LS3 V8 Miata Build - Project Thunderbolt Part 8

Tom's Turbo Garage
2 followers
3 Video ViewsยทNov 16, 2022
In this episode, we begin putting her back together.
Fuel, wiring, uh, this thing. Let's go.
In our last episode, we sealed up our chassis mods,
sprayed on lizard skin sound control and ceramic insulation to keep things cool
and quiet, and then finished off our engine bay
with a fresh coat of paint. Up to this point, you've seen me tear
down, tear apart, strip, cut, beat,
weld, and paint. The driving force behind these steps was to prepare our chassis
to accept its new drivetrain. We've now reached a critical milestone
in our build process. The chassis modifications are complete
and reassembly can begin. From here on out, the way I'll be working
will change. Instead of one big job at a time, as
you've seen up until this point, I'll now have many tasks going on at
once, since most of them impact one another
while the car is going back together. So things are going to be a little more
frantic around here as I quickly jump from job to job.
All right, let's get to work. Our reassembly begins with the braking
system components that we removed months ago.
Back in goes the brake booster, master cylinder,
ABS unit, and lines. Inside, we reinstall the firewall insulating mat
and the combination brake pedal and drive-by-wire gas pedal assembly.
Next up is the massive factory wiring harness.
This time around, we won't be installing the engine portion of the harness,
which conveniently unplugs from the rest of the giant unit.
Before tossing this back into the car, I had to spend a few minutes refreshing my
memory on where everything goes. This is where over-labeling things really
pays off. Although I may look a little befuddled
here, I had it all sorted out in no time.
Oh, and reference pictures I took before I yanked it all out months ago were a
huge help too. It's just so easy to forget how things
are routed and where all the little clips go when the months go by.
I feel like I'm birthing this thing. Oh, I think I see the head!
Before we bolt the engine and transmission assembly in the car for
good, we need to install a shifter. To handle
this important job, I chose the Hurst Billet Plus high
performance shifter. It features a billet aluminum base and
stop collar, high ratio pivot mechanism for shorter
throws, adjustable bias springs for tailoring
stick tension, and adjustable gear stops. It also includes detailed instructions
and all the hardware and accessories needed for an easy install.
Since this shifter is designed to be used in 1993 to 2002 Camaros and Firebirds,
the long shift handle won't work for our setup.
What will work is this shift lever adapter from Flying Miata,
which allows us to use our stock Miata shift knob and places it at the perfect
height and location. So we'll remove this lever for good and
install the Flying Miata adapter later on.
Installing the shifter on the transmission is easy and the included
instructions are detailed and easy to understand.
You start with a bead of sealer, follow it up with the included bolts,
and then torque it all down. Our hungry LS376 525
has an appetite for gasoline and plenty of it.
Feeding this beastly V8 requires a significant upgrade to our fuel system.
So let's get to it. For this vitally important job, I chose the V8 fuel kit
from Flying Miata. In typical Flying Miata fashion, this kit
includes every single item needed to do the job.
And every item included in the kit is of the highest quality, which translates to
long service life and reliability. The kit includes a quiet and reliable
Deitchworks 300 series fuel pump kit, which flows 340 liters per hour or 90
gallons per hour, which is more than enough for our LS3.
And would support future modifications, you know, if
one were to want to do something like that.
The kit also includes these ready-to-install stainless steel braided
dash 6 AN lines, this stock Corvette fuel filter and
regulator combo, all of the necessary fittings to adapt
the AN lines to the Miata and LS fuel components,
and finally these rivet nuts and cushion clamps to route the lines properly.
All right, let's go. In our last episode, you saw me coat the gas tank in
lizard skin ceramic insulation to protect it from hot exhaust parts that
will be nearby. I only coated the bottom and sides though,
mainly to keep the pump access area nice and clean.
So this is where our fuel system work begins. We start by removing the stock
pump assembly from the tank. This is always a good time to inspect
your tank to make sure there's no rust or other troublesome gunk in there.
You'll see here that the Miata came with an in-tank fuel pressure regulator,
and that won't work for our setup, so we'll remove it.
Now it'll act like a regular fuel return.
Next, we remove the stock fuel pump and... oh man,
looky what we've got here folks! Mitsubitsu!
Yeah! Now we install the new fuel pump in the stock spot,
and adapt the new plug to the Miata's wiring.
With that done, we reinstall it into the tank and button it up for good.
Next, we install these Russell AN fitting adapters to the feed and return outlets,
and then screw on our new fuel lines. Early on, you saw me remove the Miata's
entire fuel system. This has cleared a path for our new
system, so let's get to bolting it all in.
First up is the tank. With that in place, the next task is to prepare our Corvette
fuel filter regulator combo. This involves installing AN fitting
adapters on the inlet, outlet, and return. To mount the new
filter in the car, I'll be using these rivet nuts.
They're really handy and easy to install. You just drill a hole,
insert the rivnut, and then use a rivet gun like this one to press it in.
What you end up with is a strong, flush-mounted home for a bolt.
Alright, let's do the same on the car. Perfect!
This is as far as we'll go with the fuel system for now. There are some other jobs
that need to be done first. A couple episodes ago, you saw me test
fit our V8 Roadster's frame rails and transmission crossmember.
Well, with the engine now in place for good, it's time to install these parts
permanently. First, I installed this exhaust support
bracket from Flyin' Miata, and then torqued it and the
transmission mount down. Next came the crossmember, and then
mounting it to the frame rails. Now we use each frame rail as a template
and drill our mounting holes. Here you can see how they bolt through
the floor. Next, I took a little break from that job
to install our differential assembly. Before that, you may recall that we added
this fitting for the differential vent. To finish this off, I added a length of
hose and a factory GM vent cap to the end of it.
Now this setup is ready to be tucked away into its new home.
Okay, back to the frame rails and crossmember. It's not a good idea to
drill a bunch of holes in your car without protecting them a bit,
so I unbolted the frame rails and sprayed undercoating on both sides of each hole
we drilled. With that dry, it's time to bolt it all
back in permanently. So here's how it all turned out. With the
wiring harness and carpet back in, I can finally get some rest around here.
You know, I'm not sure why, but getting this carpet in here feels like
a really big accomplishment. Maybe it's because it's starting to feel
like a car again. All right, enough of that. Get back to work.
In an earlier video, I showed you the Corvette Z06 air intake kit from Flyin'
Miata. Back then, we also modified the front end
to make room for it. Now with our mods sealed up and painted,
we can do a little more work to fit this monster snorkel in place.
Following the detailed instructions from Flyin' Miata, first up we'll cut these
tabs off. A hacksaw makes a quick, clean cut, and I
like to use a piece of masking tape to help keep my cuts nice and straight.
Finally, a file smooths it all out nicely. Now we connect one end of the accordion
hose to the throttle body and the other end to the intake. Next, we
can determine the final position and mark the mounting holes with a punch.
Now we'll drill out a couple holes and put some rivet nuts in place.
Nice! Finally, I threaded in some long six millimeter bolts to see how it all
turned out. Looking pretty good to me. There's more
work to be done to make this fit, so we'll come back to it later. A couple
episodes ago, you saw me bolt on some shiny new headers.
They looked great and were working out pretty good while sitting on the moving
dolly, but not so much in the engine bay. This
is the sort of thing that you have to expect with most any car project,
where you're combining all sorts of different parts. To fix this, I chose
Flyin' Miata's LSX conversion headers. They're designed for a perfect fit,
offer tons of clearance in the Miata's tight engine bay,
are constructed of stainless steel, and come with a lifetime warranty.
Now, if you're looking for maximum performance, V8 Roadsters does offer a
high quality set of one and three quarter inch long tube headers for LS
powered Miata's. I may end up going that route someday,
but for this version, let's call it Thunderbolt 1.0.
These are a great all-around choice. I'm also going to slide on these v-band
clamps that I got from Summit Racing to see how they fit under the car. My
hunch is that the ground clearance may be an issue,
but we'll find out in a bit. All right, let's bolt these on.
It would have been ideal to install them while the engine was out of the car,
but I was past that point, so on they go with the engine in the car.
Installation on the driver's side was really easy. I just slide them up from
the bottom and bolted them up. On the passenger side, the starter had to
be removed, and then installed as the headers are
being slid into place. This worked out well, as it gave me a
chance to tidy up the starter's heat shield
for a more snug fit. Let me tell you, it's these little details that take so much
time on a build like this. I probably spent a good hour on this
heat shield alone, but my goal in pining over these small
details is long-term reliability and as few issues as possible down the
road. After sliding everything in place, I
torqued down the bolts and then reinstalled the dipstick.
So how did those v-band clamps work out? Well,
doable, but they're hanging a little low. I think I'll opt for a slip fit here and
put these v-band clamps to good use elsewhere in the exhaust system.
Thank you for watching, and thank you to Summit Racing for help making this
series possible. In the next action-packed episode, we're
installing suspension upgrades, bolting in the driveline, and tackling
everyone's favorite job... wiring. For more pictures and details on
this build, check out my website at v8mazda.com.
So with that said, thanks again folks. We'll see you next time.
