Six months into the rebuild. Steady progress, layer by layer.
This update covers the latest changes across the layout—from a new platform track at Union Station to early signal system planning, fascia installation, and a field visit that reshaped how I approach bridge design. It’s less about big reveals and more about building a layout that holds together.
Featured in this update: - Union Station expansion - Manual signal development - Prototype bridge reference - Fascia shaping and installation - Design observations from a club visit
Another month in the books. The work continues!
*More Channel Info:* Welcome to N Scale Dystopia - A channel dedicated to documenting the build of a post-apocalyptic N Scale Model Railroad and Dioramas based on Union station in Toronto, Ontario, Canada.
If you found this video intriguing, consider subscribing for more content as I lean into creating more dystopian scale models. I'm figuring a lot of this out along the way, so it's always nice to have you join me on the journey and offer support, but more importantly, feedback! https://www.youtube.com/@NScaleDystopia?sub_confirmation=1
[Music]
Eight months ago, I decided I wanted to
redo this layout. I spent a couple of
months planning and then 6 months ago, I
started this brand new build. So, before
I get into this month's update, I
thought I would take a few moments to
look back and see what has been
accomplished in the last 183
days. I tore out the original layout and
got all of the walls prepped. I painted
them a basic sky blue and moved away
from the idea of a detailed background.
I did manage to salvage all of the
bridges and buildings, but scrapped
everything else. I designed and built a
scale model of the layout so I could get
an idea of the proportions and the track
work. It served as the ground truth for
everything I did from that point
forward. Decided to build far more
robust benchwork using 3/4 in good one
side plywood configured in an LG girder
formation modular solid and open grid.
And this time around I decided to use
Pico code 80 switches in combination
with Pico code 55 flex
track. On the last layout I had infrared
block detectors and Arduino control
turnouts. This time around I'm going
full analog. No block detection, no
automation. In a period of about 6
weeks, I installed all of the roaded and
track work, and it took about the same
amount of time to install all of the
wiring. I added a far more robust wiring
system, bus wires for every length of
track, feeders every 3 ft. The layout is
wired for DCC, but I am currently
running it as a twob block system in DC.
I installed all of the foam elevations
and organic scenery details, as well as
building retaining walls for the Union
Station area. I decided to design and
build a pair of custom handheld
throttles painted to match this
fictional
railroad. I finalized the structural
footprint of Union Station. Started to
install retaining walls in the Hamilton
district. So that is a brief look at how
we got to here. And so for this update,
I want to talk about um the things that
I've done in the last 30 days.
So, I was having a bit of trouble with
the symmetry of the Union Station area.
I had my six basic passenger platforms
in the middle and I had added um this
portal for two maintenance tracks which
meant that there was nothing over here.
So, I opened up the wall and I added one
more passenger platform.
[Music]
[Music]
and I decided that I would treat this as
a separate or independent corridor
outside of the overall terminus. This
new this whole platform draws from
multiple real world precedents.
Pacific Central Station in Vancouver
serves as the main terminus for both Via
Rails Canadian as well as the Amtrak
Cascades. While VIA uses the main
concourse, Amtrak arrives at a fenced
off peripheral platform designated for
border control and customs processing.
Move back to Toronto and the UP Express
has its own dedicated terminus. It's not
connected to the Union Station
concourse, but instead it runs through a
modern independent zone with
selfcheck-in and its own infrastructure.
And one adjacent detail I wanted to add
was from GO Transit's exhibition stop.
Up until very recently, there was a
small standalone ticket booth located
under the Gardener Expressway. It was a
minor structure, and now that the
structure is completely gone, I would
like to include it as a small Easter egg
on the layout.
[Music]
So I am very seriously trying to design
and install a very very primitive
signaling system. This would be a series
of manually controlled dwarf signals
that indicate the turnout position. So
no detection, no block occupancy, just
colored lights. and I want to introduce
them as a way to help make the layout
feel like you're operating it less than
being automated. I have started playing
with some ideas. I've been playing with
different LED sizes and seeing if
there's a trade-off between a result
that even though it might be oversized,
still has the look and feel of a signal
system, it's not meant to be automated.
It's meant to be 100% efficient as well
as aesthetic.
So, I decided to go visit the Burlington
Mono Railroad club layout. I paid it a
visit last year. Um, had a great time
and one of the things that they had
included in the layout was an elevated
passenger platform. So, I went back this
year. I wanted to get a second look at
this platform and I wanted to see if I
could get some ideas for how I'm going
to develop my Union Station. Well, it
turned out it was gone. Um, they'd
updated the area. They added some
interotal stuff and that stuff looked
great. Um, so unfortunately I wasn't
able to get any further details about
how they handled the design challenges
of elevating a station above some
passenger tracks. Great visit. Had a
great time. No downside. I enjoyed
looking at the trains
[Music]
[Laughter]
[Music]
running. So after that was done, I
decided to take a little walk around the
area. Outside of the building, there is
a narrow road that passes under a rail
bridge. So, this is a bridge that I
recognize from the highway, but I've
never spent any time actually underneath
it looking at the details. And I've been
trying to work on a design for the peers
to support my Bathish bridge located
right here. And I want to do a mix of
concrete and steel. And this bridge had
every single one of those details.
Having seen a prototype that I can use
as a real world example, um I'm really
confident that I'm now going to be able
to build the peers that I want and I'm
still trying to decide if the peers that
I use for the Burst Bridge will make
their way over into the Hamilton
area. So I am in the final stages of
securing the perimeter of the layout and
that is the installation of the fascia
boards. Face share was not something
that I ever got to install on the last
layout and it bothered me since day one.
It's one of those details that I want to
have in place and I want to have in
place early. It does a good job of
framing the layout and it lets me
understand where the boundaries are and
it makes it feel more finished. So, the
first thing I needed to do was add some
nailers to the end of the joists. All of
the nailers were screwed and glued into
place and the length of those nailers
was exactly the depth that I wanted on
the fascia. I cut masonite strips that
were 16 in wide and 8 ft long and then
clamped them to those nailers so that I
could create the curves around the ends
of the layout. I traced the contours of
the landscape onto the Masonite, removed
it, used a jigsaw to cut the profile,
and then reinstalled it with glue using
clamps and some temporary screws to hold
everything in place. The Union Station
area has a portal to view into the
hidden passenger stations. And so using
a hole saw and some hand tools, I
managed to cut a viewing portal into the
side of the fascia. The top edge of that
viewing portal was only a few inches
high and it snapped as soon as I
finished the cutting process. So I had
to reinforce it with a second strip of
Masonite and glued it in place. The
finished facia means now that the top
platform can be set in place and there's
now this great viewing portal to see the
trains arrive as well as the trains on
the lower level go around the ends of
the platforms. Once the glue in the
fascia was completely dry, I backed out
all of the screws and then went around
with some drywall compound to fill any
of the screw holes as well as the joints
in between the individual
panels. So, yeah, 183 days. Um, I've
lost track of time. I've made a lot of
progress on this project and I'm feeling
really good about it and I've
legitimately been having a ton of fun.
So, what's next? Well, I think I'm going
to start bouncing around the layout and
looking at things like scenery, um, sort
of civil structures in terms of how I'm
designing roads and bridges. I really
want to get the fascia finished. And so,
right now, um, I'm having some
discussions with some people about what
color to paint it. I've collected lots
of things to decorate the fascia with.
Right now, I'm leaning towards trying to
create something that feels like um a
forgotten cold war Soviet era um
machine. So, things are moving forward.
Thank you very much for tuning in and
joining me on the journey. And uh I'll
see you next time.
[Music]
[Music]