Highlines - Rigging Efficiently

HowNOT2
100 followers
2 Video Views·Nov 12, 2016
Tips and Tricks to rigging highlines fast! Spend more time highlining and less time rigging... do as much prep work at home as possible!
What are the tips and tricks for rigging highlines efficiently?
Check it out on this episode of How Not to Highline.
Hi I'm Ryan Jinks and welcome to my garage. Today we're going to show you how to rig
highlines efficiently. We're going to talk about pre-taping, pre-bagging,
pre-weblocking, and pre-planking, and other tips and tricks during your rigging process.
Some people like rigging more than others. Personally I like rigging,
but I don't want anything under 200 feet to take me more than an hour.
It's not necessary and I'd really rather highline.
One of the key components here is having a good highlining partner.
If you have somebody not showing up on time or bringing what they're supposed to bring,
having a good plan, which is the next step, is all for nothing.
So it used to take me three or four hours to rig a 100 foot highline and then I heard of people
rigging two to three hundred foot highlines in under an hour. I was like, how are they doing
that? I was working really fast when I was rigging. So rigging time is considered the time that you
start rigging to the time you're done. No big secret there.
The real secret is that they did 95% of the work at home.
So how do you do 95% of the rigging process at home? It's all in your plan. The better plan
that you have, the better your rigging process will go outside. So a really good plan has a lot
of details figured out. For example, you got to know what your main and your backup webbings are
so you can pre-tape them. If you can get your weblocks pre-installed before you send it over
to the static side, then that'll save you a lot of time. If you know what side the leash needs to
be on, if the guy on the static side is going to slide over when it's done, it needs to be on that
side. Those details can save you a lot of time. So let's go over the bag of tricks that you can
use to get the majority of the rigging process done at home. One of the best time-saving tricks
out there is pre-taping your line. Here is my Spyder Silk and Amsteel backup combo.
And I have pre-taped all the way down past the length I would ever need with this specific rig.
And nobody has to go out and tape the line when we're done rigging. I don't show you how to tape
in this video. I'll do that in another video. But the point is you can do this on your couch at home
while watching TV. This isn't something that needs to be done when you're out rigging and
wanting to highlight. Another time-saving trick is pre-installing your weblocks.
I do this on the side that's going to be sent over to the static side. Because the static side
is usually the side nobody wants to hang out at or it's the hardest to work on. So you're not
going to tension from over there. So it's better to have all the stuff you can do on your couch
done before you send it over. Check out our other video on how to use weblocks for a highline.
But in this situation, I have set up my configuration the way I like. I have two
soft shackles that will go on the master point once it goes over there. This big carabiner is
going to go on my tag line. And when it's sent across, all this extra webbing I've pre-taped
so it can stay nice and organized until it's on the master point. The tape is close to the
weblock so I know that I've kept things flat. And from this point on, it's just easy to send over.
Having the static side of your highline pre-setup also goes for sewing loops. Here I have double
sewn loops with a soft shackle method, which I strongly encourage you not to use. I will do a
separate video on that. But just for the example of something that, oh it's quick and easy, I'll do
it later. This can also be pre-set up ready to be clipped to your tagline and sent across. Another
time-saving trick is to pre-install the leash. If the guy on the static side is going to slide over
when he's done, which I don't recommend because you should inspect both sides before you get on,
it is at least on the static side when it's over to him. The spare carabiner allows it to be clipped
to the anchor while your hands are busy installing this part. If you put on two leashes, if you want
it on the other side, all of that should be pre-planned and pre-installed before you ever
arrive to your highline. Another time-saver trick is to flake the webbing correctly into the correct
bag. For example, you want to make sure that there's no twist and that the static side is on
top because that's the side that's going to come out when you attach your tagline. You also want
to make sure that it's at the bottom of the backpack you're going to use because you don't
want to bury your anchor material. You don't want to have to take your webbing out when you get to
the highline. Another trick is to have your tagline completely ready to go. For example, I have the
top of the perfectly flaked tagline clipped to both handles so you can take this off and it can
just be ready to go. The bottom is tied to the bottom of one handle and that way there's nothing
I need to do when I get to my highline so the person going to the static side can just get going.
It's a real time-saver not to have your anchor material messed. You don't want a yard sale when
you get to your highline to figure out who's going to take what. For example, here at home I can split
up the static ropes for each side. I can put half the whoopies in this bag and half the whoopies in
tension system bag. The tension system bag will take my tension system. My static side will take
a hangover for my partner to come back over and possibly a pulley for their tagline. Each side
gets some spare beaters and each side gets their quick links. This is everything I'm going to need
for the highline I'm going to do. I put it in a bag like this and that way each person can just
grab what they need and take off for the side they're supposed to work on and you can also use
the bag as padding or to reflake the tagline as you pull it across. It's a lot of uses for the bag.
It keeps it nice and tight. It will save you time if you take the time to send your webbing over flat
instead of rushing and just sending it out. You want to make sure that your webbing is
even and that you keep both strands flat and facing up and that everything is even.
This will save you time in the long run. Communication can also save a lot of time.
Not only is it safer to be able to communicate but it can also save a lot of time when things
don't always go well to be able to communicate the problems that you're having. So the moral
of the story is that you do everything you can possibly do at home before you ever get out to
the highline. Efficiency means safety because instead of spending four hours in the hot sun
and getting frustrated and making stupid mistakes you are doing exactly what you planned with all
the gear you knew you would need and you're not jimmy rigging anything. Being efficient can keep
you safer. Since nothing goes as planned you can lose efficiency and compromise your safety because
of it therefore you shouldn't highline. Hi I'm Ryan Jinks and this was another episode of the
How Not to Highline series. This is a guide for slackliners interested in transitioning into
highlining. We are not here to spoon feed the right rigging techniques. Instead we are we hope
to empower slackliners to critically think about any system that they're going to use. Risk awareness
can keep people alive. Please don't rig your first highline without an expert. We have too many
wonderful and generous people in our highlining community to go out rigging your first highline
by yourself after watching a youtube tutorial. Let's keep this sport safe and remember since
no system is perfect therefore you shouldn't highline. Thanks for watching and please subscribe.
