DIY Covered Patio Building A Roof To Cover My Concrete Patio P1 Foundation Framing Roofing

That Tech Teacher
94 followers
7 Video Views·Dec 10, 2022
I'm pretty sure these are deep enough.
All right.
So this project is probably the biggest single project that I've ever attempted
to do, and what we're doing is putting a roof over this patio to make kind of a
covered patio space to get away from the sun.
Uh, we love our patio.
The only problem is that it's all concrete and we get sun from about seven
o'clock in the morning until about three to four o'clock in the afternoon.
And it gets hot out here.
Uh, there aren't enough patio umbrellas in the world to create the kind of shade
that we're looking for.
So we're trying to create a place that has some shade for us, where we
can get away from the sun and relax.
Um, and I think I've come up with a way to do this.
That's a little bit different than I've seen in my area or some of the
ideas that I've even seen on YouTube.
So I've already started getting the foundation ready and set.
Uh, there's a whole lot more work to go with this project.
And then even this project is just a small portion of what we have planned
for the rest of our backyard makeover.
So here are the plans that I came up with infusion 360.
And the things that led me to this design was I wanted the structure
to cover the entire patio and actually have an overhang going towards the pool.
Then I couldn't build any closer to the property line on
the right hand side of this.
So I had to match that side of my house and I matched the slope of
the gable that I was attaching it to.
And then the third thing was I didn't want to have an obstructed view out at the end.
I didn't want to have a beam like you would have on rafters.
So I elected to go with trusses.
And then the third thing that kind of makes this unique is the way
that it connects to the house.
It being so much wider than the gable, it has to extend up and over farther leaving
this unique breezeway or courtyard type of place that I think is kind of really cool.
But then once I was done with my 3d model, I turned this into a set of hard
copied plans that I printed off and took to the city to get all my building permits.
Then once everything was approved, I actually started this project while we
were finishing up the last of my fencing projects that I've been working on.
And I had this mini skid steer and auger already rented.
I just rented a larger sized auger, 18 inches in diameter and use this to get
the rough size of the hole and get any dirt out of these holes that I could.
The other tool that I rented was this concrete saw that I used to cut out some
concrete squares on the, on the one side of the patio so that we could get the
holes a little bit closer to the place that they actually needed to be.
Everything was going great with these.
The two holes on the other side were really easy.
We got down to full depth over 48 inches.
And then on this side, when we were doing these, we hit something hard, right
about 30 inches or so down, uh, and that auger wasn't going any deeper.
So then a week or two later, after the fence was done, I came back and
cleaned up these holes and got them to the proper depth and width that I needed.
And for the two holes on this side of the patio, I found out what that hard
thing was that I hit and it was rock, solidly packed rock.
And this isn't naturally occurring rock.
This is something that was built in the construction of my house or something
that was dumped in the leftover from somebody else's, and it was packed in there.
I didn't film this because this was frustrating and I, it was not a fun
process, but we got all that out there and we got the holes to the proper size.
Each one of the holes was dug at least 48 inches deep and then 24 inches in diameter.
And in most cases they were deeper and larger in diameter than they needed to be.
And I made sure that I dug underneath the concrete a good distance and
build out the bottom of the holes.
So they were wider at the bottom and they were at the top and that the
center of the footering was going to be at the center of the, where the post was
going to be.
And I also made these really quick just so none of the dogs fell in the holes.
Now we're onto the part where we fill back in the hole that I've worked so hard to
dig.
And what I'm doing here is creating a footer.
The footer is going to be 24 inches in diameter or the width of the hole, and
then 12 inches thick of solid concrete.
I thought this was a little bit overkill, but when talking to my city engineer,
that's what they wanted for the structure of this size.
So I'm not going to argue with them.
So to start, I mixed up four 80 pound bags of concrete and poured those into the
hole.
In between each bag, I moved the concrete around to keep things level.
I used a piece of rebar to try to get out any air pockets that would be in there.
And then actually the, after the fourth bag halfway through, I ended up getting in
there and walking on it, stomping on it and packing it down.
I'm not sure if that's a recommended move or not, but it's what ended up working for
me that it kind of helped me get everything packed in there.
Then I repeated that process, mixing up and dumping in four more bags for a total
of eight bags.
Then I ended up measuring it at the end, checking to make sure that my hole shrunk
by about 12 inches, ensuring that I had 12 inches of concrete in there and it was
the proper depth.
And then the last thing that I did was I took a trowel real crudely and real fast
and just smoothed off the top of it, ensuring that my post was going to sit on a
flat surface of concrete.
While the footings were curing, I went back to the house and started tearing it
apart as minimally as possible just to expose the area where the beam was going to
connect and to hopefully try to keep it mostly watertight while we were working on
this.
Later that evening, when we weren't in direct sunlight anymore, I got out my new
favorite tool and that's this laser level.
It's designed to be used indoors, but when we're not in direct sunlight, you can
actually see it outside.
And this laser line that it's projecting is lined up to where the beam is going to
attach to the house.
And I'm projecting that out so that I can put in a temporary post to put in a string
line that'll help me the next day install the two posts that are going to line up
with that edge of the house and make sure that everything's where it needs to be.
The next day I came back and saw the first two posts and these things were no joke.
These are six by six pressure treated posts and they're 14 feet long, way longer than
I needed.
But the difference between like a 12 foot post and a 14 foot post was about three to
$4.
So I figured, what the heck, why not go with a little bit extra?
Then, you know, you're not going to run out, but definitely having a second person
to help you handle these and maneuver them.
It's not the pure weight of them.
They were just awkwardly big in size and heavy, but I ended up getting these in the
hole and then started bracing these up.
And one thing that I did to help was I created these little two by four pieces with
screws in them.
The screws went into the expansion joint and basically created like a little cleat
that helped me brace them on the concrete side.
On the other side, I braced them just like a fence post, only adding a few more braces
just because these things are so big, heavy and awkward that I didn't want these things
going anywhere.
Then I was checking these for plumb level in every direction and they didn't actually
touch the string line.
I made sure to keep them about a 16th or an eighth of an inch off of that string line
so we weren't moving or manipulating that string line, making sure that we had a nice
true line there and these posts were exactly where they needed to be.
Then again, that night I got out the laser again just to double check the locations of
these posts to make sure that they're plumb, in line and in the correct location.
And I thought this was cool.
You could see the laser lighting up the actual string line, showing us that that
string line was right in the correct place.
And it's also lighting up the edge of the post and showing all the imperfections of
how one post had a slight twist to it and wasn't exactly 100 percent straight.
The following day, the last two posts were installed and this time I had my dad here
helping me and that helped immensely.
Having somebody else to help hold that post up and check for plumb while you're
putting up the bracework made all the difference in the world and made that so
much easier.
Plus, it was easier to check measurements this way.
We checked measurements in both directions in between the posts and then we also
checked those measurements diagonally to make sure that they were all in the
correct locations and square so that this structure was actually going to hopefully
come out somewhat square.
Then after all the posts were installed, I mixed up two more bags of concrete for
each hole.
This was just to go around the base of the post to make sure that we held it in
place.
Then I came back with a trowel and really quickly just sloped the concrete away
from the post so that any water that drains in here is going to be shed away
hopefully from the bottom of the post.
Then back at the house, I removed part of the wall sheathing to expose the end
truss of the gable.
On top of the roof, I marked out this rectangle and then I cut that rectangle
out with my multi-tool.
That exposed a hole through my roof down to the truss that I'm going to use here
in a second.
And I'm not going to show you how I did it, but this is what I used that hole in
the roof for.
I installed my first truss through that hole and attached it to the end truss on
the existing gable.
What this is going to do for me, because I'm not a professional and I'm not
getting this done in a week, is it's going to allow me to put that first truss in,
make that attachment to the existing roof and keep it semi-water tight.
And then also by installing that first truss, I could get out my handy laser
again and I could find the exact bottom of that truss actually where it is and
send that measurement out to each one of my posts and make a location of where my
truss would line up on each one of these posts.
The next day I used that line where the bottom of the truss was going to be that
I marked out with the laser.
I used that as a reference, measured down the height of the beam and marked that on
all four sides.
Then additionally, I marked down the distance between the blade and the edge of
my circular saw and made another mark all the way around the outside.
I'm going to use that mark to line up my speed square and clamp that to the post
and use that as kind of a guide when I'm using my circular saw to cut these posts
to height.
Even using the circular saw at its maximum depth, it still doesn't cut all the way
through the posts, even when you go around all four sides.
So then I use a sawzall to finish off the center.
After that, I loosely installed the post cap brace just with one nail so that I
can move it around later.
Each beam is going to be made out of three LVLs.
Each one's almost two inches wide at 12 inches tall and 24 feet long, and they
look heavier than they actually are, but it was kind of crazy how each one got
heavier as we installed these.
So to make each beam, we installed each LVL individually.
We found out that putting the first side of the LVL on the ladder, then coming back
to the other side, putting that side on the post, and then going back to the other
side, putting that side on the other post, and then sliding it into place worked
pretty well for us.
We repeated that same process for the second LVL.
And then once we had two of them up there, I used some quick grip clamps just to make
sure that we clamped them together pretty tight.
And then I use the framing nailer to attach these things together.
I nailed them from both sides, making sure that they were really well connected.
Then we put up the third LVL and then went back and nailed that one to the other one.
To do the other side, we repeated that same process with a little extra
supervision this time.
Then at the end, I came back and fully attached the post cap brace with all the
nails.
Once both beams were in place, I started on one end and I marked out 24 inch
centers all the way down the length of that beam for where my trusses were going
to be installed.
The way that I mark these are a little bit overkill.
I like to give myself a center line and then a line three quarters of an inch to
the right and to the left to make sure I know exactly where this thing is going.
And it's super easy to line up when we're installing these trusses.
Then yet again, later that night, I came back with a laser and I'm really
starting to love this thing.
This time I'm using it to make sure that my marks for my 24 inches on center for
the trusses on one beam line up with my ones on the other beam.
And as you can see here, I got these things to line up pretty darn close.
That means that both beams are in line with each other and that means that the
trusses are going to be installed pretty darn square.
Then just to make sure I was doubly sure, I checked it again at the other end of
the beam and things looked great out there as well.
Then the next day came the most awkward part of the project or cumbersome part
of the project, and that was installing the trusses.
You can see I have my dad over here helping me, which was a definite must.
This would have been really difficult doing this by myself, but you can see we
get the truss up there upside down and then I'm backing up the ladder, kind of
pulling it as I go.
Definitely OSHA approved for sure.
Then I get that truss up over that center board that I'm using to attach the top
of the trusses together.
You can see that we slide it along the beam until we line it up with the marks.
Then I'm going to get off the ladder, go over and temporarily just use a screw to
screw it in place on one side.
I made sure that I lined up all the trusses really good on our right-hand side
here, and then I went over on the left-hand side and got them as good as I
could to line them up.
Not every truss is a hundred percent the same.
I did install them the direct way that they came off the truck, so at least they
were all in the same orientation.
Then I went back up to the top of the ladder, screwed them into that top board,
and then of course it was raining while doing all this, but I came back and used
the framing nailer to make sure that I really nailed these things in place.
Additionally, by code, each one of these trusses had to be installed with a
hurricane strap.
Each one of these has 10 nails in it, so I don't think these things are going
anywhere.
At this point, I thought it was a good time to go ahead and backfill the post.
I probably could have done this earlier, but now at least the beams are installed,
the trusses are installed, so the main structure of the building is attached
together and locked in place, so I thought now was a good time to go back and fill
these holes up.
I know some of you guys are going to freak out that I'm putting dirt around a
post.
I talked to multiple architects and engineers.
These six-by-sixes are, I believe, 0.6 pressure-treated rated.
I can't remember what the number is, but they are water-resistant for 40 plus
years in ground, and they even said that they're going to last longer than that.
But I did pack the dirt in these really well, packed it down every eight to 10
inches or something, really packed it in, and then when cleaning up, I definitely
watered that dirt in, and then over the next few days, I'm going to continue to
water it and let it sit over the winter to let that dirt fully settle.
After picking up some more lumber, I'm going to be using these two-by-sixes to
create our rough fascia boards, but before installing those, I have to go back and
cut the overhangs on the trusses to length.
When I ordered the trusses, I ordered them a little bit long because I had a
feeling that I wasn't going to be either going to be able to install them
perfectly or the trusses weren't going to all come on 100% perfect, and I'm glad I
did.
I went ahead and marked these and cut these with a jigsaw, not the most perfect
way to do it, but it got a good enough cut for us to get them all straight.
Then I came back and nailed these in with a framing nailer.
Each one of these got about two nails on each truss to make sure that they were
held in place.
And then I installed each one of these boards, not necessarily the easiest thing
to do by yourself.
The big thing was that I left these boards overhanging the ends so that I could use
those to build overhangs on those ends later.
Before building the overhangs on the ends of the gables, I decided I wanted to
install the plywood sheathing first.
So I got out the Kreg track saw, figured out these angles for these triangles, and
then cut them out.
Once I had them cut out, I took them up and temporarily clamped them in place.
Then I came back with the siding nailer and nailed them in place.
Since I don't have a drop truss, really the only thing that I could do was use
two by six spacer blocks to build out that overhang and then use the same two by
six as the outside fascia piece.
Some of them were nailed in.
I really preferred screwing them in.
I felt like that was a stronger way to do things, but then I repeated that same
process on the house side and then the overhang dead ended into the roof of the
house.
Installing the roof decking is when this thing really started to feel like it was
coming together and we were making some serious progress.
Uh, here I'm installing four by eight sheets of half inch OSB roof sheathing,
and I'm using a framing nailer to nail these in place.
Um, I'm also using H clips.
Uh, these H clips are code.
Uh, and the reason I believe we use these is not only to hold the two pieces of
sheathing together in between the trusses, but it also provides spacing for expansion
and contraction.
One major thing that really helped me out with this was my dad down below and he
was pre cutting everything for me so that I was starting with the correct spacing,
making sure that I had a good overlap from row to row.
Then at the top, I'm leaving about a two inch gap on either side.
This is going to leave a nice gap at the top so that I have an area for any heat
to escape that trussed in area and go out the top ridge vent.
Now I'm no professional roofer and I don't claim to be, and it's been a while
since I learned how to do this stuff in college.
But for me, I'm starting off with a layer of ice guard in my area.
This is something really good to do for homes.
It's code for a structure like this.
I'm not a hundred percent sure to be honest, but that's where I'm starting off.
I think it's a good way to protect ice from coming back up underneath those
shingles when installing this, I'm only taking off the top layer of the sticky
part, um, because we're going to have to come back and do something to it later.
And I'm using cap nails every so often to nail this in place.
I know because of the angle of the sun here, those wrinkles look terrible later
on, I'm going to be able to get rid of those.
They're not as bad as they look.
After the ice guard was on, I covered the rest of the roof in synthetic underlayment.
Uh, this was a little bit harder to install than I thought.
Uh, it was hard for me to keep it straight.
I'm sure there's a technique out there, but I ended up playing with it a few
times and ended up getting it straight.
I ended up getting most of the wrinkles out of it and, uh, putting in cap nails
in most of the places that they said probably used way too many cap nails.
But wanted to make sure that this thing wasn't going anywhere
and was staying in place.
I think the big thing was that I started at the bottom and worked my way up the
way that you're supposed to, that way all the water runs off of this and
it's going to be super tight.
If it's a hundred percent straight, I don't think it's going to matter
and nobody's ever going to see it.
Um, after the roof was completely covered, I moved shingles up onto the roof.
And that was, uh, that was really fun moving bundles of shingles up a ladder.
But these shingles were ordered last year when I had my roof
done because of storm damage.
So in theory, all of these shingles came from similar batches
or were made at similar times.
So they all should be a hundred percent identical.
And this roof should match my roof a hundred percent minus a little bit
of sun fading, uh, or losing some of the granulates on the main roof.
Here, I'm coming back and pulling up the ice guard that I haven't
completely stuck down yet because I want my drip edge to be underneath my ice
guard, that way all water and stuff runs down over top of the ice guard.
And the ice guard can make a good seal to the top of the drip edge.
I'm nailing in the drip edge with a roofing nail every two feet or so.
Then on the gables, I put the ice guard over top of the underlayment
and on top of the ice guard.
Then I installed a row of starter shingles around the entire perimeter
of the roof, letting them overhang the drip edge by about a half
to three quarters of an inch.
And that really gave me a good straight line.
And then these have a row of tar around the outside edge, which is really
going to seal down the edges and that first row of shingles.
After the starter shingles were in, then I did the first complete
row on the bottom of the roof.
Yet again, it's been a while since I've done this.
I'm making sure that I'm paying attention to my nail spacing.
Make sure I'm holding the gun at the right angle.
So I'm firing in the nails perpendicular to the roof and making sure that I'm
getting them in the actual nailing strip themselves where they should be.
There's some thought that goes into this, where you're placing your
nails and what your offset or your stair steps going to be on the next row.
So that you're not leaving a nail in the place where there's
going to be a gap on the next row.
I'll be honest with you.
I worked probably one or two rows at a time going up the roof for the first half.
Uh, yes, I use chalk lines to cheat a little bit to help
myself keep these straight.
I took it slow, watch my reveals, watch the nail gun, making sure that I
was driving those nails incorrectly.
And yet again, paying attention to that nail spacing and overlaps.
Then when I got a little bit more confident, I started, you know, really
working into that stair step instead of just doing one row at a time.
I was doing four or five.
And yet again, this was probably the most rewarding part of the roof because
you really start seeing some progress and you really start making progress fast.
And who doesn't love using a nail gun?
Another thing that made it really nice for me is I had my dad yet again, down
below, and I was yelling down measurements to him and he was
pre-cutting all of my pieces for me.
So all I had to do was stand up there and nail, he was cutting the shingles
and throwing them up to me and they fit like a glove and really made this process.
On the other side of the roof, things got a little bit more complicated to tie
into the existing roof and shingles.
I very gently removed their shingles using their stair step pattern.
And then I used my overlayment that I left long on purpose.
And I overlaid it on top of their underlayment, um, tucking it
underneath those existing shingles.
And then just like the other side, I used that same process using their
stair step pattern and worked my way across the roof.
I did the first few layers first to make sure that everything was straight
and everything was going well.
And then I started using a more aggressive stair step pattern,
doing multiple layers at a time.
Uh, this worked out really nice when doing multiple layers at a
time or multiple rows at a time.
You don't have to move around the roof as much and things go a whole lot faster.
Then at the top of the roof, I cut off any overlapping shingles.
Just so we kept that top open and we can vent out any heat through that ridge vent.
And then on either side of the roof, I installed about four ridge cap
shingles to seal off the ends.
After that, I installed the plastic ridge vents across the entire roof.
Then I came back and nailed in these ridge cap shingles along the entire
length of the bridge cap to give that ridge cap the same look as your roof.
Uh, there are some slight gaps in the ridge cap that this does
keep water from getting in, but mostly they're just kind of for show.
And then here's a quick look at the old roof and the way it blends into
the new roof and the way you step flashing to keep everything watertight.
All right.
So I'm not proud of this, but it's now two months later than
the clip that you just saw.
And not to make excuses and that you want to hear my excuses, but with my
son starting daycare for the first time and the never ending streak of illnesses
that we've had, and then me actually starting my day job of teaching again,
uh, progress has ground to almost a halt.
Uh, I'm still working on this, still getting stuff done.
It's just a whole lot slower than I ever thought this could possibly take.
And I'm actually kind of embarrassed, but that being said,
I'm still working on this.
There's a whole lot of work to go and there's going to be a second video
that, that shows all of that progress.
I'll try to keep you guys up to date, up to date on my Instagram.
I really want to start utilizing that more.
Uh, but in the next video, we're going to be wrapping posts, wrapping beams.
I have tongue and groove that I'm thinking about staining before
I put up there or just put it up.
Um, I'm working on electrical right now for can lights and ceiling fans.
We have siding that needs to go on either end.
I have fascia and softening, and then I'm going to have somebody
come out and put gutters on, and I'm going to dig the downspout lines.
And so there's, there's a lot that's, that needs to go on with this project
still, um, and I think it's going to make a good video either really late
this fall, but probably the first video that I post in the spring, the first
outdoor video that I post in the spring.
Um, so there's a lot to come.
If you liked the video, please hit the like button as always.
If you want to see this project to get finished or any of the other
projects that I now can do, because this one's done something like decks
and sheds and more fences and more drainage and some other cool stuff
around the pool, I really hope you guys subscribe, but other than that, I
hope to see you guys in another video.