1.2K Video Views·Feb 29, 2024 #elonmusk #greatspacex #spacex Odysseus Moon Lander Broken Leg with new images. SpaceX B10&S28 final Stack is ready!
===
#elonmusk #greatspacex #elonmusk #spacex #nasa #starship
==
Advertisers who want to place ads on our channel, please contact the email manager: [email protected]
===
SpaceX Starship SN
Be the first to sponsor us Thank you.
https://www.patreon.com/GreatspaceX?fan_landing=true
===
Odysseus Moon Lander Broken Leg with new images. SpaceX B10&S28 final Stack is ready!
The preparations for Starship Flight 3 are definitely intensifying! It's exciting to see Booster B10 returning to the Launch Pad after undergoing fixes at the Production Site. The road closure schedule provided by Cameron County signaled this significant event, and the smooth transportation process of B10 back to the Launch Pad is a promising sign. With Chopstick's assistance, B10 was securely positioned, ready for the upcoming tests, including the crucial Wet Dress Rehearsal.
However, the completion of the Wet Dress Rehearsal test requires the presence of S28 alongside B10. Although work around S28 is underway, including the positioning of its transport stand and the readiness of the Maarvin crane, S28 has yet to be lifted onto the transport stand. Nonetheless, the delivery of two large cryogenic methane tanks to the Launch Site further emphasizes the ongoing preparations for the upcoming test.
With each step forward, the anticipation for Starship Flight 3 continues to build, and it's evident that the team is diligently working towards ensuring the success of this milestone mission.
The announcement of the new road closure schedule for February 29 certainly raises anticipation for the next steps in the preparations for Starship Flight 3. With Booster B10 already positioned on the launch pad, the focus now shifts to S28.
There are indeed two possibilities for the movement of S28. One possibility is that it will be transported directly to the Launch Pad to be stacked with B10, indicating readiness for the Wet Dress Rehearsal test. Alternatively, S28 could be moved to the Production Site for potential fixes related to previous Wet Dress Rehearsal tests.
Both possibilities hold significance, and the outcome will depend on various factors, including the readiness of S28 and any identified issues that may need to be addressed before proceeding with further tests.
----
We use images and content in accordance with the YouTube Fair Use copyright guidelines: https://www.youtube.com/intl/en/about/copyright/fair-use/
Any questions about copyright please send us via Gmail: [email protected]
To be resolved, thank you.
the preparations for Starship flight 3
are definitely intensifying it's
exciting to see booster B10 returning to
the Launchpad after undergoing fixes at
the production site the road closure
schedule provided by Cameron County
signaled this significant event and the
smooth Transportation process of the B10
back to the Launchpad is a promising
development with the Chopsticks
assistance B 10 was securely positioned
ready for the upcoming tests including
the crucial wet dress rehearsal however
the completion of the wet dress
rehearsal test requires the presence of
s28 alongside B10 although work around
s28 is underway including the
positioning of its transport stand and
the Readiness of the Marvin crane s28
has yet to be lifted onto the transport
stand nonetheless the delivery of two
large cryogenic methane tanks to the
launch site further emphasizes the
ongoing preparations for the upcoming
test with each step forward the
anticipation for Starship flight 3
continues to build and it's evident that
the team is diligently working towards
ensuring the success of this Milestone
Mission the announcement of the new road
closure schedule for February 29th
certainly adds to the hype with booster
B10 already positioned on the Launchpad
the focus now shifts to s28 there are
indeed two possibilities for the
movement of s28 one possibility is that
it will be transported directly to the
Launchpad to be stacked with B10
indicating Readiness for the wet
rehearsal test alternatively s28 could
be moved to the production side for
potential fixes related to previous wet
dress rehearsal tests both possibilities
hold significance and the outcome will
depend on various factors including the
Readiness of s28 and any identified
issues that may need to be addressed
before proceeding with further tests it
is an exciting time indeed as we await
further developments but the question of
whether s 28 will undergo a static fire
test remains uncertain at this point
despite being rolled to the test pad
last week and undergoing a spin Prime on
February 28th it has yet to proceed with
a static fire this test is crucial for
ensuring flight safety and it's possible
that s28 may return to the test stand
for this purpose before the scheduled
launch date the pace of preparations is
expected to accelerate rapidly with the
FAA closing the investigation into the
if2 mishap on February 26th signaling
progress towards if3 and environmental
assessments conducted by other groups at
Starbase SpaceX is likely in the final
stages of completing necessary
assessments Elon musk's estimates
suggest that if3 could launch in the
second week of March or mid-march
pending official launch approval from
the FAA given the current rapid progress
this approval could come soon possibly
even in the first days of March despite
the busy developments with Starship at
Star base attention in the Aerospace
Community is also focused on the im1 one
lunar Mission though expectations that
im1 would conclude within the next few
days intuitive machines continues to
provide updates on the mission including
images they recently mentioned that ad
deus's Landing strut fulfilled its
primary function by absorbing the
initial contact with the lunar surface
preserving the mission's Integrity
furthermore the cryogenic methane and
liquid oxygen fuel engine systems are
still functioning properly however there
was a surprising development when an
updated image revealed that the Lander
had a broken leg during a press briefing
on February 28th intuitive machine CEO
and co-founder Steve altimus provided
insights into the im1 lunar Mission
stating and so we hit harder um and sort
of skidded along the way we the landing
gear took the bulk of the load and we
broke one or two possibly landing gear
this information was confirmed by an
image shared on NASA's X page adicus
initially sat upright for approximately
2 seconds on terrain with a roughly 12°
slope however it began tipping over and
eventually came to a rest at about a 30°
angle from the horizontal additionally
it is slightly propped off the ground by
one of its tanks or other pieces of
equipment despite the less than ideal
orientation of a discus following its
Landing intuitive machines adapted to
the situation by utilizing the
spacecraft's low gain antennas to
transmit imagery and scientific data
back to Earth however the landing
orientation posed challenges such as
preventing the use of the High Gain
antenna and casting Shadows on the
uppermost solar array furthermore it was
revealed that there was no altimetry
data from a Laser Rangefinder indicating
that the Lander descended just short of
its intended Landing sight adding up
approximately 1 and 1 12 km away in an
area with higher terrain according to
Steve altimus CEO and co-founder of
intuitive machines the Lander came in
with more downward and horizontal
velocity than expected due to an
overestimation of its altitude above the
lunar surface this stands in contrast to
the previous image updates which
depicted a smooth Landing process
without any indication of a crash
confirmation of the situation and
further insights may be provided once
eagle cam an important payload transmits
new images altimus mentioned that eagle
cam was deployed on February 28th and is
currently positioned approximately 13 ft
or 4 M from adicus however there has
been no imagery received from the
instrument yet as the eagle cam team is
troubleshooting the issue in terms of
the general situation the Lander likely
has only a few more days of operation
left the impending lunar Knights pose a
significant risk potentially causing
damage to the Lander's electronics and
batteries each lunar night lasts roughly
2 weeks due to the moon's approximately
27-day rotation period so time is
limited for adicus to continue its
operations beyond the problems with the
Lander NASA still declared I am1 a
successful Mission during the press
conference both both NASA and intuitive
machines officials confirmed the
reception of data from nearly all the
payloads aboard the Nova SE Lander AKA
adicus which successfully touched down
near malipur a crater in the South polar
regions of the Moon 6 days earlier
Ultimus expressed satisfaction with the
mission's outcomes stating we had some
very high level mission objectives was
to touchdown Softly on the surface of
the Moon softly and safely and return
scientific data
um to our customers the two primary
objectives and both of those objectives
are met so in our mind this is an
unqualified success NASA reported
receiving data from all five of its
active payloads on the im1 mission with
some operating during transit to the
moon and others providing data after
landing a sixth payload a laser retro
reflector will undergo testing in the
coming months Joel Kars Deputy associate
administrator for exploration and NASA's
science Mission directorate
characterized Ed the soft touchdown on
the moon as a significant achievement
referring to the mission as a Pathfinder
or a flight test NASA administrator Bill
Nelson echoed this sentiment affirming
adicus is a success from NASA's point of
view despite facing numerous challenges
intuitive machines remains open to the
possibility of Reviving adicus
affectionately dubbed ODI after the two-
we lunar KN Executives stated their
intention to attempt communication with
the Lander in 2 to 3 weeks provided its
batteries and electronics withstand the
harsh conditions colder than they were
designed for this scenario is not
unprecedented as Japan's slim Lander
recently reestablished contact on
February 25th after surviving the lunar
Knight despite not being designed for
such conditions Ultimus expressed
optimism stating we're in a position
where why not try you know with no odds
on it let's let's see what happens Sue
letterer project scientist for NASA's
commercial lunar payload Services
Program or Eclipse echoed this sentiment
saying and he's a grappy little dude
yeah I would not I would not bet against
have confidence in od at this point the
Journey of im1 is indeed intriguing and
unpredictable hopefully the mission will
continue operating for as long as
possible Paving the way for the eventual
return of humans to the Moon stay tuned
for further updates from NASA and intui
machines only on great SpaceX well folks
that's about it for today's episode
thank you so much for tuning in and as
always this is Kevin and until next time
keep looking
up