AI GeneratedShoyan details the process of installing windows, doors, and flooring for a wooden house. The work focuses on achieving high energy efficiency through continuous insulation and air sealing with specialized tape. The project progresses from securing the exterior openings to completing the subfloor and installing the main entry door, effectively locking up the building for the next phase.
Hello, Shoyan here. The framing is done and now the sheathing is on the exterior walls.
Today, I'm installing the windows and doors around the house. Then I'll be securing the
hardware and moving on to the floor, in that order. In the last video, I finished installing
the sills and said we'd start framing next. But in this video, the framing's already done and I'm
setting the windows and doors. I'm contradicting myself a bit here. Honestly, part of me wants to
put out a video of a wooden house going up, but it's complicated. Anyway, it went up safely and
now I'm moving on to the interior work after the framing, starting from the windows and doors.
For this building, I put insulation between the columns inside and another layer on the outside.
It's continuous insulation. 30 millimeter neoma foam goes over the outer walls, so everything is
built out by 30 millimeters. To match that thickness, I run studs around the opening on the outside
and fit the insulation in between. That's how the insulation works here.
So the glass doors get mounted 30 millimeters out, right on those studs.
Next, I tape the studs I furred out and install the glass door frame on top of that. Once it's in,
I tape over the furred studs and the glass door frame. You really do go through a lot of tape on
one house. Gaps between pieces of wood are bound to open up, so I tape them ahead of time so that
no air leaks out when they do. When tape first showed up, sealing a gap with tape was out of
the question, but as long as it's out of the sun, it doesn't deteriorate. With tape, you can seal
gaps, handle the air sealing, all sorts of things. If we didn't have tape, I don't think we could
build the way we do now. Tape plays such an important role.
These days, window frames aren't aluminum anymore. They're vinyl. The glass is double
pane at the very least, and lately it's gone to triple. But it depends on the door. When a big
sliding glass door has triple pane glass in it, that one door gets incredibly heavy. The performance
is outstanding, but the rollers can't handle a door that heavy. So the big openings get double
glazing, and everything else gets triple. That's how this house is set up.
Now I move on to the floor framing. The beams and cross pieces are already in,
laid out in a 900 millimeter grid. I haven't checked the heights closely yet, so I start
by adjusting the steps and fine-tuning the height. I fasten the beams and cross pieces
with 90 millimeter nails, using three or four nails in each one. Four standard 90 millimeter
nails pull it together nice and solid. The heights came out level throughout,
and the floor framing is done. We don't run joists these days,
so this 90 centimeter grid is the subfloor framing now.
Next, I fit the insulation into the grid. There are clips that hold the insulation up,
so I put those on first. Then I fit in the 75 millimeter insulation.
This insulation came pre-cut, but the sill is 12 centimeters, the beams 105 millimeters,
and the cross pieces 90 millimeters, three different sizes of timber. The combination
changes depending on the spot, so the insulation came in nine different dimensions. They numbered
the pieces, so I worked through them one by one. Trying to cut this on site would never go well.
Pre-cut really is a wonderful thing. The insulation is finally in,
and it really was like a puzzle. Next, I use that same flashing tape on top of this.
This time, it isn't for waterproofing, but rather for air sealing.
With this on, no air moves in or out, and it becomes one with the wooden frame.
Now I can finally lay the 24 millimeter structural plywood for the subfloor.
This is pre-cut too, of course. The columns and studs are already up,
so the plywood won't slide right in at the corners, so I notch those out a little.
The hold downs and anchor bolts stick up and get in the way too,
so I cut around just those parts and lay the subfloor.
It'd be nice if this plywood could be stacked outside the house,
but it's always sitting inside the building,
so I can't do the same job across the whole house in one go.
I adjust the frame on half the house, put in the insulation,
lay the plywood, and then move the stack and do the other half.
I imagine it's the same on every side, but it's a bit of a shame you can't do it all at once.
That said, plywood has made the work so much easier. The floor gets done in a single day.
In the old days, that just wasn't possible for a flooring room.
If there was a tatami room, I'd frame that room first.
Setting joists and laying cedar planks gave me a solid place to stand.
From there, I carried in the tools I needed and worked my way from one room to the next.
With a flooring room, there was no way to frame it and lay the plywood panels in a single day.
Now the whole floor goes down flat all at once,
and with no steps to work around, moving through the house is nothing like it used to be.
Now I install the wooden frame for the entry door.
Materials never all show up at once. I'd been waiting and waiting for this entry door.
In Japan, we call this kind of door frame a sash.
I used to think a sash was only for aluminum and glass, but it seems wooden ones count too.
Over time, they've made these easy to assemble.
Once you put together the two corners on the top
and drive screws into the bottom rail from underneath, it goes right into place.
The sizes aren't off by even a single millimeter.
Carrying it over is the scariest part.
One creak and it's already loosened up.
Even if I push it back together, the screws won't bite anymore.
So the rules are to never jostle it, never bump it against anything,
carry it over gently and set it in gently.
The entry door frame slid right in, but fastening it is a little awkward.
I can't drive a single screw from the visible side.
It has to come from behind, from above, from the side.
First, I set the reveal, then check corner to corner for square and fasten as I go.
The best approach is to fasten only the hinge side firmly, then hang the door.
Once the door is hung, I can line up the opposite side perfectly off the gap around the door.
After that, I secure everything down properly.
The wooden door was heavy too.
It's wrapped in protection, so I can't see the design.
But the insulation is packed in properly, the weatherstripping is solid,
and once I got it fastened, it was more airtight than I expected.
Last, I work on the foundation insulation in the bath and the changing room,
which I hadn't gotten to yet.
When it comes to the area around the bath, floor insulation won't do the job.
There's no way to lay a proper floor around the tub.
So only the bath, the changing room and the washroom
get foundation insulation instead of floor insulation.
The trade-off is that the house needs two access panels, one for each insulation type.
That's one more job on the list.
But this time, I fit the insulation tight on the foundation with no gaps.
So it should work well.
Now the windows and doors, the floor and foundation insulation,
and the 24mm plywood are all in.
The house can be locked up now and moving around has gotten a lot easier.
Next time, I'll move on to the hardware and everything else in order.