Your queries aac block construction cost per square feet rate analysis for 200mm block work solid block work rate per m2 block work rate per square feet rate analysis for 100mm block work solid block masonry rate solid block work rate per m3 rate analysis for 150mm block work How do you calculate AAC block? How many AAC blocks is 1m3 Is code for AAC block masonry work how many aac blocks in 1 square meter how many aac blocks in 1 cubic meter block work quantity calculation how to calculate concrete blocks needed
Note- NOTE: ALL THE IMAGES/PICTURES SHOWN IN THE VIDEO BELONGS TO THE RESPECTED OWNERS AND NOT ME... I AM NOT THE OWNER OF ANY PICTURES SHOWED IN THE VIDEO ---------------------------------------------------------------------------------------------------------
Copyright Disclaimer Under Section 107 of the Copyright Act 1976, allowance is made for "fair use" for purposes such as criticism, comment, news reporting, teaching, scholarship, and research. Fair use is a use permitted by copyright statute that might otherwise be infringing. Non-profit, educational or personal use tips the balance in the favor of fair use.
Hello Friends Welcome to the Knowledge Hub channel Let's learn together
This is our 7th video in the rate analysis series
In today's video we will see how to do the rate analysis of block machinery or concrete block machinery
In today's video we have considered the rate analysis of an AC block
In this how to analyze it according to different thicknesses
For example how many blocks there are per unit and how much it costs per unit
So we will look into this in detail today
Let's do the rate analysis of a concrete block
We are going to see this
First of all let's take the basic rates
Material unit rate per rupee
We have considered the bag of cement at
Rs 320 per bag Sand at Rs 2473 per bag
Brass at Rs 7000 per bag That is
divided by 2.83 per cubic meter
We have considered Rs 2473.50 per cubic meter
We have considered Rs 80 per cubic meter of an AC block
We have considered Rs 5000 per cubic meter of a concrete block
We have considered Rs 50000 per cubic meter of reinforcement steel
We have tentatively considered all these rates
These rates change according to the market
We have provided these rates for reference only
What is the first item Providing and constructing a wall using lightweight concrete blocks
That is an AC block measuring 600x200x200
Length breadth and depth Its
strength is not less than 3
Newtons per square meter Cement
water is 1H26 Its ISP is 2185
For a 200 mm thick wall While doing the
analysis we will first consider 10
square meters Or 1 cubic meter
For 10 square meters or for 1 cubic meter
Now we have considered an AC block of size 200x200x600
How much does it take
1 divided by 0.6 into 0.2 into 0.2
How many numbers does it take
It takes 42 numbers
After this what is the rate
We have taken the rate above 80
And what is the amount
After this we have taken the wastage as 5%
And cement
We have taken cement as 1.21
How much is it
0.28 divided by 7
Because it is 1H26
1 plus 6 is 7
Into 1.05
Density is 1440
Divided by50
1.2 bags
So the rate is 320
And the total is 387
How did we think about sand
Six times more than cement We have
taken six times more than cement
According to this
0.28 divided by 7
equals 0.04
Into 1.05 equals 1.05 Into
1440 equals 1440 Divided by50
equals 0.024
1.21 bags Sorry
0.28 divided
by 7 Into6
1H26
Into 1.05 0.25 cubic
meter
We have considered 5% wastage
In both cases And what is the
amount of sand
0.25 cubic meter So
what is the amount of sand
According to this we have considered 10 rupees per square meter
And we have accounted for 2% mortar wastage
We have considered 2% wastage of
mortar Joint mortar
And labour 1 cubic
meter We have considered 1 000
rupees per cubic meter In market rate
This rate can vary
After this we have added
overhead and profit 15%
added So the total is 831
So how much is the rate per square meter
10 square meters
So divided by 10
637
And the rate per cubic meter is 6 372 cubic meters
Keep this in mind
What is the rate
What is the number of
blocks What is the amount of cement
What is the amount of
sand This is mainly material
After this there are labor charges
There is scaffolding
And there is overhead profit
And in all this the main thing is not to forget to add waste
Wastage also has to be considered
Now there is another item
in this Providing
and fixing
Trika cement concrete Solid block
400 by 200 by 100
This is 1s to 2s to 4 concrete
And there is mortar in this
1s to 3
According to this this has to be made
Analysis of 1 cubic meter
This is 100 mm thick
So 10 square
meters What is the size of the solid block
400 by 200 by
100 The quantity is 1 divided by
0.1 into 0.2 into 0.4
How much will it cost
And how much will the cement cost
0.29 How did this 0.29
come about I
will tell you
Look at this
First of all this mortar
The size of the block is
0.2 by 0.2 by 0.4
2 by 0.1
After that adding 10
mm thickness the size of
the mortar is 0.4 by 0.2
by 0.1 10 mm thickness
0.41 0.21 0.1 After that
the difference between The
size of the block is the
same as the size of the mortar
After that this
C36 is
equal to C35
multiplied by
125 What
is C35
After multiplying by 125
s amount multipliedby
1.54 multiplied by
1.05 The total
is 0.29 How
did this 0.29 come 0.29
divided by 4 multiplied by
the density
of the cement
multiplied by
50 multipliedby
1.54 This is 3.22
After this the sand
is multiplied by
The bag
of cement
is 50 kg
Divided by 1040 1.33
multipliedby3.33
This amou
s 5%
We have considered
10 Rs
Due to 100 mm thickness
we have used RCC Patli
RCC Patli has two numbers
8 millimeters is 12 centimeters
1 meter is 12 centimeters
124 Rupees
150 Rupees
per square meter
This is the total quantity
Overhead profit
is 15 rupees
Now we will make RCC
Patli 100 mm x 100
mm Patli has two
numbers 8
mm diameter
6 mm diameter
is 300 cm
Wall height
is 7 m
Length of wall is
10 divided
by 7
Spacing is 1 m
Number of
stiffness is
C50
divided by1 m
7 m divided by 1 m
Minus1 is 6
Size
is 01by0
1
Quantity
of C53
is6x
C51 x
143x
E53
0.1 multiplied by 0.1
This is the amount
2 percent
wastage is 5500 Rs The amount is
470 Rs The
labor cost
is 200 Rs
8 mm is 7 m
Length of wall
is 3 m
Number of
stiffness
is 2 m
Weightis
0.39 kg
Rate is 50
000 rupees
2 percent wastage
The amount
is 500 Rs
The amount
is 56 Rs The
size is 300 cm The
length
of the wallis
0.3 x
C53x
0.5
Weight
is 4 kg
Rate is50
000 Rs
2% of the
total is 500 rupees
Labor cost is 20 rupees
Total is
1200 rupees
1 square meter
is 124 Rs
Total is 8
830 rupees
Overhead profit
is 1 325 rupees
Rate per m2is
1016 Rs
Remember one thing
Concrete of
mixture cement fine
aggregate coarse
aggregate water
are mixed When we add water in
cement dry mixture
volume is reduced
Percentage of voids due to fine
aggregate is 20%
Percentage of voids
due to coarse
aggregate is 32-34%
Total void
percentage is 52-54%
Dry volume is equal
to weight volume into
1.54 The quantity of
concrete is important
Dry volume is
equal to weight volume plus 54%
weight volume 1
54 is the
conversion factor Weight
volume is equal to dry volume
Dry volume
s equal to
54% weight
volume
Conversion factor 1 54
s equal
to weight volume into
54% weight volume
The conversion
factor of 1.54
is equalto
54%
weight
by volume
The conversion factor
of 1.54
is equalto
54%
weight by volume