Basement Finishing From Scratch, Remodel Time Lapse

ZEM Construction
5 followers
16 Video Views·Nov 3, 2022
Hey everyone, Zach here with Zem Construction. I have another project video here for you of a
job we just recently finished up. So this is a 2100 square foot house located in Spokane,
Washington. The goal of this project is to finish the basement by adding two bedrooms,
a bathroom, laundry room, a couple unfinished utility rooms, and a large living space.
This house is going to be utilized as a rental property, so by adding this stuff
my client can get significantly more value by having larger families live here and more people.
Great, great project for a house like this. As you can see all of the
walls are unfinished concrete, all the joists and everything is exposed, all the duct is exposed.
One of the main things that they were really really important to them was a cohesiveness
between the upstairs and the downstairs. You can see there's some doors, some pictures of the
bathroom, and we really wanted to do our best to make sure that everything matched the upstairs.
So here we are doing the first step of the process of getting those egress windows in.
So I'm cutting out the foundation wall so we can fit the four foot by four foot windows in.
The dirt has been all removed from the outside and dug. Now we're just breaking up the concrete.
The sledgehammer works great for this process. Breaking them into manageable chunks,
nothing too large so we can still carry them. There's the first one all finished up.
Now on to the next one. Fortunately no one was living in this house during the entirety of the
project, so we made a little bit of a mess. It was not that big of a deal, just something we had to
go back and clean up later. We decided to go with making dust as opposed to utilizing water and
creating a big muddy slurry mess that we had to walk around in. So it worked out in the long run.
Here I am breaking up some more of the last pieces, making some adjustments to the hole we're
in it using a metal window well that drops in and bolts to the foundation. So it turns out really
nice trying to get as much space as possible in there. Now here I am framing in the new windows
that are about to go in. Utilizing treated boards of course and luckily I'm the one who made those
cuts so they're all nice and straight. Made my job a lot easier not having to utilize too many shims
or make too many adjustments. Worked out really well. Of course we added foam insulation in between
all of those gaps and cracks and added a barrier on the exterior of the house as well. Now here
we are starting framing. So none of these walls are load-bearing of course, so 24 inch on center
all the way around is more than adequate. These walls are used more for hanging the drywall on and
putting insulation in and plumbing and electrical. We ended up leaving a two inch gap around where
the concrete goes in between so that we can have room for insulation in there. You saw we were
building a little box around the water meter. A quick little shot of that. Here we are just framing
all the way around and at this point we are digging the trench for the plumbing. On the right
side there's where the bathtub shower combo is going to go. The left side is going to be the
vanity and the toilet. So just getting ready for the plumber to come in and get those things in
there. So we continued on with framing underneath that beam. One of the great ways to hide a beam is
to build a wall underneath it. Putting up some more walls for the bedrooms and we finally got the
windows to replace the old metal windows in this in this space. So we ended up having to cut out
the metal frame that was poured into the concrete foundation. Got rid of all that and we're able to
get those windows installed. Of course insulated, secured very well. Here we are finishing up some
of the framing in the bathroom, working our way around. A lot of that plumbing was already there
so we did what we could to work around it. Here we actually built a little unfinished room around
the electrical panel. You'll see a lot more of that as we go on here but it's one of those great
touches that I'm really really glad we added. Here we're back filling in that trench while the
plumbing is finished up and ready to go. Getting ready to pour concrete over the top of that.
Hey guys how's it going? So we just wrapped up stage three of the project. So far we've gotten
done framing, plumbing, and electrical is done. The next steps after this is insulation and drywall.
So we really want to show you what we've done so far because the next phase everything is
going to be covered up. So starting off here this is the laundry room area. This will be all finished
in here. We're going to have an access door into the steps. The lighting is very temporary this is
just so we can see what we're doing. This is going to be the main living space obviously.
Can lights. Can lights are in. They're hanging. Some of them are hanging down. We're about to
remove them so we can do drywall. In here is going to be a full bathroom with the tub,
shower combo, double vanity, toilet. You can see in the floor we had to rewrap the plumbing.
Plumber did a great job. Looks really good. Fan. Now this is into the utility room. This is going
to continue to be an unfinished room. It's also like a full storage right now. Integrating some
more lights. We did as best we could to try to keep the height as high as we could. We didn't
want to infringe on any head space and we didn't have to. This is bedrooms. Big closets. We worked
really hard to make the layout as big as we possibly could for the bedroom. Big large closets.
All the windows in the entire space have been replaced. So new nice vinyl window
and of course good fire code. We had to do an egress window here.
So this will all be finished up. I just wanted to update the progress so far.
So here are some more progress pictures of where we were at so far at this point in the project.
Bedrooms. You will hear me mention this a couple times. One of the main challenges
with finishing a basement is working around things that you can't move. Things like that
water meter. The beam. Duct work. Things like that. Electrical panels. How are you going to
creatively make those fit into the space that you want to utilize later. There's that room
that I was talking about. Little access door for underneath the steps. Big wide shot of where we
were at. You can see some of the insulation that we had to take down in order to run new ducting.
We left up as much of it as we could but that was not necessary after you finished the space below.
There's that little unfinished closet I was mentioning before. Now the insulation is going
up. This is an R21 insulation. It needs five and a half inches in order to have its full effect.
So that's why we spaced those walls two inches away from the concrete. Two by four is three and
a half. Two inch spacing allows for five and a half inch insulation. This insulation does have
paper on the batting and it does technically count as a vapor barrier. However we went with
a redundant process and added a plastic vapor barrier over the top of it anyways.
One of those things might not be necessary but just a little bit of peace of mind. There's
nothing worse than getting moisture seepage in a basement. We did what we could to avoid those
things. Code says that any finished space that is exposed to a concrete wall needs to have
insulation. Anywhere around the exterior we added insulation. Here we are putting up some of that
vapor barrier that I mentioned. No vapor barrier is cheap. It only takes a second. One of those
things. I'm really glad we did it. Like I said it may not be necessary but it just helps to sleep
at night a little bit. And now on to drywall and the only way to get drywall into a basement is
carry it down the steps by hand. So the first thing we do is the lid or the ceiling first.
Unfortunately as much as you would hope they were none of those joists were square and straight.
Not that big a deal. Easy to work around but it's one thing to keep in mind. At this point
we're not using a lift. You know the process works but it's not ideal. The next day we started on the
bedroom and we had finally gotten the lift and we were so glad that we did. Even with two people it
just allows us to be a lot more precise. You can make adjustments on the fly. Make sure that you
have all the tools and screws and everything you need. Even on little pieces like this just makes
it so much quicker. This is what we ended up calling the hallway. It's a little area in
between the bedrooms and the unfinished utility room. Here we are in the bathroom. You can see
the exhaust fan right there. Like I mentioned before one of the challenges is the duct work and
trying to keep the head height as high as possible. So we ended up just screwing the drywall right to
the bottom of that duct work as you can see right here. Of course that is more than adequate, more
than safe. None of that is going to get hot enough to cause any issues. This is the laundry room.
This was kind of a fun thing. Not often do you get to hang a full sheet on the ceiling without
having to make any adjustments or cuts. That was kind of fun. The room is eight foot wide in the front
but it does taper out a little bit of course because this house is not square. That's all right.
Not that big a deal. Add a couple more sheets makes it a lot nicer and easier in the long run.
Now we're on to hanging the walls. One of the most important things when hanging drywall is the seam
between the ceiling and the wall. That's one of the first places that your eye travels to when
walking in a space. So by hanging the wall the top row of the wall first allows us to keep that wall
straight. Here we are hanging some of the more intricate pieces in the closets hiding the duct
work. Like I mentioned before trying to hide some of that stuff by putting it in the closet you
actually don't even see it. Head space is not that necessary in a closet so we kind of sacrificed the
head space there and it worked out really well. It turned out nice. Another thing we did
because of the duct work is we had to move the shower over slightly because we didn't want
your head to be running into the duct that's hanging low. So by moving that over a little
bit we created what we ultimately called a little linen closet. Just the area underneath the duct
work on the side of the shower. It's a great place to throw a laundry hamper, put up
some shelves, maybe a cabinet someday. So after everything was hung this is showing the taping
all done and the first coat of mud. Unfortunately we couldn't film all of that. Just tried to be
efficient and hurry in some spots. Did get some pictures though fortunately. Bathroom again you
can see that little linen closet area that I was talking about. Bathroom where the vanity and
mirror is going to go. Into the laundry room you can see that unfinished electrical closet I
mentioned before. The area under the steps. Main living room. Now the first coat or the only coat
of texture and primer have been applied. It'll really start to look like a finished space now.
Of course everything is masked off. You can see that box we built around the water meter there.
A little homemade vent tube extension. And one of the things we decided to do is at this point
was when we put the tile in. And simply because we wanted to be able to put the baseboard over the top
and all of the baseboard trim and doors and the ceiling were all painted the same color white.
So by putting the tile down and putting the baseboard over the top allowed us to paint everything
all at once. Instead of having to go back and do tile and paint later. You can see here all of the
white paint is finally done. All the trim is hung. Nails have been filled. Painted. The ceiling's
painted. Everything is masked off. We actually built those window boxes out of a three-quarter
inch plywood. So they're very strong. Very sturdy. You can climb on them and put stuff on them. Use
them as shelves. Nightstands. Whatever. There's that little hallway leading into the unfinished
utility room. Main living space. And since all the doors were being painted the same color we actually
just leaned them up against the walls that didn't need white because those are going to get a
different color later. So we just sprayed the doors at the same time we were doing the ceiling and the
baseboards and everything. Worked out really well. You can see there we masked off all the tile.
Which that process did not take that long. Again another picture of the the tile. It looks great.
It didn't get any paint on it obviously. Again there's that unfinished electrical closet.
Some more doors that we painted all at the same time. Worked really well. One of the adjustments
we had to make with every single door in this space was because of the low ceiling height.
We had to shorten all of the doors. So simply cut them off the bottom and now there was a hollow
piece there. Just grabbed a cutoff that came from the bottom of it and glued it in. Actually it was
very sturdy. Very strong. Worked out really well. Now we finally get to start painting. Cutting
everything in now. And to be honest I was not a huge fan of the color but that was one of those
things that the client would rather have it match upstairs. As opposed to having us maybe paint the
space. We just decided to be much more simple to get a paint that matched. And it actually turned
out really nice. Doing our best to avoid getting of that any of that tan paint on the white doors.
One of us was rolling the other one's cutting in and worked out really well.
Just working our way around the doors. One of the things we did obviously by keeping the ceiling
even that little area in the hallway. By keeping that white and as bright as we could. Makes
everything feel a little bit taller. Although the space is only seven foot two inches. It's one of
those things you really really can't tell. Little tricks like that. Visual tricks with the with your
eyes can can make a big difference. And unfortunately this shot is a little out of focus but
putting in the vanity and countertop sink mirror light fixture really obviously makes those
things into a bathroom. Fun process there. Really means we're getting on the home stretch.
And yeah next process is the carpet. Of course we used a carpet padding that's designed for
concrete floors. It has a barrier on the underside to help wick moisture and things like that.
Laying that in. Another stuff that we're putting in is a folding table in the laundry room. That
was one of the things that the client really wanted. We end up using the same countertops
that's in the bathroom. So it kind of keeps everything cohesive in that way. It turned
out really nice. Very strong. Very sturdy. Putting first roll of carpet down one of the bedrooms.
We did the main room last obviously just so we could keep some places to put garbage cans and
things like that. Getting all the padding down. And now this is a pretty big roll of carpet.
12 foot by 31 feet I believe. We're just trying to be very strategic and very careful about how
we unrolled it. Try not to scratch up the walls or anything like that. It worked out really well.
Here we are just stretching everything. Getting it all nice and flat.
Getting the transitions all cut in. Splicing a little piece for that area. Now here we are
putting some padding on the steps themselves as well as the carpet over the top. It turned out
really nice. We didn't make any adjustments to the wood steps and didn't really need to.
It worked out great. Here we are adding a little piece into the hallway just the way that the
rolls worked out. We had to have a seam somewhere. Unfortunately you can't even tell. Run the vacuum
over at one time and all the fibers meshed in really well. Working on some more transitions.
And now we're on to the last day. The homeowners were actually on their way over so I just ran in
real quick and did a little bit of last second sweeping and mopping and then chased the vacuum
around a little bit. It's little finishing touches like that that make a pretty big difference.
Now this is kind of a depiction of what the customer walked into the first time.
They were definitely there during the process but hadn't been over in a little while so this
was all very new to them. There's that electrical closet I talked about several times. Turned out
really nice. Just looks very finished as opposed to building some cabinet or something over the
box. I think that's the best way to go. We kept the area inside the shower white. Just kind of
keeping everything clean and nice. It turned out really nice. Of course trying to keep everything
as close as we possibly could to upstairs. Even the light fixtures. Trying to keep everything
as cohesive as possible. All the window wells are in. Closet shelves are up. All those fine
details and a couple more. Things like towel bars and towel hooks. Toilet paper roll holders. Things
like that. Not stuff that would be expected by a general contractor to do but it's things that
we really wanted to add. It just adds that finishing touch. I think it shows our level
of detail that we put into everything. Not one thing is missed or goes unturned. We put a
little vinyl film over the window in the bathroom for a little bit of privacy.
Really turned out nice. Lots of light even comes in from those windows. Especially in the bedrooms
with the egress windows. That folding table turned out really really nice. That little door. Even the
handle on the door we've got the same style of handle that's upstairs in the kitchen and the
bathroom upstairs. Bathroom in the basement. One of the things they added was a brand new air
conditioning unit into the house. So you can see some of the new tie-ins for that. Just look at all
that light that comes in there. It really really really looks nice. All the doors match everything
that's upstairs. They all match each other obviously. Again those plywood boxes adds a lot
of strength. There's that little box for the water meter. You'll get a better look at that later.
A little trim around the closet doors to hide those slides. There's a lot of opportunities to
make nice finished details like that. I think we really took advantage of all even the doorknobs.
They match. They're the same ones that that were upstairs. Just that large living space.
Really nice. Here's some small detail shots. Here's some poles we added into the closet doors.
Shelving and hanger bars. Here's a close-up of that box hiding the water meter with a little
access panel that we painted the same color. Showing the hallway with the light in it.
A little detail sink shot. We really no no spot was overlooked. We really tried to put as much
attention to detail in everything that we could. Again there was those towel hooks and towel bars
that we added. There's that finished or yeah that finished linen closet area that I mentioned before.
This is a good shot of that underneath fireplace chimney that's upstairs.
Trying to maximize that space. Basement door. Basement steps inside there. And here is inside
that electrical closet I mentioned before. Yes it's all unfinished but everything is accessible.
No water or anything is going to get on that electrical panel. Everything is safe.
Confined. Here's some wide angle shots of the process. This is really before anything got
started. Near the middle of the project with all the framing done. Electrical, plumbing, lighting
is all in. Now it's really starting to look like a room. Drywall, mud, texture, primer, paint.
Doors are getting ready to be hung up. Really starting to clean up the space. Getting all the
tools and things like that out. And here's the finished project. You know everything turned out
really really nice. The client was so happy. So excited. They got their
property management company in the next day to take pictures. They're going to get someone in
there so quick. If you have any questions or looking to get something done or you need a
quote on something. Please do not hesitate to reach out. We look forward to working with you
in the near future. Thanks so much for watching and we'll hopefully hear from you soon.