With the rapid increasing size of Wind Turbine Generators, the transportation and installation of offshore wind farms is becoming a big challenge in the complex logistics around increasing the offshore energy production. Currently the capacity is around 9MW per installed turbine, which is expected to increase to 11MW next year. Furthermore, the latest turbine models being displayed by the major manufactures will increase further to 15MW within 5 years
AI Generated·May contain errors
Video Summary
AI Generated
This video explores the engineering and logistical challenges of scaling up offshore wind turbines. It details the manufacturing of massive components, the specialized vessels required for installation, corrosion protection strategies, the construction of monopile foundations, and the complexities of undersea power transmission.
The rapid increasing size of wind turbine generators, the transportation and installation
of offshore wind farms is becoming a big challenge in the complex logistics around
increasing the offshore energy production. Currently, the capacity is around 9 MW per
installed turbine, which is expected to increase to 11 MW next year. Furthermore, the latest
turbine models being displayed by the major manufacturers will increase further to 15 MW
within five years. The challenge comes from the sheer size of the components. For example,
the blades, though not relatively heavy, are heading towards 130 meters length, which becomes
challenging to store on the deck of the ship. When considering transporting the blades transversely
on the deck of a ship, the rolling motions could cause the tips of the blades to touch the water.
When considering transporting the blades longitudinally, the length of the vessel
becomes the limiting factor. Furthermore, the next generation of cells are expected
to weigh up to 1,000 tons and have to be hoisted to heights of up to 150 meters above sea level.
The ships currently used to transport and install WTGs were designed for turbines of about 3 MW,
which would weigh around 150 tons and had to be hoisted to 80 meters above sea level.
This development has occurred very fast, in less than five years, which is a fraction of the
lifespan of a typical vessel. To keep up with this progress, vessels have had to go through
multiple updates since launch so they can still be utilized in the latest installation of wind farms.
How to Create Giant Wind Power Pillars? It is not located on the mountains or plains,
but must be immersed in the sea. Is there any way to resist sea water? Let's learn and discover how
to do it on Machinery and Technology Channel. Here, at the start of the process, the plates
for the cones are pre-cut in final shapes using these smaller shapes, means make the best possible
use of plates, have less cutting loss, and can eventually roll the cone in one single move.
Also here, the pre-cut plates for the cones and the plates for the cans will be milled on the
shortest sides that are going to be welded together. Here, there are three identical
assembly lines, where the panels are completely welded from both top and bottom. This means no
having to flip the panels to weld the other side. Less handling, meaning is that this is safer and
greatly reduces the handling time for this part of the construction. Once the plates are welded,
they will be milled here. After welding, there will be a need to check for welding inaccuracies,
which currently means needing a very short feedback loop and being able to instantly adjust
your process to prevent these irregularities when repairing panels will be taken offline once the
process at this hall is complete, ensuring logistical flow. In this part of the hall,
the discs are rolled into the final shape of cans or cones. Thanks to the new process, our cones can
now be rolled in just one pass automatically with just one move. From a metal plate, the unique
approach of this new technology once again makes the process safer and faster. Since offshore wind
turbines are located in oceans and large lakes, the materials used for the turbines have to be
modified from the materials used for land-based wind turbines and optimized for corrosion resistance
to salt water and the new loading forces experienced by the tower being partially submerged in water.
With one of the main reasons for interest in offshore wind power being the higher wind speeds,
some of the loading differences will come from higher shearing forces between the top and bottom
of the wind turbine due to differences in wind speeds. There should also be considerations for
buffeting loads that will be experienced by the waves around the base of the tower,
which converges on the use of steel tubular towers for offshore wind applications.
Since offshore wind turbines are constantly exposed to salt and water,
the steel used for the monopile and turbine tower must be treated for corrosion resistance,
especially at the base of the tower in the splash zone for waves breaking against the tower and in
monopile. Two techniques that can be used include cathodic protection and the use of coatings to
reduce corrosion pitting, which is a common source for hydrogen-induced stress cracking.
For cathodic protection, galvanized anodes are attached to the monopile and have enough of a
potential difference with the steel to be preferentially corroded over the steel used
in the monopile. Some coatings that have been applied to offshore wind turbines include hot
dip sink coatings and two to three epoxy coatings with a polyurethane top coat.
Specialized jack-up rigs, wind turbine installation vessels, are used to install
foundation and turbine. As of 2019, the next generation of vessels are being built,
capable of lifting three to five zero zero zero tons to 160 meters.
The large components can be difficult to install and gyroscopes can improve handling precision.
Dynamic positioning has also been used to keep the vibrating pile driver steady when installing
foundations. A large number of monopile foundations have been used in recent years for economically
constructing fixed bottom offshore wind farms and shallow water locations. Each uses a single,
generally large diameter, foundation structural element to support all the loads of a large
surface structure. The typical construction process for a wind turbine subsea monopile
foundation and send includes using a pile driver to drive a large hollow steel pile 25 meters deep
into the seabed through a 0.5 meter layer of larger stone and gravel to minimize erosion
around the pile. These piles can be four meters in diameter with approximately 50 millimeter thick
walls. A transition piece complete with pre-installed features such as boat landing
arrangement, cathodic protection, cable ducts for submarine cables, turbine tower flange, etc. is
attached to the now deeply driven pile. The sand and water are removed from the center of the pile
and replaced with concrete. An additional layer of even larger stone up to 0.5 meter diameter
is applied to the surface of the seabed for longer term erosion protection.
For the ease of installing the towers and connecting them to the seabed, they are installed
in two parts, the portion below the water surface and a portion above the water. The two portions of
the tower are joined by a transition piece which is filled with a grouted connection. The grouted
connection helps transfer the loads experienced by the turbine tower to the more stable monopile
foundation of the turbine. One technique for strengthening the grout used in the connections
is to include weld beads known as shear keys along the length of the grout connection to prevent any
sliding between the monopile and the tower. Offshore wind turbine components are large.
Transporting of components between manufacturing and assembling facilities before the installation
is to be minimized. As a result, offshore wind port facilities have been specifically built in
the regions with high concentration of offshore wind developments. For large offshore wind farm
projects, offshore wind ports become strategic hubs of the supply chain for the installations.
Normally, for cable routes with a length of less than 80 kilometers, high voltage alternative current
HVAC transmission will be a more economical system because it is a cheaper technology but is
limited by how it can be installed. For longer distances, it must be done by high voltage direct
current power transmission, high voltage direct current system HVDC because of the advantages
of reducing power loss and saving energy. Submarine power cables are sometimes installed
in harsh environments including high waves, currents, water pressure, or obstacles on the
Therefore, installing submarine cables requires much more complex technologies than installing
submarine cables on land. Using high voltage direct current HVDC cables has been a proposed
alternative to using HVAC cables. HVDC transmission cables are not affected by the cable charging
currents and experience less power loss because HVDC does not transmit reactive power. With less
losses, undersea HVDC lines can extend much farther than HVAC. This makes HVDC preferable
for siting wind turbines very far offshore. However, HVDC requires power converters in order
to connect to the AC grid. Both line commutated converters, LCCs, and voltage source converters,
VSCs, have been considered for this. Although LCCs are a much more widespread technology
and cheaper, VSCs have many more benefits including independent active power and reactive power
control. In order to transport the energy from offshore wind turbines to onshore energy plants,
cabling has to be placed along the ocean floor. The cabling has to be able to transfer large
amounts of current efficiently which requires optimization of the materials used for the cabling
as well as determining cable paths for the use of a minimal amount of cable materials.
One way to reduce the cost of the cables used in these applications is to convert the copper
conductors to aluminum conductors. However, the suggested replacement brings up an issue
of increased cable motion and potential damage since aluminum is less dense than copper.
Looking at the video you can also see that these cables are not cheap. It costs up to $400 per foot
which is not cheap. When you consider the hundreds of thousands of miles of these cables currently
crisscrossing the global sea floor, it's not hard to see the massive investment both private
and public. What do you think about this topic? Let me know below in the comments.