What's next now that the bond beam is done? We're searching for roofing materials, prepping for the lavacrete utility lodge, and starting a side project we aren't sure is going to work.
Good morning friends. Today's video is all about what happens next now that we have finished building
and pouring and strapping the bond beam on the hyper adobe roundhouse. We're searching
for bar joists for our roof, finalizing the plan for the lava creek utility lodge, and starting a
side project that may not work out the way we hoped. Welcome to another day on the tiny shiny
homestead. So we're on a small uh side quest. We're looking at bar joists for the roof. Yeah.
So we are all the way in New Mexico. Not too far but you know. We got we got a we got a hot tip
on some bar joists so we are going to go look at them and see if they will actually work before
we commit to anything. Yeah. So yeah wish us luck. We'll see how it goes. If they do work then we
got to figure out how to get them to the homestead which is a whole other problem. Yeah. But we'll
get to that. Let's just go and see if it's gonna work. Yeah. So there's a lot of bar joists here.
Yeah they're like 50. Yeah 50 bar joists. They're bigger than what we need. Watch out that's sharp.
Uh they're 32 inches tall. We really only need 20 inches but they're long enough to where we can
cut some of them in half and do one half of the building and then cut a little bit off the others
and do the big long spans. They're they're heavier duty than we need but it's going to be hard to
find this size bar joists at the price that we're looking at. They're a little rusty. We got to clean
them up but I think this will work. The question is really logistics. Are we going to be able to
move them and get them back to our place? What do you think? I think it'll all work out. Okay.
So this may be our bar joists guys. Might be. It might be. So basically that was a
three and a half hour drive for a 15 minute conversation. Well we needed to see them. We
did need to see it. You know the pictures just don't always tell the whole story. Yeah and you
just really want to look them over and make sure there's nothing too structurally wrong with them.
So I think they look pretty good. It's obviously going to be a whole lot of work but like cleaning
them up and everything but. Sure but I mean you only need to clean up the parts you got to connect
It's going to be a lot. All right so we'll just keep in touch and see when we can get them.
So that trip was a couple of weeks ago and here in real time I think it's going to work. Yeah.
We are already talking to multiple people about loading them and unloading them and
transporting them. We're working out the logistics and we think they're going to
be here in a couple of weeks. This is very very exciting. Oh my goodness.
Now this past weekend was our very first hyper adobe safety and design 101 class. The first day
included a three-hour presentation about core earthbag safety techniques. Then we took everyone
to the homestead for lunch and a tour of the hyper adobe buildings on our property along with an
extended Q&A session. The second day included one-on-one consulting for their floor plans and
their choices of designs for their hyper adobe buildings. There was a lot of really cool designs.
Yeah. And all in all we had about 50 people show up for this weekend so this was by far
our biggest event. It was and it was really cool to sort of approach us in a different format. We
got to meet so many cool people and like really hear about their big dreams and their plans and
then we were able to take like the last six years of experience that we have with hyper adobe and
help apply that to what they're doing to give them the best chance of success. It was really
interesting to approach it in this format instead of like the normal highly edited videos that we
put in on YouTube. This was very long like I said three hours. There was lots of questions and
answers and I may still be recovering. My voice is almost gone from the last few days but it was so
great. I think it was also really great to have people come to the house and see it in person and
be able to ask questions and really feel the materials. So I think this was a really good
idea. I do too. Now if you weren't able to make it we will be doing a more edited version of this
presentation that we'll put on YouTube and a pdf of all the information included as well. But we're
also thinking about maybe releasing the whole three-hour thing like if you just really want to
nerd out and we might charge for that but let me know in the comments if it's something that you
would be interested in. Now while it is exciting that some of the pieces for the roof will be here
very soon what we really need to concentrate on is getting the groundwork done for this
Lava Creek Utility Lodge. It's gonna be right behind us right here. This is a very important step for the
house. It might seem to you that we're getting distracted from the house build but this building
is included with all the things that need to help our house function. This is what we're calling an
engine room or a structure that will house our off-grid solar system components, water filtration,
and pressurization stuff like that. Keeping these items in their own building and actually closer to
the new solar system array we're going to build and then the water storage tank that's going to
be a much better way to sort of create our own grid that will then feed into the house so that
it doesn't have to be inside the house. This is all years of planning and researching and it's all
finally starting to come together and what's really cool is if you go back to the original
roundhouse videos our plans are pretty much the same. Pretty much. Obviously some little
differences here and there but now that we're having to like really finalize those decisions
I'm getting a little stressed out. Just a little. I'm building out real solar arrays with the Iron
Ridge designer looking at spec sheets for above ground water tanks. I'm using drone shots at scale
to see what can actually fit over here. How we're going to trench all the utilities in and out.
Welcome to my plan. We're just going to give you a quick overview and recap if you don't want to go
watch the video from like four years ago. So here's the idea. As you can see the roundhouse
is right here. Utility lodge is going to be here and the solar array is going to be here and these
are both facing almost south. Not quite. We really wanted this building to kind of mirror this
driveway. So we're basically we want this all to be in line so that it looks nice. So as you can
see there's a lot of things going in and out of this and that's why we're having to plan so far
ahead. There's so many trenches. There's so many different parts of this system. The big ones are
definitely the building itself right which is the utility lodge, the solar panel array, and the big
30,000 gallon above ground water tank. And those are the main things that we needed to make sure
we could fit in this area. Inside the utility lodge like we've said there's going to be all
of our inverters and solar charge controllers and batteries will all be along this wall.
Inside here will be a pump house with a pressure tank and filtration system. And then there's going
to be a bathroom in here. A full bathroom because we are right next to the septic. So the septic
system is right here. We're going to dig this up and tie into it so we can have a flushing toilet,
sink, and a shower. And it'll be fully enclosed so it'll be great for guests when they're here.
Also coming into it will be solar. That'll have to go through the wall because you need a shutoff
switch on the outside. We're going to have a backup generator that will also go through the
wall. But everything else is going to come underground right. And so the water from the
water tank itself is going to come inside and it's going to get pressurized there. It's going to go
back out to the chicken, not the chicken garden, to the cactus garden so that we can irrigate all
the stuff in here long term without having to have like a whole separate water system. And then the
main thing is once we create our AC power out of this solar system we're going to run a power line,
a water line, and then also we're going to be running a new fiber line in for our internet.
It's going to come into this building and then go under the driveway into that utility room on
the roundhouse. You can see we're also thinking about our, and I'll throw the roof back on,
our downspouts for the roof to catch rainwater off of. We're going to have a couple of smaller
tanks in the back to get the water from these sections, but most of the roof is all going to
go underground into this big water tank and then it's going to get pulled into here and pressurized.
Now this is all great for planning, but we actually need to get out here and really make
sure all these measurements are going to work out. Today has been all about just super rough
marks on the ground to make sure everything's going to fit. So as you can see this is going
to be the Lava Creek building. There's the square. This tree is going to have to move.
I'm not too sad about it. Kind of an ugly tree. And then the back wall will be basically here
where the door entryway will be and the bathroom will be in this corner. Now perfectly in line
with this building we're going to have a massive solar array. It keeps getting bigger the more math
I do. It's about 70 feet long. It's going to start about six or so feet from the back of this wall
and it's going to go all the way down almost to the container honestly. And the thing we don't
love is we're going to lose a really nice mesquite. We may still see if there's another way we can
work it. Our septic system is right here and you can see these four dots. These are the leech lines.
This is a trench that goes here, here, here, and here. And so we have to make sure we set all this stuff
far enough back so that if we need to get machinery in here to dig this up and redo it
that we've got plenty of space. The big 30,000 gallon water tank. You can see this circle. It's good
size. It's pretty good size. Now this is technically 30 feet. It's about four feet bigger than it needs
to be because you're supposed to prep the area around it. So the tank itself won't be that big
but also we want to make sure the tank wasn't too close to the solar panels. It wasn't too far out into
this driveway and not sort of in the way of the house when you drive up the driveway. Now I actually
had Wilcox Rock and Sand out here to really scope this project and give us a quote. So they will be
clearing all this land behind us. Now we are going to try to transplant this mesquite tree because
it is so nice. We know that the odds of it surviving the transplant are pretty slim but
we're going to try it anyway. They're going to have a big enough machine here to get as far down on the
taproot as we can and then they're going to dig a huge hole. We're going to put it back in. We're
going to try it. We're going to see if it works. It's worth a shot. Worth a shot. But yeah
otherwise we can't really do much more marking because they have to clear it, bring in the AV
mix, level and compact and then we have to remark and then we can start drawing trenches and
all that stuff. Yeah. But there's no point because they're just going to get rid of it all if we mark
it now. Yeah I'm a little bit worried about our timeline here babe because we only have two weeks
to get this completed and they still haven't showed up. Right and the reason we only have two weeks
is that we need to make sure that the concrete pad that they pour has enough time to cure before
we start building the lava crete walls on top of it. Yeah. So we're running out of time. Wilcox
Rock and Sand please call me. I think we might go visit them today. Yeah. Now speaking of lava crete
we know a lot of people still have questions. There's not a lot on the internet about it so we
are going to hopefully change that. That is something we are working on behind the scenes.
We're doing a deep dive video on how lava crete works and if you don't remember it's basically
the idea of taking lava sand and cement and sort of forms and sort of rammed earth techniques but
not nearly as much labor and building a wall that when finished you don't have to do any plaster
work on. That's the goal. That's the goal. This video is still in process. Jonathan's already
interviewed people and toured existing lava crete structures up in Tucson and we will be filming an
actual work site so we can show the process. Definitely keep an eye out for that because we
are still working with Guru Das for this lava crete utility lodge here on our property. That
workshop is happening April 6th through 11th. Yeah and you know it's gonna be one of the only places
that you're gonna be able to come to really get full hands-on to learn this building technique
right now. Like we said it's pretty new. Not a lot of information out there about it. It's gonna be a
pretty unique experience. I'm excited. I'm excited too. Also the workshop is already halfway full so
if you would like to come make sure you sign up soon because I think this one is gonna be pretty
popular. I do and remember you can camp here on the property for the whole week. We'll have a
port-a-potty. We'll have outdoor shower. We're gonna feed you each day. Got Guru Das coming to actually
run the workshop and then also Paul Schwamm who's been developing the technology for the last 30
years is going to come for a day or two and share all of his history and experience with this new
way of building. So like you said spots are already half full. I think if you are interested in coming
to this I would start getting signed up as soon as you can. Yep we'll see you here tinyshinyhome.com
slash events for more information. So what else is coming up? Well I am working on a video
of a failure. We already know it's gonna be. I already know it's a failure but I'm gonna
I'm gonna stick with it and show you all the failure. So I am working on our fourth
rendition of our shade for our Airstream. I might have even counted wrong. Is it really four?
Okay so technically if you think about the Airstream since we put it here we had the
triangles first then we moved it to the Airstream cover which we thought would be enough shade but
it wasn't. Then we added the triangle shade cells back then that didn't work. Then we put wrapped
black around everything and looked real scary. And then I took that down and I've come up with
this fourth idea that I thought was a brilliant idea. Turns out not so much. Maybe not. I mean you
know it's still I think we'll keep it for the summer. Yeah. But there might be a fifth version
but we'll just say that. Hopefully we can just be in the house soon. That would be the ideal
situation. So get ready for that video guys. That's what's coming up soon. It's like a how not to.
Yeah yeah. Now a lot of you are probably gonna wonder when do we start the roof and that's a
fantastic question. Here's our here's our issues. Number one we gotta get him here which we know is
gonna happen but then we have to do a ton of fabrication work to them. We have to cut them.
We have to weld things onto them. We also have to rely on other people because they are so heavy
someone is gonna have to have a tractor here to move them for us to even work on them. So
it's a lot of relying on other people and I that's like my thing I hate the most. Yeah but also
the Lava Creek Utility Lodge workshop is in about a month. Yeah. And we have to do all this ground
work and utility trenching and pour the concrete pad and have it done two weeks early so we can
actually pour the lava creek on top. So most of March is going to be that. Yeah. Then the workshop
is in April. Yeah. Then Jonathan's parents come to visit and then Hayden and Millie come to visit.
Yeah. And then we go to Kanab to go work with Eric on a project. In May. Uh-huh. So the answer
is is that we just we don't know. There might be bits where we can work on these bar joists but I
think it's I yeah. I just think the bulk of the project won't be happening until late this spring.
Yeah. Yeah. So anyway um long story short unclear on when the roof will start but we'll let you know
when we do. One thing that we do know is 2026 is going to be less earthbags and more progress on
the roundhouse. So we will see you next time.