Highline Rigging Example - Cabo San Lucas, Mexico

HowNOT2
100 followers
5 Video Views·Apr 26, 2017
Check out how we rigged 3 all natural lines in Cabo San Lucas, Mexico.
Thank team: Andy Lewis, Scott Rogers, Kim Weglin, Alex Mason, Carly McGee, and Annelise Temple.
Photo credits: Scott Roger, Wingate Motion.
Check out how to make spansets adjustable on the Slack science video here: https://www.youtube.com/watch?v=0LMndekqu_g
Sorry SlacklifeBC for losing your coolest hat!
You want to see how we rigged some super sketchy lines in Mexico?
Check out this episode of How Not to Highline.
Hi, I'm Ryan Jinks, and welcome to my garage.
We just came home from Mexico, and we
rigged some sketchy highlines while we were there.
A group of us went down there to help support Andy Lewis
during his speaking engagement.
So during the presentation, we set up a highline.
And on our free time, we set up two different lines
right along the ocean.
So I took some video clips of the anchors
while we were highlining so I could show you
how we rigged three all-natural lines.
Let's first go over how we set up the midline
at the presentation.
So naturally, the building owner doesn't
want any holes in their floor or their walls,
so we had to rig on two scissor lifts.
And the tricky part of the setup is
we couldn't set up the scissor lifts long ways,
but we had to put them sideways so they'd
stay close to the walls.
So obviously, the biggest concern
is that we would pull the scissor lifts over,
creating quite the show.
So let's pretend for a minute that I'm a scissor lift.
The stage riggers attach to the structural beams
in the open ceiling and attaching to the bottom frame
near the wheels, creating a scissor lift harness,
preventing them from being pulled towards each other.
So they attach a truck strap and a ratchet,
much like a trick line, to the base of the scissor lift.
That was attached to a cable.
And that cable was attached to a span set,
which went over the edge of the base,
not the edge of the railing.
And that span set was connected
to a structural beam in the ceiling.
So the main idea behind our anchor
was to have two span sets of the same length,
girth hitched, to the corner of our scissor lift.
The problem was we had to have our midline
in a very specific spot between the trick line
and the edge of the stage.
So we did the adjustment span set trick
to make it the length that we wanted.
What you do is you put a cross in it,
reach behind the cross, take this,
and now you have these two wings.
Make sure they're even, and now it's shorter.
It's also very adjustable.
If you pull this in like this,
you can make it whatever length that you want.
Gary has a great slack science video
on how to make your span sets adjustable,
and that link will be in the description below.
So we were able to adjust our master point
over about a foot, which made all the difference.
But by putting this way,
it does put the majority of the force
on this side of the scissor lift, which is not ideal.
And please ignore this.
It had nothing to do with the way we rigged.
That's not how you rig.
I just didn't have a six foot span set
to play with right here.
Anyways, you can see here that we used this span set,
girth hitched, around the corner of the scissor lift.
And on our other span set, you can see how we adjusted it.
Now the main line was put into a web lock like normal,
and the backup line was put in with a double cross knot.
We're not even quite sure why we had a backup line,
because it was too low to matter,
and Andy wasn't even tying into it.
And of course, I told them I had to test it out
to make sure it wouldn't adjust.
But honestly, I just wanted to walk on it.
So after working, we went back to our hotel,
which happened to be the only hotel in all of Cabo
that is built on a cliff where we could rig a high line.
Welcome, or bienvenido, a Mexico.
Is that how you say it?
Speaking of Mexico, a hotel security guard came down
in the middle of our rigging and said,
no bueno, and we had to take our stuff down.
Of course, he only spoke Spanish,
which made things interesting.
So after we debated with him for a while in Spanglish,
he went and got a supervisor.
The supervisor was cool.
He said we could do it as long as we signed a waiver.
So he handed us a blank piece of paper,
which we had to sign and say we wanted to the hotel.
So Andy thought it'd be a good idea
to name the line John Hancock.
Anyways, we went back at it,
and Scott Rogers and I rigged the tension side.
There were no horns or boulders or anything for us to wrap,
so we ended up wrapping the entire rock over there.
Used four of my 30 to 35 foot length,
eight millimeter Dyneema core static rope.
After we lassoed the entire top of the rock,
we made sure we velcroed the shit out of it.
And it worked out best for us
to just manually equalize our ropes
by just adjusting our fisherman knots a few times.
And in order to get our master point
exactly where we wanted it, we just tied some figure eights.
And then we had a four independent strand master point,
which we put on our two web blocks,
and then we padded the first two feet of our high line,
which had the most abrasion risk.
And kudos to Scott Rogers for his idea
on how to stabilize the master point
by using a cam on either side.
We attached the master point to the cams
with some whoopee slings,
which held it down onto our haul bag,
which was our padding for our master point.
So the only redundancy we really had
was the fact that the rock was wrapped four times.
But those cams cannot be considered a backup
in case the rope broke,
because they would have been yanked
in a direction that wasn't intended.
And by using the carabiners the way we did,
we didn't attach it to the master point
with the intention of it being a backup,
but rather just a stabilizer.
Now let's go over the side Andy did, the static side.
So Andy found some good quality rock
and built a cam cluster.
He took our 50 meter static rope
and equalized all five cams and made a master point.
He extended that master point
by using the second half of the 50 meter.
We didn't have any shackles with us,
so he ended up using two opposing aluminum carabiners.
He also built a second cam cluster
and extended that with some 30 foot static ropes he had.
And then he used the tail of the master point
to tie a bullet around a horn.
So he more or less had three independent anchors
that all came into one master point.
Now a problem with a master point like this
is it's hard to know which way it'll be orientated
after the line is tensioned.
So it kind of looks like a mess, but it's just fine.
Now it would have been nice to have two more shackles
and a hell of a lot more padding,
but for what Andy had, he did pretty good.
Now let me show you how not to highline.
I don't recommend when you're drunk
and it's dark to go highlining.
You can fall scrambling up the rock to your highline
or not tie in properly, or even worse,
forget to tighten your hat.
Go baby!
Even with a loss like that,
we still had the courage to go rig another highline.
So then we transitioned to the Somar Hotel,
which just happened to be the only other hotel
that was within 1,000 feet of another highline spot.
But the problem was the rock quality had no quality
and it was breaking off in our hands.
And the other problem is anything that was big enough to wrap
ended up being hollow underneath.
So further down, we found some rock that was mas or menos
and we threw in some camps
and we equalized those with a static rope
and tied a figure eight to prevent shock loading.
And we also found another half-assed rock to wrap
to give us a third independent point.
So we took the lower raft rock
and manually equalized it with a cam anchor
through a series of knots and adding beaners
and other things that really aren't ideal.
So we extended that anchor with a span set
to our main raft rock.
And those three independent anchors all came together
to make a master point.
It wasn't perfectly equalized,
but its redundancy was super good enough.
Luckily, we had a shackle with us
because that level of trial loading
would have been bad for a carabiner.
Now the problem was our master point
was 10 or 15 feet away from where it needed to be.
So we were able to take two of our static ropes
and make a four-strand extension for our master point.
We were also able to add two more strands of redundancy
to our master point extension
with the very end of our webbing.
Now the sketchiest part was our master point
was on a sloping edge,
and the only thing holding it up
was this thin, hollow flake.
In order to keep most of the pressure off the flake,
we put two whoopee slings around a horn
to compensate for the lack of padding
and attached it to the master point.
And this master point also got twisted when we tightened it,
so our line wasn't perfectly flat.
With the bad rock quality,
the lack of padding,
and the high chance the master point
would slide down the hill,
we agreed that it was a no-whip line.
Now I don't have any video of Andy's side,
but amazingly, he rigged something super good enough
with very limited resources.
So after that adventure,
we all agreed it should be named Super Good Enough.
And just as a disclaimer,
you really shouldn't be highlining on anchors
you can't whip on.
And another disclaimer,
apparently that rock formation is on the National Preserve.
We knew the arch was off limits,
but we didn't know that was.
So after a military helicopter did a flyby,
and no one came to say anything,
we thought it was fine.
And until later that day after we'd be rigged
and we're chilling in our hotel room,
the hotel manager came and knocked on our door.
And he said the police came to arrest us,
but he wouldn't give them our room number
and said he took care of it.
So if you're in Cabo San Lucas,
make sure you don't have the audacity
of putting a rope horizontal.
Rigging on Super Good Enough natural anchors
can be dangerous,
therefore, you shouldn't highline.
If you don't be a dummy and go rig your first highline,
especially in a foreign country on a Federal Preserve,
without going with somebody who knows what they're doing.
But until then, check out these other videos
and don't forget to subscribe.
