How To Calculate Quantity Of PCC, Footing & Column II Shuttering II Concreting II Estimation II

Knowledge Hub
101 followers
3 Video Views·May 24, 2024
Hello friends, welcome to Knowledge Au Channel.
Let's Learn Together.
In today's video, we are going to see how to calculate the quantity
of PCC, column footing, shuttering of the column
and concrete as per the drawing.
How to calculate the quantity of PCC? We
will talk about, according to the drawing,
here is a chart of PCC:
Putting Type Column Numbers RCC
Putting Size Depth f1 c1 f2 c2 1350 ba
1650 1350 ba
small depth is 230 and b is big depth
450 so what are we? Now
how will we calculate the quantity? First of all there is
a number of shuttering or serial number
description unit numbers length bread depth
quantity remarks in this meter one number
and now 1.35 is given in it.
Similarly here, 1.65 here, the
offset of the side is Pv Pv and depth is Pv,
so the quantity has come,
Apni 2 in means two numbers, this is D number, not one
number into L Ps B means 1.55 P 1.85
in depth easy means given here. Heaven
is in numbers in elps b bucket k in e 68
meter square now we have to find same A2 also if it is
same dimension then how to find kick of same PCC length is
1.55 breadth is 1.5 and depth is p to y formula
what aga numbers in A in B
Nadi E
1 * 1.55 * 1.85 * 1 = 29 A K This is a simple
formula, numbers into length in breadth in
depth E is equal to quantity will
come in cubic meters, it is very easy to find out the
quantity of PCC, just
look at the drawing and
By looking at the offset, how much offset it is and there is a schedule, by
adding that offset according to the schedule,
we can calculate the length bread,
after that the depth is given, accordingly we
can calculate the quantity of concrete for shuttering, today we will calculate the column.
How to calculate shuttering and concrete quantity of footings and columns
Who will see the drawing According to this,
first of all we
will make measurement sheet Serial number Description
Unit numbers Length Bread depth Quantity
and Remarks Now column footing shuttering
quantity For this we will have to
refer the drawing A drawing is given here,
see the column numbers, fitting size is
given, thickness is given c1 c4 c12, the
fitting is 1300 by 1700, thickness is 450,
see here c1 c4 c1 is three numbers, 1300 by 1700,
450 is the depth and its
See how is the drawing of the fitting. It is a simple rectangular
fitting,
so how will we calculate the quantity? The
numbers are three numbers, right? 3 * 2 means 2 *
l b means 1.3 + 1.7 in depth 45 = 8.1
square meter. Next is c2 c3 c2.
What is the dimension of c3
1400 by 1800 and what is the thickness and how much depth is
500 then accordingly how much are these two numbers
1400 by 1800 500 Same formula is Numbers
in 2 These numbers in
2 in bucket 1.5 P 1.4 P 1.8 in According
to this The quantity of shuttering is equal to that of c5 is
1.4 times
1.8 and that of c6 is 1.3 times 1.7 and that of c7 and c is
1.5 times
1.8 same. Here we have taken the dimension and
accordingly calculated the quantity of shuttering by applying the same formula.
Now
how to calculate the quantity of concrete. In this, all the
numbers are same, length, breath, death are same, only
what to do in the formula is numbers
into length, into
depth, quantity will come in two meters, like there are
three numbers, 1 3 * 1.3 * 1.7 * 45 = 2.98
cubic meters, c2 c3. Similarly,
quantity of c5, c6, c7 is also in cubic meter.
Now we will see about the columns.
See what is the size of column given in the drawing of column c1, c2, c4 and c12.
From fitting to first loop, everything is
230 by 600. Keep this in mind, there
are three columns, 230, 600 and diameter meter.
We considered the height, so
how to calculate the diameter and quantity. The
numbers in
223 p 6 *
2.5 are 12.4
square meters of shuttering. Done, c2 c3
is somewhere 23.6, its quantity according to 2.5 meter is
2 * 223 p 6 2.5
8.30,
we will also calculate c5 c67 a14 with the same formula,
now how to calculate its concrete quantity,
it has the same numbers L Bd
Sub. The only formula is the same, the numbers that will come are
3 * 23 * 6 * 2.5 = 1.04 cubic meters, c2
c3 is also equal to 2 * 23 * 6 * 2.5 = 669
cubic meters, after this, the cubic meters of c5 c6 c7 c14 are also the
same according to the formula.
While calculating the concrete quantity of the column, we have to
consider floor to floor. Keep this in mind that there should be
shuttering and concrete. If we want to see floor to
floor, then we should take shuttering only as far as we
can and concrete should be complete
floor to floor. It
is easy to understand, if you see the drawing then you will get the
idea, so friends, here is our
today's video, how did you like today's video,
please do comment, if you like it, like it
and if you are watching my channel for the first time
then Please subscribe my channel and
press the bell icon on the side so that
you can get notification of all my videos.
Thank you.