Our model trains have the capacity to do more than chase their tails- even on small layouts. With on-board sounds, reliable operating couplers, a deep flanges to reduce derailments, our model trains can easily become components of a model RAILROAD - replicating, to some extent, the operations of a real railroad - past, present, or imaginary.
So, let’s take a look at part of an operating session on my mythical Queen City Lines - officially the Ohio, Indiana, and Northern Kentucky Railway.
**As an Amazon Associate and a member of the eBay Partner Network, I may receive commissions on qualifying sales generated from the links on this channel.***
Toy Train Tips And Tricks is a channel devoted to the operation, repair, history, and collecting of classic 3-rail O and O27 gauge trains made by Lionel, Marx, K-Line, Menards, and other manufacturers.
Putting your toy trains to work. Real mystic operation on toy train layouts on this episode
of Toy Train Tips and Tricks. Hello again, this is Mike with another episode of Toy Train Tips
and Tricks. Most toy train layouts are designed with one or more loops or figure eights upon which
our trains will endlessly chase their tails. There's little to no effort to reproduce the actual
dispatching, running and switching operations of a real railroad. Instead, the layout operates in
what I like to call goldfish mode. The motion, lights and sounds help us to clear our minds of
the stresses of the day. And there's nothing inherently wrong with this kind of operation.
In fact, I often do it myself on my own layout. If I have a spare 30 or 45 minutes somewhere in
a day, it's nice to go and flip a switch, watch the trains run until the rigors and deadlines and
responsibilities compel me back to reality. But our model trains have the capacity to do more,
even on small layouts. With onboard sounds, reliable operating couplers, deep flanges to
reduce derailments, our model trains can easily become components of a model railroad, replicating
to some extent the operations of a real railroad, past, present or imaginary. I designed my layout
to do both, possibly because of my childhood exposure to large operation-oriented HO scale
railroads, as well as traditional O gauge. And although my current phase one represents only a
fraction of my planned completed layout, even in this roughly 5 by 10 foot space, I can not only
run trains in goldfish mode, but I can also replicate real railroad operations. While many
think of realistic operation as strictly for HO or N scalers, Frank Ellison, one of the pioneers of
realistic model operation in the 1940s and 1950s, was himself an O scale operator, although the
two rail type. Before I go any farther, let me pause to say that there are different levels of
realism involved in model railroad operation, just as there are different realism levels in our
trains. Some like to operate scheduled trains with actual printed waybills for each car, describing
not only its layout destination, but the load and the imaginary far-off origin of the car load.
Others take a more freestyle view, such as, well hey, that industry needs a loaded hopper car,
find one and put it there. My operation style can be described as being from the view of a typical
railfan. I don't have any waybills or paperwork, and while I don't need to know the precise origin,
destination, or bill of lading of any individual car, I do pay attention to what cars would
reasonably go to a particular industry, and make logical train movements to place each car at its
destination. So, let's take a look at part of an operating session on my mythical Queen City
lines. Officially called the Ohio, Indiana, and Northern Kentucky Railway, but Queen City has a
nicer ring to it than Oink. This is the Winton Local, that's Winton spelled with a Y. As a
musician and trumpeter, I try to name my layout towns with musical names, especially the names
of famous trumpeters, which is where Winton gets its name. Also, there's an actual local community
of Winton Place, spelled with an I, that is home to a large Procter and Gamble facility,
like my Menards Tide plant, so the name helps establish layout geography as well.
My Queen City lines is a belt railroad, much like the belt railway of Chicago,
so the trains sometimes feature home road power, or they will as soon as I finish painting and
decorating them, or they can borrow equipment from the member railroads that make up the ownership.
So, today's local is headed by a Chessie System GP38. Okay, it's really a GP39-2 as I described
in a video that is linked in the description section of this episode. The local will be
tasked with switching out cars from our Winton Tide factory, as well as those from the local
intermodal facility. Our cars were pre-blocked for the two industries at Stradivarius Yard,
so named because it's just a fiddle yard, as operators often describe them. Fiddle yard,
get it? Also, Stradivarius is my preferred model of trumpet, so it fits with the theme.
This blocking will reduce the time and effort needed by our local crew. With the bell ringing,
our local takes the turnout from the main line to the industrial track. While this Lionel engine
has an onboard horn, I like to use the whistle simulator app and Bluetooth speaker for a little
bit more realism. Check out the video description for a link to another episode describing how I
use this sound method. Also, for full disclosure, my phone equipment, which is my cameras,
cannot simultaneously record video and control the sound of the speaker, so I did have to overdub
the locomotive bell and horn sounds on this particular video, as I had no spare phones
available using multiple cameras. Now we will need to cut off the caboose from the rear of the train,
so we come to a stop with the caboose short of our industrial turnout, and the invisible
brakeman exits the caboose and uncouples it from the rest of the cars. After the brakeman radios
the engineer that the caboose is uncoupled, the engineer gives an audible signal with the horn
and pulls forward, clear of the industrial spur. The brakeman then throws two turnouts,
so our train may pick up a couple of piggyback cars from our intermodal facility.
This facility is set up to utilize both the Lionel No. 460 piggyback ramp for short TOFC
cars, but the Marx crane also provides the possibility of shipping and receiving longer
trailers and containers as well. The brakeman radios the engineer, who again provides the
audible acknowledgment, and backs up. As the train approaches our outbound cars,
the brakeman radios the engineer, two cars, one car, that'll do, as the cards collide and couple
together. You may notice the use of Marx 027 turnouts here on the layout. I like Marx turnouts
for this type of installation, but they do require just a little bit of tweaking to operate well with
Lionel and other modern equipment. Also, during the filming I discovered that the turnout on the
needed a slight repair, as the rivet that secures the inside rails had come loose.
This accounts for the rougher than usual operation of the cars on this turnout.
After filming, it required only a quick application of epoxy to reset the rails in place.
For more information of how I utilize these Marx turnouts and make them more compatible with my
Lionel fleet, check out the video link in the description of this video. Soon the signal is
until the outbound flat cars are clear of the switch. The turnout is thrown once again,
and the outbound cars will join the caboose on the industrial cutoff track. With the outbound
cars removed, now we have room to spot our inbound flat car at the number 460 piggyback ramp,
so we repeat the previous process while leaving the outbound car behind.
Now we move on to the tide plant. We will be picking up two boxcars and a tank car,
and dropping off three boxcars. A factory like this would receive chemical ingredients in tank
cars and or cupboard hoppers, and the finished product could be distributed by boxcars. Loaded
chemicals and empty boxcars would be inbound, while empty chemical cars and loaded boxcars
would be outbound. First, our train pulls forward to clear the turnout to the tide factory. Next,
we reverse to tie onto the three outbound cars. Once tied together, our train now pulls forward,
clear of the industrial cutoff turnout. Once again, the turnout is thrown, and we reverse,
adding these three outbound cars to our growing cut of cars. Now we pull forward with our last
four cars, three inbound boxcars, and an idler boxcar, which is present on the train for the
sole purpose of providing a buffer between the potentially hazardous tank car and our locomotive
crew. It would also house the bluetooth speaker for our locomotive sounds. Repeating the entire
process again, we now leave our three inbound cars behind, pulling forward with only the buffer car.
Backing once more, we couple our entire cut of outbound cars and caboose together. The brakeman
walks the train, making sure all the cars are coupled and air hoses are tied together. The
reassembled train pulls forward, clear of the mainline turnout. The brakeman returns this
turnout to the mainline position, then hops back on the caboose as our train pulls away.
Our train continues around the reverse track, heading back to Stradivarius Yard.
And so, even with just a small portion of our three rail layout finished, we see how realistic
operation can be incorporated into our toy train layouts to add variety to our running sessions.
Our trains are built for more than just chasing their tails around loops and figure eights.
Why not put them to work? I hope this has inspired you to find ways to add realistic
operation to your layout. As always, I hope you enjoyed the video as much as I enjoyed making it.
And if so, please let your friends, neighbors, and especially YouTube know by liking, sharing,
subscribing, and commenting. Whether chasing their tails in goldfish mode or switching in
realistic ways, keep those trains running and we'll catch you next time on Toy Train Tips and Tricks.