So I need an office. I work from home and Ashley works from home too. The place where I used to
edit my videos is where she works now. A little over a year ago I built myself a temporary editing
booth when I thought Ashley would return to the office but that's looking like that's not going
to happen anytime soon. My booth is way too small for the amount of time that I spend in there and
the truth is that there's more than enough room in this garage to build out my dream office.
The only problem is stuff. We have way too much stuff. It's in the way and so this video is not
about building my office. This video is about getting ready to build my office by building
a storage room. That way all my stuff is centralized, organized, and dust-free.
With the back wall clear I could start working on the framing and in order to do that I have
to set up shop in this room. I've completely filled my shop up with all of the stuff that
was in this room so that I have room to work. So I just grabbed my job site setup to cut down
these two by fours. The plan is to span these two walls with a new wall that's going to have
doorway in the middle of it and in order to attach to this outside wall I've got a conduit
in the way. So I just took a couple of the scrap off cuts from cutting these two by fours down to
size and I've nailed them in around that conduit. When the drywall goes in I'll just cut a notch
around the conduit and it'll be seamless. With that outer stud made I can start laying out the
rest of the studs for the wall. I've got the top and bottom plates right here which are going to
be the width all the way to the door and then I lay out each individual stud making sure to
separate them by 16 inches on center. After that I can spread apart the plates insert the studs
and nail them off. The second side of the wall is the same as the first except for a little bit
smaller and I'm leaving the top plate a little bit long and I'll show you why in a minute.
When designing this room I was a little concerned about the strength of the ceiling so I decided
to cut down a couple of two by sixes to put against the back wall as structural support.
These are going to act kind of like posts to support that back edge of the ceiling.
When framing I like to rely more on compressive strength than on sheer strength. Sheer strength
is like the strength of a screw from snapping versus compressive strength is when you stack
things on top of each other. You can certainly get lag screws that'll hold but compressive
strength is always going to be more reliable. Wait, I bought the wrong size two by six.
This is a pre-cut stud so that means that it's three inches shy of where it needs to be.
They do that because you put a two by four on top and you put a two by four on the bottom they're
an inch and a half each. That adds up to three inches and so they pre-cut them for your convenience.
The only problem is at the store it's really hard to tell the difference and a lot of times
they're mislabeled. I didn't bother to measure them so now I gotta go back to the store and buy
a couple more studs. With the right size two by six I can start nailing things together.
These are called joists all these parts that make up the ceiling slash floor and the ones that go
against the wall are the rim joists and those support all of the floor joists and then the
end joist is what goes on the end. This is all to say that I have to nail on the end joist first
because I can't get a nail gun in behind it once it's up and connected to the wall.
It's at this point that the room is finally starting to take shape and you can see the
reason why I left that top plate long. I want to be able to connect it to the doorway and I
also need to support it so I'm going to nail on an extra two by four. There we go. On a final check
for level I found out that this rim joist was a little bit out so I just added in a couple of
that managed to take care of it and then I could attach it to the wall.
The screws that I use to anchor these joists to the wall are structural screws and that's
important because regular screws have a tendency to be very brittle so they're strong but they
will snap. Anchors like this and like lag bolts the reason you use those is because they bend
rather than snap. To hang the rest of the joists I'm going to be using joist hangers. These make
installing joists super simple and you just kind of bend them into place. I've got each spot marked
with a pencil line that I drew earlier and then I can just nail them off. In the spot where there
was a seam I nailed on a four by four hanger and this is going to allow me to hang two joists in
the same spot and just add a bit more strength there. A four by four is slightly wider than two
two by sixes so I added in a little spacer half inch piece of cedar that I had lying around and
then nailed them all together. I also ran around and nailed all the joist hangers into the joists
locking them in place. The last step on the floor slash ceiling is to add a couple more rim joists.
These will tie all the pieces together and I'll end up with a really strong sturdy construction
that I'll be able to walk on and store heavy things on top of. And now that I have a nailing
surface I can also nail the top plate of the wall into those joists. The top of the wall is now
anchored but the bottom is not so I need to correct that. I plumb up the wall and fortunately there was
a stud behind one of the walls so I could screw into that but to get a little bit more anchoring
to the floor I had to drill into the concrete. I used a concrete bit with a hammer drill setting
and took my time drilled a deep enough hole to the right size for a tapcon screw.
These can be a little temperamental. I like to clean out the hole before I drive them in and I
also used a couple of washers so that it didn't bury the head of the screw into the two by four.
And with that the basic framing of the room was done. There's still a lot left to do. I need to
build organizers and put the walls on and put the top of the ceiling on but it started to feel like
a real space. As I mentioned before my shop is a complete mess right now so I decided to move
operations outside. It's springtime here in Seattle. The weather's getting nice. The only
downside is that I have allergies and that brings us to this week's sponsor which is Picnic Allergy.
More than 50 million people in the U.S. suffer from allergies and for me it's the crazy amount
of tree pollen this time of year that gets my nose itchy and my eyes red. Picnic Allergy makes
it easy to get personalized effective allergy treatment with FDA approved medications, personalized
plans, and convenient home delivery. You start by taking a short online quiz made by expert allergists
covering your symptoms, treatment history, and medical preferences. Then you receive a personalized
pack of treatments. If you need a prescription they will set up a consultation with a picnic doctor.
They deliver the treatment directly to your door on your schedule with the flexibility to adjust
the plan anytime. Plus patients receive unlimited access to virtual doctor follow-ups during their
treatment. If you need allergy advice and treatment my viewers get 50% off their first order when they
sign up and use the link below. The offer is valid for the first 100 people who click on the link in
the description. You take the quiz and the promotion will be automatically applied. They've helped me
enjoy working outside a lot more and hopefully they can help you too. Thanks Picnic Allergy. Now back
to the build. I spent a fair amount of time designing the shelves for this storage room. They're based on
a lot of the stuff that we already own and then also some modular bins that are going to go into
the individual shelves. The storage room is going to be like 90% shelves and I did my best to maximize
the usability of the space with the design of of these different units. The first one is going to
be the largest one and it's going to span across the entire back wall of the storage room. I designed
it so that all of the legs are exactly the same. They're going to allow for three shelves. In order
to make the tops of those shelves I got a couple sheets of plywood. The price of plywood right now
is pretty insane and I didn't want to waste any of it in this process so I decided to divide up
the sheets in half and then cut them into thirds and that gave me six shelves per sheet of plywood
without any waste. To join the plywood to the 2x4 legs I cut out notches at either end. The outside
notches were the full depth of a 2x4 on its side which is an inch and a half. On the insides they
are going to overlap so I could only go half that depth so three quarters of an inch which should
be plenty as long as I could figure out how to assemble them.
Once I figured out that I just had to lay the legs on the floor and then screw them in
it went a lot smoother. With the two outside shelves assembled I could space them out and
then insert the middle board to tie them together and now you can see how that middle seam works.
They tie together on each side and then I also put toppers on them and those didn't have to be
all those were just flat sheets of plywood. Now there was one issue that I didn't really think
about was that I needed to notch out for those posts that I put in earlier but that wasn't too
hard to do. Notching the shelves into the posts actually helped a lot with the lateral stability
of the whole shelf unit and in fact if I were to build this freestanding I probably would have put
an X on the back of it. The other thing that I did to strengthen the shelves was glued and nailed
in some 2x2s underneath each shelf. This is going to prevent it from bowing over time.
Next up was to start building the shelves on the opposite wall and these are actually going to
attach to the 2x4 studs that I put in earlier. All these shelves are going to be exactly the
same so I pre-cut all the parts for them ahead of time and then assembled them inside the space.
They're held together with a couple of deck screws. These are temporary they're not going
to be there for strength it's just enough to hold them together so I can get them on the wall.
The shelves attach by screwing them into the studs there's two screws on there so I can screw
one in and then use a level to make sure it's nice and level then go over to the other side and
repeat. I pre-measured out for all of these shelves and then I could just run up the wall and install
them. They're measured out for these plastic bins that I already own and the idea is that each wall
should hold 10 bins. There's two on the floor four shelves and then you double that on each wall
that means 20 bins which is a ton of storage. I know these look a little spindly at the moment
but I've got a trick up my sleeve to make them a lot stronger. Earlier I made these plywood triangles
and I'm going to be using them as shelf brackets. I drilled in pocket holes from the back edge and
on the top edge I countersunk a couple of deck screws. Once attached they add a ton of strength
and they also square up the shelves as I go. After that it's just a matter of laying the
plywood pieces on top and screwing them into place. I left the ceiling off while I was working
on the shelves because I didn't want it to be too dark in there while I was working but now it's
time to seal it all up. I've got some three-quarter inch plywood the same stuff that I made the
shelves out of and I'm nailing those into the joists. Each joist is on a 24 inch center so it
lines up perfectly for these 48 inch pieces. It's right in the middle of each joist so it makes it
easy to nail off. You'll notice that I made these panels a little bit long there's like a lip on
that top edge and that's so that when I apply the drywall it's going to sit underneath that lip and
be perfectly flush. And for those of you who are curious what that hole in my wall is that's a
air return for the furnace. Nothing too exciting. Once this is all done I'll put a filter over the
top of it. Something that is exciting is the lighting that I figured out for this space.
I was looking to all sorts of things like recessed cans all the stuff that was going to require a
bunch of electrical but this was a perfect solution. These are called construction string
lights and they are basically five super bright LEDs on an extension cord which when I saw them
I was like this is the perfect solution. It saved me a ton of time wiring them. All I had to do was
some cord management but they already come with carabiners on them so they hook up to the ceiling
so just a couple screw eyes and some zip ties and these things were ready to go. To complete this
kit I found a remote switch which has a receiver that plugs into the wall and a switch that you
can mount anywhere to turn the lights on and off. Oh it's so easy! Awesome. One final organizer I
decided to add in was a coat rack. We have a whole bunch of outdoor gear that we want to go in here
and having a place to hang all of our winter coats is going to be really nice. It was at this point
that I was starting to get pretty impatient with the amount of clutter around the shop and also
I just wanted to see if everything was gonna fit. I also took the time to reorganize a lot of stuff.
I wanted to make sure each bin was sort of a category so all my electrical stuff, plumbing stuff,
drywall and drop cloths, all those things are in separate bins and now they're easy to access
at any moment. I also found that all of our outdoor gear surprisingly just fit into this
one little corner with plenty of room to spare. The extra long center shelf allowed room for our
pop tent as well as my chop saw stand and the upper shelves were designed to hold all of my
artwork while they're in storage. Don't worry all this stuff isn't going to remain here. Some of
it's slated for shows in the future and other pieces will end up in my office after I finish
building it. Obviously the room is still not finished. I got a little excited by putting
things in but I still need to drywall it. I'm just using 5 8's fire code drywall. I decided
for drywall because I use this space as a metal shop and it's really nice to know that it's not
gonna light on fire. I'm not an expert at drywall. I've done it quite a bit mostly just for my own
purposes but I'm not gonna go into too much of a tutorial on this. Drywalling is an art form.
Some people are very good at it. I'm probably more in the mediocre category but I can get the job
done. Basically I'm just screwing them into the the blocking behind and then I'm gonna mud them.
I like the pre-mixed mud and then I use paper tape. I really don't like the fiber tape. So
paper tape I like to dip it in water beforehand, squeeze it out with my fingers and then lay it
on top of a pre-mudded joint and then I let that dry and then I'll go over and mud the top of the
paper later. It usually takes about three muddings and then I'll sand back to get a nice flat wall.
After that I can add some trim detail. This is just going to cover up that edge between
the drywall and the plywood. These are just some MDF toe kicks that I had left over from
an old kitchen project and they were in the way so it seemed like a perfect time to use them.
To finish off the wall I painted it with a few coats of primer and a coat of latex paint.
For the door I went with a pre-hung interior hollow cord door. These are nice and cheap and
they're not too hard to install. If you'd like to know more about door installation in more detail
I have one of the parts of my shed build series is devoted to installing doors and windows and
it's a good deep dive into how to do it actually how to frame it yourself and and good practices
when it comes to installing them. I then went and added a couple of pieces of that MDF around the
door as trim just to make it look a bit more finished. To finish things off I added a coat
of paint to the door and installed the remote light switch. Let me take you for a tour. I am
so thrilled with how this came out and just the fact that I could fit so much stuff in here. This
is like essentially two whole rooms worth of stuff inside of a tiny space. It's incredibly usable.
The fact that I have a space for all of my like plumbing and electrical and tile and stuff that
just kind of got in the way and didn't have any central location. It's here in clear plastic bins
so I could find all of it super quickly. There's plenty of room to expand like I said a lot of my
artwork is going to end up going away or going into the office. Access to all the outdoor gear
which took up an entire wall in the in the office space and now it's just this one little corner.
Also I've got loads of space above which I could spend a little more time organizing up there but
I'll do that another day. I got a lot of questions on Instagram about the height of this.
I made it this height because it makes standing height above a lot easier. Everything kind of fit
in this height and I like the idea that I can just like grab a box and and slide it up here when I
need to. As cool as this space is the best part of it is actually in the other room. How amazing is
this? This space if you remember from the beginning of the video was just packed with stuff and all
the stuff that's still here is stuff that's going to go into the office and I cannot wait to get
started in an office. That's going to be the next video. Sneak preview since you stuck around at the
end of this video I got a Glowforge which I'm so excited about. I've been wanting one of these
since they first came out and I now have one. I cannot wait to set it up so I'm going to get
started right away on the office and big thank you to Picnic Allergy for sponsoring this video.
A big thank you to my Patreon supporters as always. You guys are the best and I'll catch you in the next one.