The 2nd Day of the Lavacrete Utility Lodge Workshop sees Jon experimenting with full wall debossing, Guru Das explaining window installation, and a fantastic lecture from Paul Schwam, the OG of Lavacrete!
SECTIONS // 00:00 - Good Morning! 03:24 - Let's Get to Work! 4:45 - Crazy Mountain Idea 7:40 - Lavacrete Window Form 9:18 - Paul Schwam Lecture 22:52 - Lavacrete Garden Bed Workshop 25:00 - Where Does Lavacrete Go From Here? 27:42 - Lift 3 Forms
Hey, it's day two of the Lava Creek Utility Lodge workshop.
If you've ever wondered what goes into making a workshop,
there's a lot of stuff that goes on behind the scenes.
And so we're up early this morning before most everyone else,
except for Isaiah, he's up helping.
We're making window forms because hopefully we're putting window forms in today
and we don't want to slow everybody down.
Now we are going to still talk about how to build them and kind of show people how it works,
but if we were to sit here and like build these window forms while everyone's watching,
it's not the best use of time.
So Gurudas and Isaiah are working on that this morning.
And then I have a crazy idea for some art stuff on the south side of this building
that might mimic some of the mountain range here.
So I'm going to work on that and see if we can make this happen.
If it doesn't, I'm okay with it, but it's a pretty cool idea.
I'm going to try to make it happen.
Morning. How you doing?
Ready to get dirty.
You want to see my crazy idea?
Let's do it.
It's going to be messy, you know?
Like a frame almost.
Good.
Welcome to day two of Vloggery Workshop.
We have some new faces here today.
We're glad you guys are here.
We've made really good progress yesterday.
We got about a lift and a half finished.
And so today we're going to keep going up.
We have some fun art stuff that we're working on.
I think windows are probably going to go in, hopefully, depending on how fast we go.
Yeah, so it's going to be fun.
Here's what we're doing.
Hi, Paul.
Everybody, this is Paul.
That's the exciting part.
It is bigger than me.
We evolved around it.
It has all these hidden things that it knows that we don't know.
And I've got a 7-day, a 14-day, a 28-day, and a 56-day cylinder that I will crush.
And then during the construction of the building, I will also label and squirrel away my own samples
so I can test them throughout my lifetime.
Because I want to know.
And Paul wants to know, too.
So in the future, as you're experimenting, we must stay connected so that we can share notes.
And it's really important to have data available for other people.
And when we share communication across international borders,
it is a very positive thing for humanity and the entire planet.
And so 6 to 1 today.
Tomorrow, it could be something else.
So let's get to work, you guys.
All right.
Day 2 of the Lava Creek Workshop.
The pre-work is done.
Now everybody's here and we're getting going.
I am still working on this crazy mountain idea.
I think we're almost there.
We've got to get that installed on this lift so that we can keep going up.
And people are kind of waiting to fill that part of the building.
So I've got to get some stuff.
Hopefully, this is going to work out.
So, I don't know.
What happened at the end?
Ready?
Go ahead and put it up to our marks on the inside.
I can get to this side first.
I'll let you go first.
Because this one you drew, like, really nice.
Go for it then.
All right.
The bottom of the plywood is to that line, right?
Yeah.
Perfect.
You got it?
Got it.
All right.
Set.
Beauty.
I'm just going to go down the line here.
So, why are you installing the window like this?
So that we can get lava in here and tamp the sill from the inside real nice.
So there's no bottom on it.
There's no bottom on it.
Looks pretty good.
Yeah.
I think that one is good.
It's percadent level too.
Okay.
Great.
I'm just going to hold it.
Move that next one over to my line.
Go ahead.
All right.
Going.
Bottom.
Oh, okay.
Never mind.
Bottom.
Oh, yeah.
It's going to be from that pile.
Don't have to put it in whatever dimension.
Okay.
Keep going.
Well, actually, no.
That's too far.
Come back.
I got to explore the whole city.
A little bit more.
Yeah.
A little bit more.
Right there.
I actually went to triangular school.
That's it.
Lava in the middle of the car.
Yeah.
All right, guys.
I hope everyone had a delicious lunch.
Ashley had to go get more food, but I would just like to say, how good of a cook is Ashley?
Yeah.
All right.
We are excited that Paul is here.
I don't know Paul that well.
We hung out one day and I filmed an interview with him.
There's a ton of stuff I have no idea what he's going to talk about.
I'm excited to learn with you guys.
We're really honored that he took the time to come out here and to talk to us and share his story.
Other than Randy and Rollo, you guys are sort of the OG Lava Creek guys, right?
He's been doing this a really long time.
He's got a ton of knowledge and a ton of experience.
We're just really thankful that he took the time out to come and talk to us and share with us.
Thank you, Paul.
Yeah.
The floor is yours.
You're free to talk about whatever you want.
I'm glad to be here.
This has been fun for me, too.
These guys and Guru Das.
I figured at some point I've been wanting this to catch hold.
Guru Das is probably a great example of that.
He's completely independent.
Whatever the problems are, he fixes them.
He ends the story and moves forward.
It's great.
I like seeing what happens if I'm not managing it.
This started for me in college.
A guy named Randy Ewers is another architecture student.
His father was doing some scoria.
He called it scoria.
Scoria is the word for lava.
In New Mexico, they call it scoria.
In Arizona, they call it recinder.
Anyway, he was doing that.
When we both graduated, he built a house.
That was actually my first hands-on experience.
There was something about this that I thought was terrific.
It was messy.
He built the whole thing in one-foot lifts.
It was primitive, but it was solid.
I just thought, man, there's something here.
When I graduated, I thought,
let me just apply some basic concrete other technology to this.
Over the years, I ended up building a machine
that would create this cement.
It's exactly the way I want it.
Dial it in.
I was looking for something that would give me a continuous mix
rather than a batch.
I wasn't even thinking about it.
Step-by-step, working my way,
I've tried augers, different kinds of conveyors,
rented equipment, ruined those.
People wouldn't rent to me anymore.
It's been a long history.
I ended up having to build these monstrosities,
a machine that's bigger than a truck.
Anyway, I'm an architect,
but I spend an amazing amount of time welding.
Just this stuff.
Then throwing it away because it wouldn't work.
That's, I guess, just part of the process.
Over the years, I think it's gotten fine-tuned.
I don't brag about what I do typically
because it's just, I think now, barely getting ready to scale.
I've tried pumping it.
A quarter-inch trough wears out in two days.
It is that abrasive.
This fits.
It's designed to fit into the plain concrete code.
Plain concrete means typically, usually it's not reinforced.
It's not the Adobe code.
Plain concrete is kind of where concrete started
years and years and years ago.
The entire building codes are probably built around concrete as a material.
There's an awful lot of specs on plain concrete,
but no one ever uses it because we've moved on to other things.
I'm using it.
It's there for me to use with all the engineering,
and I'm using it.
Now, I can go to Adobe code.
I mean, the material is just, it's an aggregate and cement,
and you can try all different kinds of binders
for ecology reasons or whatever.
I'm using concrete as a placekeeper,
not because I love it,
but because my business is the sandcastle business beyond that.
But all that can still fit into the building code in a variety of ways.
For example, if I were to go with the Adobe code,
because you don't need a lot.
You need way less strength than this stuff.
The walls tend to be so thick that there's a lot of support.
Either way, that still is a spec concrete.
So within the code, that works for me in most cases
because this stuff is just already strong.
If I need to get a long span,
then I'll put a lot of steel in there,
and that section will fall into the reinforced concrete code.
There's actually no difference to me and the crew,
except you've got to put the steel in there.
I put rebar in at 48 on center, vertical, and horizontal.
I do a lot of that just because I can connect conduits to that.
It's the mandrel to make everything,
sort of the work beyond that work a little.
So the inspector gets there.
He sees the steel, everything that I need for the entire job.
Ordinarily, taking an inspector, that's like three visits.
Minimum, probably.
And that's just on one section.
I can get all that steel in.
He makes one inspection, check, walks away.
He's happy. He knows all the steel is going to be there.
Whether it's reinforced or plain concrete, it's all there.
I don't want the inspectors on my job either,
but anybody with a clipboard, it's dangerous.
I've never had a problem getting into the building code.
It scares everybody.
New people who have never seen it,
but once they look at the engineering,
and the engineering says,
oh yeah, well, 1,000 psi, we've done this before.
It's engineered, get it tested.
You know, this jurisdiction doesn't have a problem with it,
and they know all about it.
There's another thing that I have to explain to some building codes.
If you have a wall that's, I guess it's more than 10 inches thick,
you have to have two mats of steel, inside and outside.
Lava does not shrink like regular concrete does.
All that steel is really to manage the shrink cracks.
I don't have a shrink crack problem,
so only one mat is all I need.
Quite often, I'll do a wall this thick,
with one mat of steel.
I tell the engineer to mark the inside foot,
and the outside eight inches, or whatever.
I just say, that's sacrificial.
We don't need to have it here.
You can do arts, you can do nichos, you can do whatever.
You can turn that into whatever art wall you want,
because it's sacrificial.
Do you make it that thick for thermal value?
I make it that thick for thermal value, primarily,
because I'm kind of into the sustainability thing.
If it's not sustainable, I'm not really interested,
frankly, from my design standpoint.
I think that those thicker walls,
well, they automatically, a 24-inch wall,
a university did a test on one,
and they built a house using my machine.
I think it was only an 18-inch wall.
Did they put a sheet of foam in there?
I think they did.
But because the university did it,
they went ahead and put some thermal sensors on there
to find out what the temperature was going on with the walls,
and what the inside temperature and the outside temperature was.
And they showed me the data,
and the inside temperature of that house in the summertime
changed three degrees in 24 hours.
Now, that's kind of the Adobe flywheel effect,
sort of on steroids.
I'm not even trying to be sustainable, necessarily,
and I've already made that marker.
That means that three degrees means
that you don't chase the power day to night, day to night.
You know, there's a 30-degree temperature spread
on the average, this convective temperature,
air conditioner at any one.
So what that means is, at least half the year,
you don't have an air conditioning bill
because you're just averaging the day and night.
One of the things I'm working on right now is,
okay, I got that part.
Now, let's get the yearly.
I want to go summer to winter.
I hope to stick within two feet,
use the porous walls, blow in some air at night in Arizona,
and cool those walls down
and have it flywheel through the next day.
And if I could sort of trickle charge these walls
in any 24-hour period,
because I get these intense day, night, hot, cold cycles,
that's kind of one of my objectives
before I run out of runway,
is to get that demonstrated that it can be done.
I'm trying to develop logistics of how do you turn that,
how do you create a construction process
that work into the next millennium?
Because what we have is not going to work.
It's not working now.
This process reverses the whole construction process.
In other words, if you build the forms
like you're doing for in there,
you can put any kind of anything in there,
like plumbing, whatever, cavities if you want to.
You just put that wherever you want,
unobstructed by most anything else,
and as you fill it with the material,
the material is the self-detailing in a way.
Gravity does most of the work.
You haven't seen the old man time,
but there's a picture, a slide,
of an old man's face.
It's a carving.
I took a photograph in Mexico
off a door in Mexico City,
and I blew that up into a larger image,
and I cast that into everything I do.
Just sort of adding a soul to the building.
Poetic way of thinking about this,
because it's going to be there a long time,
longer than the rest of us.
It's your signature.
It is a signature for me,
and so I cast that in ice,
just the face,
and put that into the wall,
and so I know it's there,
and I can find it by just,
there's a little bit of a ring,
when you hit the wall,
and so I do that.
Could you talk a little bit about,
when I was at your place,
you showed me a few different samples
with different binders
that you were experimenting with.
Could you talk a little bit about that?
Because I know everyone is also interested
in other ways to do it,
other than Portland cement.
Well, there's a lot of different binders.
Portland cement is just one
that's popular.
I guess in the very early stages
of my work,
one of the things I found
worked pretty well,
and I've mentioned this before,
is skim milk.
If you take dirt,
and you soak it in skim milk,
and you let that dry,
it dries darn hard.
The problem is that,
yeah, you've got milk now.
The problem is that cows
will come up and lick the walls.
So, I mean,
I think they actually used it
way back in the day.
One of the things,
that's because it has a lot of casein in it.
One of the ones that I have
a lot of confidence in,
that I like the most,
is called ferroc.
Ferroc essentially takes
waste steel dust,
and it converts it into iron.
As it converts from this
waste steel dust
to this high-grade iron ore,
it absorbs CO2.
It takes a little water,
and there's a reaction.
It's different than regular cement.
It's iron.
It's a little heavier.
It's chocolate brown.
I have some samples here,
and I'll bring them out.
One of the reasons I like that
is really for the poetry.
How we got steel in the first place
was starting with iron ore,
and then we add coke to that,
and you blend that together,
and you get steel.
And one of the waste products
is CO2 gas.
So here we are.
The fact that this reverses
that process by absorbing CO2,
it's exciting to me that
there will be a lot of things
out there that are going to be
better than Portland cement.
Do you change your binder based on
whether it's a default colder
environment versus hotter,
or less humid, or more humid?
No.
Strength would be probably
what I adjust it for.
I have a mix where I'm keeping
1,000 PSI for a couple reasons.
One is I can treat the entire
building like as if it was
just solid wood,
and make connections to that
with large lag screws.
Hey, Future Jonathan here.
If you're watching this video
and super bummed that you missed
the Lava Crete Utility Lodge
Workshop, well, guess what?
We're announcing the Lava Crete
Garden Bed Workshop,
May 2nd and 3rd.
Is it super last minute?
Yes, it is.
Are we doing this because we had
such a blast with Paul and
Guru Das that we just needed
to hang out with them again?
Also yes.
But here's the really fun part.
Turns out Lava Crete isn't just
great for walls, it might also
be the best way to build
raised garden beds in the desert.
Who knew?
Well, Guru Das did.
He built 17 of them at their
headquarters in Phoenix based
on their own research,
which is really cool.
There's a bunch of reasons that
Lava Crete is so great for garden
beds, and of course we're going
to get into all that during the
workshop, but the basic idea is
really the porosity of the
material, right?
It makes sure that the root
doesn't get too hot or too cold
depending on the season.
Also, it allows the soil to be
able to provide your forms.
The result is absolutely beautiful.
We're going to be building some
Lava Crete garden beds during
this weekend workshop, but I know
a lot of you have also been
asking, can you plaster with
Lava Crete?
Well, not technically.
It's more of a wall building
system.
It's not a flowable plaster.
However, we're going to
experiment with a way to clad a
Hyper Adobe wall with Lava
Crete during this workshop as
well.
This building finished before
anybody else.
It's way too good.
And of course, Paul and
Gurudas are going to be here on
site again.
They're both incredibly busy.
They're the only ones doing
Lava Crete right now, and their
inboxes are overflowing with
requests.
If you want the opportunity to
spend one-on-one time with both
of them and ask questions and
get answers quickly, this is
going to be your best shot.
So come build some Lava Crete
garden beds with us May 2nd and
May 3rd.
You can sign up at tinyshinyhome.com
slash events.
Now let's get back to the
current workshop.
What is the ideal when you
release it?
And, you know, say people here
carry this forward and out in
some way, right?
What is the ideal way to carry
it forward in your mind?
But then also, what are the
things that you distinctly are
trying to avoid?
How do we steward it well?
You know, I don't have a real
clear answer to that.
What I can say is that
building a conveyor, a rolling
conveyor, as just
that single piece of equipment
that can be rented or, you
know, used by guys like
Guru Das to build
will take so much of
the work out of doing this
that I think people are going
to be interested.
I think I told you I'd like to
make construction, you
know, four parts fun and
one part hard work rather
than the other way around.
Other than that, trying
to come up with some
guidelines for people
like you guys who are
kind of, frankly,
inspiring to me that just
your energy and your
willingness to do this.
So I don't know exactly how
this is going to roll out,
but I think making
it easier for any
grouping, any
two or three people to be
effective.
Just after talking to this
crowd, it almost feels like
build it and people will
come, you know, they'll be
interest.
So I'm excited about that
concept just based on
the energy I feel from you
guys.
I think that my job
in that case will just be
available.
Try to support
the spontaneous builder
group types.
I think it seems like the
time is right.
You know, I mean,
these guys are kind of
pushing me into this.
Damn it, I got to do this
right now.
But it's a good problem to
have.
And I mean, I knew this
would come.
I mean, I could see this
coming and I'm trying to
keep a low profile so I
don't have to talk to
people too much about
what I know the most about,
which is the failures.
And this might be it.
And I, you know,
someone taught me I
didn't invent this.
So I've had my
might and you guys are
next.
I'm looking forward to see
how that works.
This feels like
the foundation
for moving
forward.
Yeah.
I mean,
we're starting something.
It's always his fault
whatever happens here.
You might see my picture
around, but I wasn't
there.
Paul did not approve
this.
All right. So we just
finished up a really
great talk from Paul
Schwamm.
We spent all afternoon
just learning about
the history of
the experience of
Lava Creek.
And people asking
a ton of questions
was really good.
But we have to make
sure we get
lift number
three, all of the
boards in place so
that we can start
pouring tomorrow
because we want to
make sure we have
plenty of time to get
this done.
So we're working here
a little bit late this
afternoon, trying to
get the rest of these
forms in so we're
ready to go.
So wish us luck.
11 and 3 8.
Of course.
Yeah, let's pull apart.
Something.
Where does it all
go when you throw
it away?