which
is as perfect as I can make it for when
we install the turnouts. Now before I
start laying down that cork roaded, I
just want to show you where I deviated
from the plan right here. Look on the
original plan. This crossover is flipped
the other way. And the reason I flipped
it this way, this was a suggestion from
a viewer who saw the plan and said, "You
know what? Operationally, it'll work a
lot better if you flip that crossover.
That way, when a train pulls in, the
locomotive can just uncouple right here,
pull out here onto the stub, and then
back around and do the runaround
maneuver. And uh you know what? They
were absolutely right. So, hey, keep
those good suggestions coming. So, what
do we use for H3 roaded anyway? It's not
like there's a lot of commercial
products available.
Well, fortunately, there are a lot of
commercial products available for Ncale.
And as it turns out, this Midwest Ncale
pork road bed works really, really well
for H3. Also, I'll just lay down a bead
of yellow glue. Use a brush to spread it
out a little bit.
I'm going to start down here at this end
where the trestle is going to be, one of
the trestles, and just follow that track
center line.
and use the thumb tacks to hold it in
place till the glue dries.
And then we put the other side in just
like that. And now I'll fill in all of
this middle part. And this just involves
cutting and fitting
these pieces of cork
to uh match the turnouts. And uh
continue to follow those center lines.
Wait, wait. Time out.
I thought I had another entire package
of Nscale Corp roaded. More than enough
to do all of this. I bought some off of
eBay
a couple months ago. You see where this
is going, right? Well, lo and behold, I
open it up to find out that it's not
Nscale cork road bed. It's HO scale cork
road bed. So, you know, now I've got to
beg, borrow, or steal some Nscale cork
roaded from somewhere or find some uh 8
inch cork gasket material
in order to finish this.
Uh, unfortunately, I was unable to find
any nscale cork road bed anywhere, at
least none that I could get in a timely
enough fashion for this project video.
But I was able to find some 1/8 inch
thick cork material. And now I'm cutting
it into some strips that are 9/16 of an
inch wide to match the width of the the
separated cork road bed. And that that
way I can continue to lay it down in the
same way. So now I just need to go and
cut a whole bunch of strips like that.
Now I can finish up this roaded
using the same techniques I did with the
Midwest stuff. Cutting each strip to
fit, gluing it down.
[Music]
And just like before, have to do some
custom fitting like this for the
turnouts.
Truth is, it's actually easier
with these pieces that aren't beveled on
the edges.
[Music]
Going handheld here to give you guys a
better view from up top. Here's that
completed crossover
with the glue drying. Now, you know, I
could have cut pads for the turnouts out
of that sheet cork. That'd be another
way to do it. Um, but this way using the
strips is more economical, at least from
a material standpoint. You'll save a
little time by cutting out the pads, but
you'll save a lot more material by by
using the strips and cutting each one to
fit this way. Also wanted to show you
over here, this switch goes to uh the
service track, which basically goes
around here behind the coing tower and
the sandhouse, which will be right here.
I don't know how much room I'm going to
need for all of that yet. So, I'm just
cutting the roaded right off here. And
we will finish it at a future date.
[Music]
One thing I can do while I wait for that
glue to dry is install the DCC bus. Got
some uh 14 gauge wire here in red and
black insulation. And you want a
heavyduty wiring like this because it's
not only carrying the electricity for
the trains, but the digital signal as
well. I'm using a DCC system from NCE.
And we're going to run this wiring bus
beneath the roaded for pretty much the
entire run of the layout. That way, when
it comes to laying track, I can drop
feeders down every 3 feet or so and tap
in directly to that power and that
digital signal.
Going to start over here at the end of
track where this is eventually going to
connect to a staging yard or our future
module. And I'm measuring down about two
and a half inches from the roaded and
going right through the risers, which
seems to be the most expedient way to do
it. About a quarter inch hole. Reason I
measure down about two and a half inches
is that's going to give me room to work
when it comes time to drop those feeders
down.
coming back around the corner here.
Now, in some spots where it's not
convenient to go through the riser, use
an eyebolt instead or eye screw and just
run the wires through that. As long as
you keep them relatively close to the
track bed and
close to each other,
you should be in good shape.
And this brings us back around to where
the main controls are going to be, where
the panel is going to be located for
plugging in the uh the NCE power cap.
I've determined that eventually this
kind of central area right here is where
all the controls for the layout are
going to be. I haven't quite figured out
how all that's going to, you know, work
together yet. And I don't have any
fascia on here. So, I'm just going to
temporarily
attach the panel to the bench work right
here. And that'll give us a place to
hook up while we test everything out.
Now with the glue dry, I've taken all
the thumbtacks out
and I'm going back with my sanding block
and leveling off everything, making sure
it's all nice and smooth for track
laying. No, no bumps or high spots.
And I'm also
beveling off the edges of that sheet
cork that we used
so it'll match the rest of the road bed
nicely. But before I can lay the track,
I need to finish building the turnouts,
which are some code 70 rail soldered to
these PC circuit board ties. So, I have
to go in and add all the rest of the
ties. There's a couple of different ways
to do this as usual. Um, one would be to
I mean, the old school way would be to
put the ties down on the roaded and then
spike everything down on top of them.
That will certainly work. uh but it's
labor intensive and time consuming. So
I'm going to use sort of a modified
version of the uh the FastTracks method.
If you go on the FastTracks website, uh
they have a method for doing this where
you use some uh contact adhesive uh on
the rails and on the ties and it speeds
things up quite a bit. So, I have one of
these FastTracks templates that shows me
the proper tie positions. And uh Allan
is kind enough to provide all of the
pre-cut ties and their proper positions
for these skeleton turnout kits. So,
what I have determined that works the
best here is to uh take some double
stick tape,
put it right where those PC circuit
board ties are, and then take that
that uh turnout, turn it upside down,
align it with
the drawing,
stick it down to the tape, and then I
can go in and um attach each of the ties
individually.
This uh deviates from the FastTracks
method in that they want you to glue
this entire assembly down to the ties at
the same time. They sell a product
called uh I think it's called
Quicksticks, which is a laser cut um
laser cut run of ties for the uh for the
turnouts and you you know use the
contact adhesive, glue the whole thing
down at once. I found that I get much
better results if I do the ties one at a
time. So, that's what we're gonna do.
Take some of this Plyabond contact
adhesive. Just shook it up real good.
Not a great idea to squeeze it directly
on the backs of the rails or onto the
ties. That would be a mess.
Use a toothpick. The reason I found that
this works better is that when you try
to do the whole turnout at once, um,
some of them just aren't going to stick.
You're you're going to have high spots
and low spots. Variations creep into
these materials, no matter how hard that
we try to keep everything perfect and
the same. You know, variations do creep
in. So,
I just find that it works a lot better
to try and do this
one tie at a time. And you want to apply
the contact cement to both surfaces. And
when it starts to set up and get tacky,
that's when you can apply it to the back
of the rails. And I'm just lining it up
with the template.
Pressing down firmly. Now, these aren't
going to be as as pretty and perfect as
if you used
a FastTracks jig or something like that,
but
that's okay. I've I've looked at a lot
of narrow gauge track and uh very little
of it is pretty imperfect.
A lot of variety. I find that doing this
this way also greatly reduces the risk
of getting this goopy stuff on the
rails. which you're going to need some
acetone to remove. If you do, as always,
a word of caution, by the way, when
working with any sort of solventbased
glues or paints or anything like that,
do it in a well ventilated area. Avoid
contact with skin as much as possible.
Stuff's not good for you. Down in the
frog section right here, the only
challenge is uh working around this
pigtail of wires.
And now I'm getting down into the point
section
where these points move back and forth.
And I don't want to put any glue at all
on those moving parts.
Just on the outside stock rails. Again,
pressing down on each one of these as I
go, making sure it is well adhered. And
this is a challenging area down here
where the points close against the stock
rails. Uh just because it's been filed
back, which is great because it gives
you a really nice positive lock on each
side with with the points on the stock
rails. But there's not a lot of meat
there to attach the ties to. So, takes a
little bit of finesse.
I should be able to just pop this off
with the double stick tape.
Go.
One down and uh four more to go. And by
the way, as I build each one of these,
I'm making sure that the letter from
that particular kit goes with it so it
uh ends up in the right spot on the
layout. Okay, all the turnouts are built
and that means it's time to start laying
some track. Now, when laying track, I
believe it's always a good idea to start
with the turnouts and then cut
everything else to fit. And uh for each
one of these, I need to drill a hole
down through the cork and the plywood to
accommodate this little pigtail of wire.
About a quarter inch hole for each one.
Most important thing is to get it
located in the right spot.
Once the hole is cut, I want to carve
out a little bit more of the cork around
the top
just to make allowance
for that uh
that little lump of wiring.
Not bad. Now I need to cut a short
section of track between these two
turnouts. For all the other track that's
not a turnout on the layout, I'm using
some Micro Engineering Code 70 H3 flex
track. To hold the track in place, I'm
using some DAP Alex Plus uh silicon
coaul, which works really, really well.
Takes a little while to dry, but when it
dries, it's uh it's nice and clear. I
like to spread it out with a putty
knife. And I'm avoiding the entire
central part of the turnout here where
the moving parts are. You just want it
kind of a thin skin here. Wires. Once
again, go down through the hole.
Oh, almost forgot the rail joiners.
Using some Walther's
code 70 rail joiners.
And I'm uh not going to be soldering the
rail connections around the turnouts.
I don't find it's necessary and uh it
allows for a seasonal expansion and
contraction.
I will be soldering on the sharper
curves. However, go.
Now I'll put a little weight on that.
We'll slide these rail joiners back into
place here.
And on these longer pieces, I'll get
them into position.
One thing I like about this
microengineering track is that uh when
you when you flex it, when you bend it,
it tends to hold that position following
the center lines of the roaded. And then
I'm just going to add a couple of track
nails
to hold this until the glue dries. And
then I'll uh I'll go back and I'll
remove them. And you can see I'm not
pushing them all the way in. Only going
about that far. That way I can remove
them easily tomorrow after this is uh
had a chance to set up.
One thing you might notice that I'm not
doing is I'm not drilling a hole down
here for a switch machine to activate
the points. And that is because these
switches at the front of the layout will
be thrown by hand. That's something
special in mind for those. But the ones
back in the back there, uh, when I get
around to doing those, those will have,
uh, probably tortoise slow motion switch
machines on them. I should mention that
I'm using some Zuron flush cutting rail
nippers to uh all of these pieces to
length.
And down here where I have this
crossover,
I don't need to do any sort of special
gapping on the rails.
Like if I were using say a
electrofrog turnouts like the ones that
Pico makes, I would want to have a gap
right here or some insulated rail
joiners. But since both of these
turnouts have isolated frogs, I don't
need to worry about that. Uh it's
already gapped. This is the last of the
parallel tracks through town here.
Believe I forgot to mention
that the track centers here are two and
a half two and a quarter inches apart.
Uh, which gives you plenty of clearance
in H3.
Always sight down the track, especially
coming out of turnouts. Make sure uh
everything is lined up right.
Before I install the final turnout, I
thought I should probably let you in on
what these wires are for in the back
here. Uh there's three wires coming off
the back. Uh the central wire, the brown
one, is connected to the frog. Now,
you're probably familiar with frog
wiring like that, right? So, there's a
wire coming from the frog. It would go
to uh some sort of polarity reversing
unit on a slow motion switch machine or
a toggle switch or something like that
so that the frog can be powered when the
trains are passing through without
causing a short circuit. Well, this has
that, but it also has power wires for
the other rails as well. uh a red wire
and an orange wire and those will get
hooked up to the DCC power bus on the
for the inside and outside rail. So
absolutely every single part of this
turnout will be powered and we won't
have any stalls or anything like that.
Now for each one of these turnouts
going back and adding a little pad here
of cork
underneath the throw bar. And these are
about
5/8 of an inch wide by an inch long.
Well, now I need a way to throw the
points on the turnout, get a nice
positive lock on the stock rail, the
diverging rail, and ideally we want a
method that is also going to route power
to the frog at the same time. There are
a lot of commercial products out there
uh that you can use, including these uh
nifty tortoise slow motion switch
machines. I am going to be using these
later in the build on those turnouts on
the back side of the layout. But up here
in the front, as I mentioned earlier, I
want to be able to throw these by hand
just as if I was uh you know, a breakman
working in the yard.
Fortunately, there is a method out there
which is easy, well, relatively easy and
inexpensive, and it's to use these
electrical slide switches. This is a
double pole, double throw electrical
switch,
and this is a method that's been around
for decades. I remember reading about
this, I think it was in Model Railroader
magazine many, many years ago. I don't
know who f first came up with the idea,
but it's it's rather brilliant. Let me
show you how it works. I was able to get
a bag of about 20 of these for I think
it was like 10 12 bucks. Uh which is
very very economical. You price other
ground throw methods. And the first
thing I need to do is determine where I
want it to be.
I want to put it about 3/4 of an inch
away from this pad right here.
So, we need to create a little square
hole. That hole actually needs to be
about 5/16 by 5/8 of an inch.
And use a keyhole saw to take out the
rest of that material.
and continue to carve and file away
until the switch
fit down in there. There we go. That
should be good enough. So, you want it
to fit down in there so it's it's snug
but still removable. You just don't want
any play in it. Now, I want to drill a
hole
right to the middle of this plastic
switch.
Now I've drilled a hole down through the
PC circuit board tie
because I've got some wire here. We're
going to make a little linkage between
turnout and the slide switch. This is
some uh 0.020
music wire or spring wire if you prefer.
Put a little right angle bend
one end. And then I want to put a Zbend
in. I'm going to go out about, let's
see, about a half an inch.
So, we've got a little jog in the wire
right there. And this is important
because the length of throw on the slide
switch is longer than the length of
throw on the turnout. So, you need
something to absorb that that
difference. We need a little spring
there. Now, with the switch points all
the way over to one side or the other.
In this case, got it over here to the
left and the slide switch to match.
I'm going to mark where I need to
bend this again.
And we're going to bend that
back at a 90 degree angle to this this
uh first bend up here.
About a quarter inch to work with.
Now, this end goes to the hole in the
slide switch
and the uh little end goes in the
turnout throw bar. Again, making sure
that both are positioned on the same
side. And now I can simply move the
slide switch back and forth
to change the position of the points.
That's not the best part. The best part
is that now I can take that brown wire
coming from the frog and solder it onto
one of these center terminals. Only need
the terminals on one side of the switch.
I can ignore the other side. So the frog
wire gets soldered to the center one and
then the outer terminals go to the
different wires of the DCC bus. And so
when you throw the slide switch and move
the points, it automatically routes the
power to the frog. Now to connect all of
those feeder wires to the wiring bus,
I'm going to be using these Scotch lock
connectors. And let me just give you a
quick demo here how that works.
This fits over your 14 gauge wire. Make
sure it's all the way inside.
And then you thread
those feeders in through here, the 20 22
gauge feeders,
and then you take a pair of pliers,
and you crimp this down just like that.
Then this little lid comes over the top,
locks into place. That's why they're
called suitcase connectors because it's
it's like a little suitcase. That's all
there is to it. Fast and easy.
Well, I've got the slide switches
installed on four of the five turnouts.
You can see on this one up here, had to
add a little bit of extra ho scale real
estate to the uh to the subroad bed to
have a place to uh attach that slide
switch. And I've also found some small
brass screws to uh hold these slide
switches in place so they don't move
around. And their little slots there.
Another thing you can do is if um you
have a problem with this wire popping
out of the turnout throw bar, which does
sometimes happen, you can do what I did
and just put a little little spot of
epoxy on there. And that should hold
that in there just fine. And now I want
to drop some feeder wires down from each
of these sections of flex track down to
that DCC bus. And for that, I've got
some 22 gauge wire. So, I've got a 764s
bit in my drill, which is uh really
close to the same diameter as this wire.
And I'm going to go in and put holes on
either side of the pieces of flex track.
Try to fit it right in between the ties
there.
This is some solid core wire.
And I like to strip off about half an
inch of the insulation.
This 22 AWG wire is a little bit heavier
than what I've used in the past for
these DCC feeders, but um I find that it
works better with the suitcase
connectors. And I believe the heavier
gauge wire will do a better job carrying
that DCC signal to the locomotives. We
just push that down through. Then I want
to make a little
bend
in the wire
like that
and use the tension of the wire to hold
it up here in the in the rail webbing,
you know, right in the middle of that
that eye shape of the rail. And I can
just hit each side with a little bit of
this 60/40
rosin core lead solder.
And we pull that wire down from below.
And most of that insulation is going to
disappear down below the road bed. And
the rest will be hidden with paint and
ballast,
that kind of thing. And now those get
hooked up to the DCC bus
with those handy dandy Scotch lock
suitcase connectors.
No stripping wires, no
soldering.
Just crimp it, lock it,
and you're done. Honestly, don't know
how I got by for so long without these
things.
And now every other individual piece of
flex track that I put in between these
turnouts will get the exact same
treatment. And that way every square
inch of track on here will have full
electrical power and full DCC signal
going to it. And we won't have to rely
on things like, you know, rail joiners
and other connections to to carry that
current and to carry that signal
through. Now, there's just one more set
of connections that I need to make, and
that's for those other wires coming out
of the turnout. We already hooked up the
frogs, but there are two other wires
from each turnout that route power to
the guard rails and the points and and
things like that. And even though
they're colorcoded, it's not quite as
easy as hooking up the red to the red
wire and the black to the black wire. Uh
the way Allan has set it up, uh the
straight track uh is the yellow wire and
the divergent is red. So that's actually
going to change depending on whether
it's a right or left turnout or which
direction it's facing on the layout.
Where it hooks up to the DCC bus, which
wire it hooks up to is going to change
depending on that. And so I've drawn
myself a little wiring diagram. crude, I
know. But, uh, this will help my, uh,
limited lizard brain figure this all
out. Make sure I get it hooked up
without any short circuits. Let's see.
Let's cross over.
The red wire from this turnout connects
to the yellow wire from this turnout.
And then both of those connect to the
red wire on the DCC bus. And then vice
versa
for the black wire.
Oh, yeah.
We're getting a real bird's nest now.
And something similar down on this end.
And that is the last connection for this
part of the layout. Nothing left to do
now except to uh clean the track and uh
put a locomotive on there. See how it
runs. I've got Blackstone C19 number 345
up here on the track. Got my NCE power
cab plugged in and ready to go. All
booted up number 345 up here in the LCD
screen. I think we'll uh just give it a
simple forward and reverse to see how we
uh how we roll through these turnouts.
Now we'll switch over to the other
track.
Yeah, we go through there.
[Laughter]
Oh, I love it when a plan comes
together.
now. I'll flip the switches for the
crossover.
Let's see how she handles that
Nice.
So nice.
[Laughter]
[Music]
[Music]
Well, everything works the the way it's
supposed to. And I call that a win any
day of the week. And I just got to say
that I am super impressed with the
quality and attention to detail that
Alan Noazo puts into these customuilt
turnouts. And remember, you can get
other things besides H3. Check out his
website over at empire-trackworks.com
for all the different scales and
configurations he has available. And if
you don't see what you want, contact him
directly and chances are he can make it
happen for you. But that's going to wrap
it up for this week. I want to thank you
all so much for watching today. And you
know, I'm going to be back next week
with another project for the OM30
Goldfield and Calico layout. So, I hope
you're subscribed with those
notifications turned on so you won't
miss that. And in the meantime, you can
also follow Thunder Mesa for free on
Patreon. That's patreon.com/thundermesa
or on Instagram at thunder.ma. And check
out the resources available on the
ThunderMesa Studio website at thunder
meesa.studio.
As always, a huge thank you to our
Patreon members who help to make these
projects and these videos possible. Till
next time,
keep moving forward everybody. Adios for
now.
[Music]