Week 11 and our exterior makeover is almost complete! We are moving on to landscaping next week!
If you've ever wondered how people manage a renovation while working full-time, then this channel is for you.
✨ Follow along as we transform one of the most neglected houses in the neighborhood into a beautiful home, one project at a time.
AI Generated·May contain errors
Video Summary
AI Generated
Dani and Ty are renovating a home they bought sight unseen while balancing full-time jobs and caring for their six-month-old baby. The project focuses on balancing quality and affordability with a $75,000 budget. Recent progress includes installing new windows, self-leveling basement floors, and updating exterior details, bringing the home closer to completion.
Welcome to our first blip. My name is Dani. I work in corporate health care and my husband,
Ty, works in construction. So we are going to be doing this as we're working two full-time jobs
and did I mention that we have a six-month-old baby at the same time?
Poor baby Wes had to come along with us Monday night as we went over to the house to finish
putting up the shutters as well as the home numbers. The reason we spray painted those
numbers in the previous video is because I couldn't find them in silver, 10 inches,
and also available in the number one. So we got creative and I bought them in black,
silver spray paint, and did it ourselves. But doing it this way actually saved us a couple
hundred dollars. It's shocking how expensive these house numbers can be, but these ones are
really good quality, just not available in silver. The windows are being installed this week, so I'm
excited to see how that is going to clean up the look of the exterior as well. Obviously,
it looks pretty bad right now since we painted over the windows since we knew they were going
be replaced soon anyways. We did buy this house sight unseen. We had photos that we were able to
reference, but we didn't realize how bad the windows were in the home until we walked it.
So that was the one price with our budgeting that we weren't anticipating and may push us over our
budgeted $75,000 that we're shooting for with this renovation, but we'll see because we're trying to
make it up in other areas. And as far as all the products go that we use for this renovation,
you can find links to them in my bio. Click that, my link tree, and then go to ShopMy. And if you
are new to ShopMy, it's like LTK, but it is a lot easier to use both for the consumer and the
creator as well. So highly recommend it. You can find all the links in there. But we did learn the
hard way as we were installing these numbers that the papers, they line your drill holes up, but
they don't line the numbers perfectly up, at least not the number one. They have the number one offset
a little bit, and we wanted it to be perfectly in the middle of the zero. So this is what they
turned out looking like. Okay, well, we finished, but the ones aren't lined up. The papers didn't
have them lined up with the holes. Yeah, long story short, we'll be moving those, but we got
to go put baby to bed. We got the kitchen hardware. So we've got these knobs. Thinking of doing that
on the drawers instead of a pool. And then these five inches. I'll link all of this in my Amazon
store because these are actually really good quality and they are very affordable. They did
have a good sale though. And then we've got the exterior lights that are going to go on the garage.
And I've also got the island lights that we got off of Facebook Marketplace. So we got a kitchen
sink at the front door, I believe. There are so many moving pieces and parts to this process of
designing a house from top to bottom. And it has definitely stretched my skills, but I have learned
a lot along the way. Trying to prioritize the quality and the look of something, but also making
it very affordable is definitely difficult. I would love to design a house one day for someone
who doesn't have a budget because that would be so fun. Anyways, back to the project. Ty, during the
week, went over and worked on self-leveling the basement floors. When we ripped up the tile,
it's made it very uneven. And in order for the LVP to be installed, it has to be self-leveled.
And this again is where I'm very grateful that he has all of this knowledge and skill to go through,
clean it up, put the primer on, and then the self-leveler, which is always satisfying to
watch back. On Saturday, we did sneak away to Idaho to go visit my mom. We weren't anxious
about it, but when else are you ever going to get to go play with eight puppies? I think I had
mentioned this before in a previous video, but she adopted a dog from the pound. And then as soon
as she took her to get fixed, she found out that she was actually going to have puppies any minute.
And she ended up having eight. So they're all getting ready to go to their rescue fosters here
in a couple of weeks. And they will be up for adoption with Rescue Rovers in Salt Lake City.
If you are interested.
I could have sat and played with those puppies for two straight days, but we were responsible
and we got out of there first thing Sunday morning so that we could come home and work on as many
things in the house as possible. So Ty got to work on sanding and repainting the trim around the
garage. And I stayed at home with the baby and worked on the mantle. It's Sunday. I finally got
the baby down for a nap. And so I am going to do the second coat of stain on the fireplace mantle.
Finally. All right, this is coat number two. It's looking so much better, but I just got the
notification the baby is awake. So we are gonna go get our baby, Clo. Then we headed over to the
house to help dad with the numbers. It's looking so much better. You're now fixing the numbers from
Monday night. What about the exterior lights? Have you pulled those out yet? New windows,
looking so much better. Hi baby. All right, there's been a lot happening this week. So we're
on a quick little tour. That floor has been self-leveled. Front windows are in. Actually, the
windows in the whole house are in and it looks so much better. Let's see. Still working on the fireplace.
Those are all of our cabinets that are delivered. We're just waiting for the one from the primary
bedroom to be delivered. And then they will be installed Monday or Tuesday of this week. That's
the rest of the cabinets. Ooh, the deck also. They were here yesterday doing the deck. That is
supposed to finalize on Monday. That's a really steep deck. And they're supposed to take the
satellite with them. There is a guy coming to hopefully weed all of the backyard next week and
my sprinkler guy is fixing the sprinklers as well. So we'll keep going here. Oh man,
look how much better those windows look. So exciting. New windows here. Bathroom. This has
all been fixed. I don't think the electricity works in here yet, the lighting. So that is
ready for tile here soon. And then let's come into the primary bedroom here. Ooh, those windows
looking so good. And all of this. I love how tall the arch is. I'm excited to build out these
closets. Him and hers. And then the tub. All the plumbing's been fixed. And then this bathroom is
ready for tile as well. So I'm still in love with the arch and I'm so glad that we did it.
It'll look so much better once we don't have that blue door.
Yeah. And once we get those lights switched out. Oh, it's all good. We're done. Yay.
The numbers are now symmetrical and we will be painting that blue door black as soon as
the project's almost done. We're going to replace the hardware as well, but right now we let the
subs in with the door code. The exterior is finally all coming together. And just a reminder
what it looked like before and after. We've already come a long way. The landscaper starts
next week. So that will hopefully bring this whole exterior together. Follow along to see
what we accomplish next week.