Traditional Stone Wall Building in Rural Ireland

Design Ideas
29 followers
2 Video ViewsยทMay 27, 2026
In this video we watch as stonemason Paul Wilmot builds a traditional rubble stone wall.
AI GeneratedยทMay contain errors
Video Summary
AI GeneratedThis video documents the reconstruction of a 350-year-old traditional rubble stone wall in Ireland. Led by experienced stonemason Paul Woodmott and his apprentice Mikey, the project emphasizes the preservation of ancient building techniques, the use of reclaimed materials, and the importance of passing this dying craft to a new generation.
Everywhere we look these days we're surrounded by walls built out of concrete blocks just
like the wall behind me.
Now these concrete block walls are relatively inexpensive, efficient to build and if built
correctly can last multiple lifetimes.
But walls weren't always like this.
Block walls like this were only invented and came into use around the 1900s.
Before this the majority of stone walls were meticulously crafted by stonemasons out of
stone rubble.
So I was fortunate enough to have been given the opportunity to meet a traditional stonemason
and document him as he and his apprentice reconstruct a traditional rubble stone wall.
My name is Paul Woodmott.
I'm a stonemason from Newbridge in County Kildare in Ireland.
I've been building stone for about 30 years now all over Ireland.
I first started in Fountain Manningham, Cowdermacross with a gentleman who taught me to trade named
Charlie Coleman.
So before the demolition was to commence Paul and another man called Larry Creed spent some
time salvaging the old flagstones that were found on the floor within the building.
These flagstones are something special because they were painstakingly cut by hand a long
time ago.
But these will be removed and hopefully used in some other project down the line.
You can see by all the little chisel marks just how much work was gone into cutting these
things once upon a time.
So with the flags saved it was time to prop up the roof.
Although the roof was in very poor condition and destined to be replaced further down the
line that's a job for another day.
So for now Paul and Larry were using these acros to prop up the ceiling to prevent it
from caving in once the wall got demolished.
With the braces in place and everything ready for demolition it was time to bring in the
heavy machinery.
My name is Brian Mahoney I'm a machine driver here with Peckron and Sons.
We're just going to knock the wall here to replace it and build it back up.
This particular job where we rebuilt the wall it was leaned over.
It was originally built roughly about 350 years ago and it was leaned over and we knocked
it down.
Once he had knocked the wall Brian used a specific type of bucket known as a riddle
bucket to remove all the dirt and debris from the rubble and it was then put in a
pile where it was to be reused in the reconstruction of the wall.
So as we just saw it took a few minutes to reduce a wall that had stood for centuries
to rubble.
The reason for this leaning is that there was never any proper foundations put in place
for this wall so this time round although not traditional a proper concrete slab was
to be poured.
The wall was leaned over very badly.
It had come down.
We were trying to save it but it wasn't possible it was too dangerous.
So we knocked the wall down on the first day and then we separated the stones and we dug
foundations and unfortunately we had to use concrete but that's the only non-traditional
thing we used you know.
The wall will stand for another four or five hundred years because of this.
We actually dug a good foundation we had to go down to a good hit good ground before we
poured the foundation and we put in a foot of concrete two metres wide and the reason
being we kept it down low the yard level might be lowered at some stage so we'd still
be showing stone at it.
Yeah we just poured the foundation there for the wall it won't be set until tomorrow so
in the meantime we're going to pick stones here to make three different piles.
One for trying to get cornstones for the wall itself and the rubble then will be the third
pile that will go into the centre of the wall.
The next day then after we poured the foundation the next day we were able to build on it then
set the wall out the wall was two foot two foot an inch wide so we had to square it up
and put up our plumbing pints.
We reused the stone the reclaimed stone and we used lime and sand mix rather than cement
the way it was built actually back then.
The lime we're using it's a five newton lime it's we use it two and a half to one mix so
it's two and a half sand to one lime yeah the reason we use that mix is the lime allows
the wall to breathe where if we built it with cement the wall wouldn't breathe and cause
severe dampness on the inside you know so the wall the dampness goes in the moisture
goes into the wall about thirty percent when it's built with lime and evaporates back out
but when it's built with cement it goes back it goes into the house and causes dampness.
After we knocked the wall down we went about separating the stone the very rough stone
that we wouldn't use with one pile that we were putting we're building up the middle
of the wall with and then the second pile was the stone we're going to build the wall
with the center of the wall and then the corner stones any corner stones we found went into
a third pile so it left things very handy then once we started to build.
I was very fortunate on this job and he's been with me a few months now Mikey O'Halloran
he's only 18 and he has love of stone and he's picked up very very quickly.
His grandfather was a stone mason as well and so obviously he's in his blood but he's a great
young fella he's going to be first class stone mason so watch this space for Mikey O'Halloran.
Mikey you have good time in there I'm just doing an interview here with Owen
after me singing your praises here that's what you call dressing the stone.
So this morning we started off with a flat surface foundation that we poured yesterday
now we have at the moment we have up we're bringing up a 500 millimetre
500 millimetre coarsen we're levelling every 500 millimetres just just finishing off this
one here now so then we come around the back we'll build it back up exactly the same height
we'll infill then with a rough stone that's no good for face work with with lime mixed
through it you know so and then it'll all be up 500 I'll go back on the outside again
back up again another 500 back in again 500 just doing 500 millimetre layers you know.
Unfortunately there's not a lot of stone masons left in the country now there's only three or
four being trained in college at the moment I was very lucky uh trained with my father and
all the time Charlie Coleman and Charlie's 86 now and his father before him was a stone mason
and grandfather and they're all church stone masons but I learned from the right crowd yeah
Charlie I remember telling me a story years ago but when they're building the churches and the
cathedrals in Ireland they um there could be three up to three to four hundred stone masons
working on any church at any one time that's it no mickey forklower all I started
and it could take three and four and five years five years to build but he told me a story one
time that there could be chiseling a stone one stone all day long and come to the last chisel
at the end of the day a crack come coming out and the whole day was gone and it was a regular
occurrence this was seemingly unfortunately uh it's a dying trade stone mason it's there's at
the moment there's only three young apprentices in college uh learning the craft there's probably
another 20 around the country and I might be exaggerating a little bit but I would hope
there's at least another 20 around the country learning as well but uh there's very you're
very seldom come across a 40 or 40 row stone mason we're all 60 upwards we're very fortunate
and he's big into the old way and it's just an awful pity there's not more like him around the
country yeah the client reckons the building today is back to 1660 1670 and uh it's a fantastic
condition for a building so old and Charlie Coleman mentioned earlier on about the man
that served me time but he was telling us the stories years ago with the come back 100 120
130 years ago and longer probably that they had a secret mix with the lime and the sand
and everybody used to be trying to find it out but the stone mason always kept the secret to
themselves yeah we're putting in a profile for the window here now that's it that's the
opening for the profile so after lunch at some stage set the profile in and we'll build it we'll
build the stone to to the profile I got the carpenter on site to make me up timber profiles
so very very handy to keep that keeps everything uh spot on plumb all the corners just done the
window reveal here and it's a bit tricky because we have an eight inch eight and a half inch piece
you know it's about 220 mil and um we have knee two square sides on it and because they're all
reclaimed stone it's extremely hard to get you know we just have to keep looking for them it's
going to take a bit of time but we'll get there you know we'll make it out there in a moment
picking through the big pile of uh reclaim stone out the back you know there's about five
yeah I think you're going to be up there all day just to get this section done you know
the window as you can see there is lower than it's going to be we we weren't giving it
definite heights for a window for head heights so uh at the moment it's just that it might be
a bit low we'll have to add on to it when we get when we get the heights off the engineer once you
get the heights then there'll be specialist carpenters joiners hired to make a casement
window first so the window will look to as if there are two or three hundred years as well
after we hit about 1500 millimetres or five foot approximately in height we we had to uh erect a
scaffold a safe scaffold obviously for himself and apprentice Mikey to walk off you know
that was a straight wall before this with only one door now we have a 10 foot door a four foot
door and a window the window obviously the client wanted to get light into the into the room you
they'll eventually take this roof off and they're going to put on a a traditional timber roof with
with old slates they're using what's called a blue banger slate and obviously the stonework
will have to take a level and stonework will have to be level from one end to the other so we'll
have to be raising these walls up slightly and then get to get ready for up to wall plate level
for the carpenters after just another day on site Paul and Mikey had finished this section of wall
for now although this wall took several times longer to build than its contemporary counterpart
what it lacks for in efficiency it makes up for in physical appearance it was truly wonderful to
watch as age-old skill and hard labour were used to rebuild this centuries-old wall back to its
former glory after we finish this job we always head up to the pub it's after every section it
could be every two or three weeks we end up going up to the sportsman's here and that or that for a
but for the ever-in-demand stonemason the work never stopped with locals of Agherla town
soliciting work off Paul even while he rests
although a ruin of its former self with men like Paul still practicing
and men like Mikey still training the future for traditional stonemasonry is rock solid
