*Major Milestone! First Trains Running on the New Layout*
Big Progress Update! After nearly six months of rebuilding from the ground up, my new layout is finally operational! In this video, I take you through the wiring process, how I set up DC operation with future DCC conversion in mind, and lessons learned along the way.
Key Topics Covered:
- Why I tore out my old layout and started over
- How I wired the layout for both DC & DCC compatibility
- Troubleshooting electrical connections for reliable operation
- The first successful train run on the Union Harbor Express!
The journey has been long, but the results speak for themselves—smooth track work, reliable power, and exciting plans for the next steps! Up next: scenery, fascia, and city platforms.
*More Channel Info:*
Welcome to N Scale Dystopia - A channel dedicated to documenting the build of a post-apocalyptic N Scale Model Railroad and Dioramas based on Union Station in Toronto, Ontario, Canada.
#nscale #ModelRailroad #DystopianModeling
If you found this video intriguing, consider subscribing for more content as I lean into creating more dystopian scale models. I'm figuring a lot of this out along the way, so it's always nice to have you join me on the journey and offer support, but more importantly, feedback! https://www.youtube.com/@NScaleDystopia?sub_confirmation=1
[Music]
it is very early in the morning here and
I had a milestone moment yesterday I
finally got some trains running I was
looking back through my Instagram
account and I couldn't believe that it's
almost been 6 months since I tore out
the original layout and started
everything over to create this layout so
for anyone who's seeing this video for
the first time um I had an old layout in
this exact location and that layout had
a number of problems which prompted me
to completely rip everything out and
start again I designed a new layout and
shared the maette of what that layout
was going to look like I spent several
months developing the bench workor and
then since then I've spent the majority
of my time installing all of the track
so the only thing between me and a
running layout was the wiring and I will
admit that that took a lot more time
than I thought it was going to so I
thought it was worth sharing the
experience I had with wiring and the
approach that I've taken for this layout
and one of the unique aspects of how
I've wired this layout is that it's been
wired for DCC but in the short term it's
going to be running as a DC layout the
type of equipment I collect um a lot of
times can't be bought new and so there
is always some affordable DC options out
there so I've got a great collection of
locomotives and passenger cars but
almost all all of them are DC and so the
process of upgrading them is costly and
timec consuming so for the time being
everything's being run as a DC layout so
that I can enjoy that equipment but it's
done so knowing that as I convert these
cars the layout will be able to be
converted as well so a while back I
posted a video explaining why I was
tearing out the layout and the principal
reason was reliability and reliability
had a lot to do with the fact that there
was some expansion and contraction with
my old l out and that meant that the
track work continued to struggle and I
would have warping track Etc and on the
old layout I had soldered every single
rail joint which meant that the layout
didn't have a lot of room to move with
expansion and contraction and so for
this layout I made the decision that the
only solder joints would be on any of
the curved sections of Flex track
everything else that was straight or
near straight was only going to be rail
jointers because most of the rail joints
are not soldered it means that the
connectivity between rails um is
questionable and so I needed to address
that with the
wiring so knowing that electrical
connectivity was going to be my number
one priority I set a guideline that
every length of track um needed to have
feeder wires installed so every section
of track that was over roughly a foot
long had a pair of feeder wires added
and so for feeder wires I used a 20
gauge wire um stranded 20 gauge wire
that was soldered to to the underside of
every length of
rail and I did that for the entire
layout before I got to any other wiring
so every turnout and every length of
track went down with feeder wires
installed before I even considered the
next step so the track laying was
probably done about 6 weeks ago and the
next step was to start on installing bus
wires so the minor difference between
what I'm doing here and what you may
traditionally do on a DCC wired layout
is that I was installing a bus wire for
two separate blocks and so I have a
double track Mainline and I've
designated those as the eastbound
running track and the westbound running
track and so while the layout is being
run as a DC layout I have those two
tracks separated into two separate power
blocks and for that I'm using a 14 gauge
stranded wire I went around the
perimeter of the layout and I either
drilled holes or fished the wire through
um Gap in the Riser so that it followed
the entire main line as well as the
sidings so with the bus wires run all
around the perimeter of the layout The
Next Step was to connect the feeder
wires to the bus wires and for that I
used two different types of quick splice
snap connectors so the first style of
connector I used is one that is
detachable it's in two pieces and the
first part um splices onto the bus wire
you squeeze it down it cuts into the
wire and then locks shut with a little
clip and the second part of it attaches
to the feeder wire you strip the wire
and then you pinch what I will call the
paddle onto that so now this the paddle
can be inserted into the socket which is
attached to the bus wire and so that way
you can connect and disconnect this if
you need to the second style of
connector that I used is not detachable
it is similar to sort of a suitcase
connector it's again a splice connector
the bus wire runs all the way through
and then you add the feeder wire to to
um the second Channel you then squeeze
what we'll call the splice blade through
both of the wires and then snap the
connector shut to complete um the
connection that leaves us with a
removable connector and a non- removable
connector so along the yards where I had
multiple feeder wires coming off of a
staging track um I simply used this sort
of suitcase style because I knew that I
wouldn't be making any changes and for
some a number of the other connections
where let's say there was
um I join in the bench work or I knew I
would be modifying the wiring in time I
used the removable connector so because
I have an eastbound block and a
westbound block I needed to make sure um
that I keep those two power blocks very
separate and because all the wire looks
the same I decided that I would use
different colored zip ties um white
represented Westbound and black
represented the eastbound lines and so
as I worked my way through the layout
every time I had a successful bus
connection I would then Mark it with a
zip tie so that I understood which was
my westbound wiring and which was my
eastbound
wiring so the bus wire is installed I'm
going along and I'm connecting each of
the feeder wires and it's going well
except I discovered that I had made a
mistake in four places along the layout
I think I connected about 50 or 60 pairs
of feeder wires to the track and in four
separate cases I accidentally reversed
the positive and negative or the red and
the black feeder wires which meant that
as I was going along under the layout
and hooking up the quick splice
connectors in more than one place the
reverse wires meant that I had crossed
the connections so from that point
forward what I decided to do was pull
out my multimeter and check for
continuity between the opposing rails so
if you're not familiar with a continuity
Checker it's a fairly straightforward
thing when you make any contact between
um the individual
probes so what should happen as you're
attaching the feeder wires is that if
you touch the individual rails there
should be no continuity right so the two
rails should not be connected in any way
and so this was how I was able to
discover that I had made a mistake I put
the two probes against the rails and I
heard a beep I was able to find my
mistake and luckily I had used one of
the removable connectors so I was able
to switch the wires and correct the
problem now from that point forward I
went through the process of every time I
connected a pair of feeder wires I would
pop my head up above the layout put the
two probes against the rails and if no
noise came out it meant that I was good
to go so I should mention that as I was
working my way around the layout and
connecting the feeder wires to the bus
line um I would do so on some of the
sidings and again because the layout
will be operated as a DC layout um in
the near future before converting it to
a DCC layout I need to be able to
electrically isolate individual sidings
or passing tracks and the easiest way
for me to do that is to interrupt the
circuit and put in a single pole single
throw switch and so to make that a lot
easier on myself later each of the
feeder wires that were connected to a
siding that would need to be
electrically isolated I added a terminal
connector to it the terminal connector
allows me to
disconnect the wires on that feeder and
then add the single pull single throw
switch so that I can then electrically
isolate that circuit but in order to get
the layout running I left each of these
connectors joined so that I can run some
trains so the feeder wires are connected
to the bus the individual feeder wires
have terminal joiners in them for any
one of the isolated sidings so the East
and Westbound portions of the layout all
of the bus wires arrive in a centralized
electrical terminal we'll call it where
then I added these terminal strips
divided into the two separate blocks and
divided into the two separate polarities
and all of the wires came in and then
were joined along that terminal strip so
with all of the bus wires into the
terminals I did have the option to just
connect one of my old MRC power packs
and run some trains but I've decided to
make one additional change to the way
I'm putting this layout together and
that is I've added a pair of small
handheld throttles so these little
throttles replace um the very aable
speed controls on your MRC throttles and
use the AC power the accessory power and
convert it into DC pulse they have a
very sensitive real stat that allows for
very minor speed adjustments and they
have a built-in momentum control and so
assembling this first handheld unit was
the last step before I could run some
trains and I will tell you that I am
thrilled with these little units they
make running the trains a lot more fun
and allow to move around the layout and
they were very very affordable so in the
intrum while I'm waiting to convert the
layout to DCC I have tiny effective
responsive handheld throttles that allow
me to move amongst the layout and allow
me to do switching operations with
throttle in hand and my turnout control
in front of me I am so impressed with
these little throttles um I am going to
be not only customizing them but I am
going to put them together and I will do
a product review of them because I do
know there are people out there that
still work DC Cc or maybe you want to
make an exhibition layout and this might
be an excellent choice for
you so it's
alive the track work is almost Flawless
and electrically all of the trains that
I've tested so far creep at very slow
speeds without any sort of hiccups or
power interruptions it has felt like a
very long journey to get to this point
but it has paid off that I've tried to
be as thorough as possible when building
the layout up to this point so what's
next next well the way that I see it I
need to add a bit of Scenic contouring
around the layout so that I can get to
adding the fascia and once the fascia is
installed then I can add all of the
switches to control the sidings so the
next major project I need to take care
of is some scenery Contours fasia and
finalize the wiring as well as I need to
start developing the two City platforms
that I can start building the structures
on top of and I really do need to start
mocking up where the Bridges and
highways are going to go so I am excited
because I think in the coming weeks and
months you're going to see a lot more
progress on the layout as the hardest
part is now basically done so I think
we'll stop it here um in the meantime
though stick around for a few more
moments as you get to watch the
inaugural run of the first passenger
train on the union Harbor Express make
its way from West Harbor to Aldershot to
Union Station again thanks for tuning in
and I'll see you next time
[Music]
[Music]
[Music]