Hello friends, welcome all of you to Knowledge Au Channel.
Let's Learn Together. In today's
video, we are going to see how to calculate the shuttering of slab and
concrete quantity.
Today we will see how to calculate shuttering of slab and
concrete quantity of slub and
will see as per the drawing. First of all do
your measurement serial number
description unit number length breath depth
quantity and remarks after that slab
shuttering quantity now slab shuttering
quantity we will see the drawing there is a school
building its plan is the first follow our
first to find out the quantity of slab What will we do? We will calculate the quantity of this portion,
then we will calculate the
quantity of the middle portion, then we will
calculate this and then we will calculate the last one,
so first of all we will
calculate the total from here a2 p a2 p, in this
we will consider the beam or value of 230.
Look at the calculation,
how much is the length of a number 39.6 value 23
ma means the total length is
3965 in this min 23 min 23 is done on both the sides, this is why
we are calculating the shuttering,
after that how much is b 6.17 min min means
y B 6.17 Ma 23 Min
23 and death thickness is also considered,
what will be the quantity Numbers in Length in
Bread
in Numbers into Length in Bread, this means
this number is
3 5.17
377 square meter Numbers in Length in Bread
23 Square Meter in it Slub Side, we did
not consider that there is a beam on the side,
so it comes in the shuttering of the beam, now the
second one is from to fo, now to fo means this is the
middle portion to fo and its dimension is
like this
39.6 -23
mine means this is the side portion. This side's
own
39.1
1.84 means 2.07
-1 This one's
39 19 means this 3965 -23 -23 And this side's come
2.07 -23 Because it went here, so I
caught a single Only
2.7 and its sl
So what will be the shuttering area of SL?
Numbers in length B
39.1 1.45 E 7.31 square
meter After that we will take the dimension of classroom classroom Ir classroom
What is the dimension of classroom
6.17
in Y 1.61 in Y 2.27 Y
3.89
-115 in Y dimension
6.17 Y later Y 1.61 P 2.27 P 3.89 P
minus its half length so its 11 minus
depth is 150 so how much is it
6.17 7.66 47.6 Meter Computer Lab
How is it in the computer lab Look here
Computer
lab is the dimension
How is it in the computer lab 1 In 5
317, then
how much of it? The cutter in 47 5
mine
mine
went here and this came 3.17
mine 3 mine
in in 4.77 3.55 e 1457 swar meter. Now
how to get its concrete quantity.
See the same dimension above. While taking out the concrete,
we first slub out two. While considering out,
keep in mind that while taking out concrete,
we consider slub eight to out, so here it
is 39.6 and this is 6.17
50 e numbers in length in breath in depth 1
39.6
6.17 after this
324 34 means
this is also 3965 n
2.07
in these numbers Length, depth, quantity of slab,
3 classrooms,
how much size of the classroom is 6.17
775, as shown here, 1.61 2.27 3
895,
according to this dimension, the size of computer lab will be 155 = 7.20
5 * 3.17 * 155 1 * 5 * 3.17 *
155. = 2.38 cubic meters While calculating the shuttering quantity of the slab, if the
beam is on the side, then the
thickness of the beam has to be taken minus the internal slab
and while calculating the concrete quantity, the
out to out dimension of the slab has to be taken
and while calculating the quantity of the beam, the distance of the
beam has to be taken. The
inner side has to be taken by subtracting the slab thickness, the outer side has to be taken
complete and
while calculating the quantity of concrete beam, the
quantity of beam has to be calculated by subtracting the thickness of the slab.
Keep this in mind. So friends, here is
our today's video. How did you like the video today? If
you like then please comment
and if you are watching my channel for the first time
then please subscribe to my channel
and press the bell icon on the side
so that you can get notification of all my upcoming videos.
Thank you.