Vietnam Is Trying to Grow at 10 Here s the Problem

Global Finance News
11 followers
Apr 9, 2026 #finance #financement
Vietnam is attempting something that most countries do not even try.
It wants to force average GDP growth of at least 10% a year from 2026 to 2030.
This is not just a hopeful projection from economists or a finance ministry target that
might quietly be missed. It is a formal political mandate written into the Communist Party's
national plan. And it is tied to a very clear finish line, reaching around 8,500 US dollars
in GDP per person by 2030. That is an extraordinary goal.
In rich economies, 2 or 3% annual growth is considered strong. For developing countries,
5 to 7% over several years is already impressive. But 10% is different. Because of compounding,
an economy growing at that pace would roughly double in a little more than 7 years.
Vietnam is trying to compress decades of development into one political period.
It is trying to move from lower middle-income status into the upper middle-income tier by 2030,
with the longer-term goal of becoming a high-income country by 2045.
But there is a major problem with setting economic policy by political order. A government
can demand growth on paper. It cannot order electricity to appear in a strained power grid.
It cannot order foreign governments to keep their markets open. And it cannot instantly
turn a cautious bureaucracy into a fast, risk-taking machine.
Yet in 2026, Vietnam is trying to do all of these things at once.
The reality of the Vietnamese economy is not one simple story of a rising Asian tiger.
It is really three separate systems moving at the same time and often crashing into one another.
First, there is the huge export and factory expansion caused by the global China plus one
shift. Second, there is an overburdened power system struggling to keep up with industrial
demand. Third, there is a deliberate state effort to reduce two major risks at once,
property debt at home and tariff pressure abroad. Vietnam is not starting from zero.
That is what makes the 10% target so difficult. Over the last two decades,
the country has already built one of the most successful industrial growth stories in the
developing world. In 2025, its economy grew by 8.02%. Exports reached 475 billion US dollars.
Of that, 153 billion dollars went to the United States alone. Because Vietnam buys much less from
America than it sells there, it ran a trade surplus of nearly 134 billion dollars with the
US in a single year. Those numbers show the strength of Vietnam's export machine. But they
also show its biggest weakness. When a developing country runs a surplus that large with the United
States, Washington notices. American politicians, regulators and manufacturers start asking hard
questions. By 2026, the risk of US retaliation was no longer theoretical. Washington was
considering broad tariffs of 20% on Vietnamese goods. Even more dangerous was the threat of a
40% penalty tariff on goods judged to be part of illegal transshipment schemes. That matters
because the United States has often not made its exact rules fully clear. Exporters are left
That uncertainty is enough to freeze investment decisions and make factories nervous. It wants
to become a higher-value manufacturing base for semiconductors, consumer electronics and electric
vehicle parts. It wants to do that without losing the export engine that still provides jobs,
tax revenue and foreign exchange. Investors like the direction, but many analysts and institutions
such as the World Bank have warned that a politically ordered 10% growth target is far
above what the economy is likely to deliver in reality. Still, in early 2026, the party formally
put this target at the centre of its 2026 to 2030 plan. Vietnam must become an upper-middle-income
country by 2030 and a developed high-income country by 2045. The political message is clear.
The harder question is whether the state system can actually deliver it.
To understand Vietnam's 2026 strategy, you have to understand the state itself.
Land must be cleared. Permits must be approved. Budgets must be signed. Contracts must move
through ministries and provincial offices. If those approvals do not happen, growth targets
do not matter. That is why Vietnam has been restructuring its government machinery.
In 2025, major proposals were pushed forward to merge powerful ministries.
The Ministry of Finance was set to absorb the Ministry of Planning and Investment.
The Ministry of Construction was to combine with the Ministry of Transport.
These are not cosmetic changes. These are giant, bureaucratic engines that manage huge budgets
and major national projects. The goal of merging them is simple – reduce overlap,
cut layers of approval and get projects moving faster. There were also major provincial and
commune-level reorganisations passed by the National Assembly in 2025. The logic behind
all of this is speed. If a project has to pass fewer desks and collect fewer signatures,
it gets built faster. And if Vietnam wants double-digit growth, it needs roads, ports,
power lines and industrial parks built quickly. But this push for speed did not come from a
healthy starting point. It came from years of paralysis. The main reason was the anti-corruption
campaign known as the Blazing Furnace. This campaign punished thousands of officials,
executives and business figures. It raised the cost of corruption dramatically. But it also
produced a side effect – fear. Officials became terrified to sign anything. If a procurement deal
was later questioned, if a project looked too favourable to one company, or if any financial
error appeared in hindsight, careers could be destroyed and prison could follow. So many
officials stopped taking risks. They delayed permits. They passed decisions to other departments.
They asked for more reviews. They left money unspent because signing off on a project felt
more dangerous than doing nothing. This became known as the fear of signing. And it became a
real drag on the economy. International donors said Vietnam had lost at least 2.5 billion US dollars
in foreign aid over several years because projects were frozen by administrative paralysis.
Another 1 billion dollars was reportedly sitting there waiting for approvals that nobody wanted
to give. The problem was even worse with domestic public spending. Roughly 19 billion US dollars of
planned public funds reportedly failed to be invested between 2021 and 2023. The money was
allocated. The needs were obvious. Roads, bridges and power projects were waiting. But the state
apparatus did not move. That is why the 2025-2026 streamlining drive matters so much. It is not just
about better management. It is about restarting the state's ability to act. Vietnam cannot hit
10% growth if capital remains trapped in the treasury while infrastructure projects sit
unapproved. This also explains why the government is now leaning so heavily into hard infrastructure.
By late 2025, Vietnam had launched 234 major infrastructure projects with a combined value
of around 3,400 trillion dong, or roughly 129.4 billion US dollars. That is an enormous amount,
equal to roughly a quarter of the country's annual output. Only about 18% of this was directly funded
by the state. The rest depended on private and external capital. So the state's strategy is not
just to spend. It is to use public action to unlock much larger pools of private money.
To help finance the push, the government planned to raise 5.5 billion dollars in foreign loans
in 2026 and laid out a new official development assistance strategy that aims to attract up to
38 billion dollars between 2026 and 2030. That is another sign of how serious the state is
about turning political mandates into concrete. On paper, the formula sounds simple. Merge
ministries. Cut bureaucracy. Unfreeze capital. Build infrastructure. Stimulate the economy.
But it is not that simple. Vietnam quickly runs into two hard limits that no political slogan
can remove. The physical limits of electricity and the geopolitical limits of trade.
If you want to know why Vietnam is pushing so hard, look at the global factory map.
Vietnam has one major advantage that very few countries can copy. Its northern border sits
right next to southern China, one of the densest manufacturing ecosystems on earth.
For decades, global manufacturing was concentrated in China. But rising wages,
pandemic disruptions, and the US-China trade war pushed multinational firms to search for a second
base. They wanted to diversify without leaving Asia's supply network. Vietnam became the natural
answer. A company can still source parts from China, truck them across the border, assemble
them in northern Vietnam, and export the finished goods globally. That allows firms to reduce tariff
exposure and political risk without rebuilding their entire supply chain from scratch.
Countries like India and Mexico have many strengths. But for China-linked Asian manufacturing,
Vietnam's geography is hard to beat. That is the real meaning of China plus one. It is not theory.
It is factories moving, contracts shifting, and supply chains being physically redrawn.
In 2025, Vietnam's exports rose by 17% to $475 billion.
Foreign direct investment inflows reached about $27.6 billion.
Some of the world's biggest tech companies are no longer just experimenting in Vietnam.
They are expanding heavily. Apple significantly increased its spending with suppliers in Vietnam,
reaching around 400 trillion đồng, or roughly 16 billion US dollars.
That investment reportedly supported around 200,000 local manufacturing jobs.
Foxconn, one of the key contract manufacturers behind the iPhone, moved to expand mobile phone
production capacity in Vietnam from 30 million units a year to 140 million. The company also
sought approval to produce up to 4.8 million Xbox consoles per year in the country.
Samsung Display committed $1.8 billion to an OLED screen plant in Bac Ninh.
These are not small trial projects. These are signs that Vietnam is becoming deeply
embedded in advanced electronics manufacturing. But a factory boom only works if logistics can
keep up. High-volume electronics exports need roads, ports, airports, and industrial zones
that function smoothly. You cannot build 140 million phones and then move them on weak highways
or overcrowded freight routes. That is why expressway construction is treated almost
like a national security issue. By the end of 2025, Vietnam expected to complete 3,188 kilometers of
expressways, rising to 3,513 kilometers when major connector roads are included.
That network is critical. It lets parts come in from China, flow into industrial parks,
and then move to seaports or airports fast enough for just-in-time manufacturing.
Air freight matters too, especially for high-value electronics.
Vietnam's biggest new aviation project, Long Than International Airport near Ho Chi Minh City,
is meant to ease pressure on over-capacity existing airports and become a major logistics hub.
The government set a firm target for Long Than to begin commercial operations in the fourth
quarter of 2026. It has been treated almost like a wartime deadline. Vietnam is also trying to
strengthen its domestic economy, so it is not fully dependent on foreign demand. Retail sales
rose by 9.2 percent in 2025. Inflation stayed relatively controlled at 3.31 percent. Average
monthly income per person rose to about 5.9 million dong, up 9.3 percent from 2024.
A growing middle class is buying more services, more transport, and more consumer goods. That
matters because a healthier domestic economy gives Vietnam some cushion if export demand weakens.
Still, the gap between the political target and likely reality remains obvious. Many analysts
think 10 percent is unrealistic. The World Bank's forecasts sat far below that level.
So why set such a high number if leadership knows the math is difficult? Because the 10 percent
target is not only an economic forecast. It is a political tool. It is a forcing device.
It gives the leadership justification to merge ministries, push bureaucrats to approve projects
faster, and demand faster delivery from the state system. It replaces one fear with another.
Instead of fearing the consequences of signing documents, officials are meant to fear failing
the party's central mandate. It also gives cover for painful reforms. The state can tighten credit
to property, push uncomfortable changes in power pricing, or demand administrative restructuring,
all in the name of national growth. The target is not just a number. It is an instrument of state
control designed to break inertia. But the 2026 economy will only be as strong as its weakest
links. And Vietnam has three of them. The first is the electrical grid. No modern industrial
strategy works without power. Vietnam learned that in June 2023, when severe blackouts hit the
northern provinces. Factories shut down. Assembly lines stopped. Workers were left idle. For a
country selling itself as a reliable production base for global electronics, this was a serious
warning. The pressure has only grown since then. Electricity demand in 2025 was expected to rise by
10.5 to 13 percent from the year before. In a country moving toward electronics, industrial
parks, and energy-heavy production, power demand can rise even faster than GDP. If Vietnam really
chases 10 percent economic growth, the strain on the grid becomes enormous. In response, the state
has rushed out emergency upgrades. One of the most important is the Quảng Trạch to Pho Noi
500-kilovolt Circuit 3 transmission line. It stretches 519 kilometers across nine provinces
and costs nearly 880 million U.S. dollars. Its purpose is simple but vital. Move power from
parts of the country where generation is stronger to the north, where industrial demand is greatest.
But transmission lines do not create electricity. They only move it. And that leads to the deeper
problem. Generation. Vietnam's renewable energy sector became a warning case in policy instability.
More than 170 renewable projects reportedly stalled because the government changed the rules
around subsidies and payment rates. The original boom had been driven by feed-in tariffs,
which guaranteed attractive prices for solar and wind developers. The policy worked. Investment
poured in. But once officials worried that these contracts were becoming too expensive
for the state utility, and once investigations into earlier approvals began, the government
retroactively cut support rates. That is one of the worst things a state can do
in infrastructure finance. Renewable projects are built using long-term debt models. Banks
lend on the assumption that revenue rules will remain stable. If the government later
cuts the price it will pay, the whole financing model can collapse. That is exactly what alarmed
investors. By 2026, this had become a major legal and diplomatic problem. Foreign business
groups warned that investors were considering legal action against Vietnam. The projects tied
up in the dispute reportedly represented around 12 gigawatts of capacity. That is a huge amount
of electricity for a country that badly needs more supply. So Vietnam's power problem is not
only about engineering. It is also about trust. If investors do not trust the rules, they will
not finance the next wave of generation. The second weak link is property. In fast-growing
Asian economies, property often turns growth into financial risk. Easy money flows into real estate.
Prices detach from incomes. Developers borrow heavily. Banks become exposed. When the bubble
bursts, the damage spreads through the whole economy. Vietnam's leadership looked at China's
The strongest symbol of this crackdown was the case of real estate tycoon Truong Mai Lan. She
was sentenced over a huge fraud case tied to Van Thin Phat Holdings and Saigon Joint Stock
Commercial Bank. The message was unmistakable. The state would not tolerate financial excess
and systemic fraud in the property sector. That had a strong chilling effect. In 2026,
instead of trying to inflate growth through a new real estate boom, the State Bank of Vietnam cut
its credit growth target to about 15%, down from around 20% the year before. Banks were told to
tighten risk controls, especially for property lending. At the same time, the government began
preparing tax measures aimed at reducing speculation after home prices reportedly surged
by 20-30% in the previous year. This is careful long-term policy.
The state wants money going into factories, technology, and infrastructure, not empty
apartments and leveraged land bets. But in the short term, this also means Vietnam is
deliberately choking off one of the traditional engines of fast GDP growth. Real estate booms
are dangerous, but they can temporarily make economies look strong. Vietnam is choosing not
to use that shortcut. The third weak link is the hardest to control. United States trade policy.
Vietnam's economic rise depends heavily on selling goods to America.
But that is exactly why Washington is watching it so closely. Vietnam imported 186 billion US
dollars worth of goods from China while exporting 153 billion dollars to the United States.
That trade pattern is the reason American officials suspect Vietnam is being used as
a transshipment hub. The issue is value-added production. If Chinese parts come into Vietnam
and are genuinely transformed there into a new product, that is legitimate manufacturing.
But if goods are only lightly processed or relabeled before being shipped to the US,
Washington may call that trans-shipment and hit them with tariffs. The problem is uncertainty.
Exporters do not always know where the legal line really sits. A factory can invest heavily,
hire workers, assemble products, and still face the risk that US customs decides the
Vietnamese value-added content was not enough. If that happens and the 40% penalty tariff is applied,
profit margins vanish instantly. Vietnam has responded by tightening enforcement. It has
increased checks on origin fraud, stepped up inspections, and pushed customs officials to
review the paperwork and movement of Chinese components more carefully. The country is
trying to prove that it is a real manufacturing base, not a simple relabeling station.
