DIY Off Grid Cabin Build - Episode 02

The Woodhaven
54 followers
1.1K Video Views·Sep 14, 2025
In this video, I finish up the foundation - getting the posts cut, treated, installed, plumbed, squared, and leveled.
If you are planning to shop Amazon, consider my Storefront:
(affiliate link) https://www.amazon.com/shop/thewoodhaven
FREE 3 Month Trials: https://www.amazon.com/music/amazon-music-audible-deals
(Customers can cancel any time; after the three-month free trial periods, they will be billed at full price for each subscription).
DISCLAIMER*
This video and/or description contain affiliate links, which means that if you click on one of the product links, we may receive a small commission at no extra cost to you. As an Amazon Associate, I earn from qualifying purchases.
Music:
YouTube - Audio Library
Bensound - https://www.bensound.com
all right i'm back here at the property
and i wanted to uh
go to the next step
and one of the things that i wanted to
do is put some
uh post wrap on all of my foundation
posts
but those things are they're out of
stock they're out sold out everywhere
i thought i found some on amazon i
ordered them
and the day before the expected delivery
i got a notice that they weren't going
to be shipping that they were out of
stock
so
i want to put some kind of a protective
coating around
the posts at least where it
it
meets up with the ground level
because that's where the majority of
water damage is done
as far as rods concerned
so the only thing i could come up with
was getting some
plasti dip
it's kind of like
that flex seal it's a rubberized coating
i'm going to spray these in the affected
area before i
put them underground
[Music]
[Applause]
so
[Music]
bye
[Music]
i have no idea if this is going to work
but at this point i want to try
something
i mean these treated posts are supposed
to last 50 years
[Applause]
so
[Music]
so
[Music]
so
[Music]
all right i got several coats
on both of those
and uh
i used up about two thirds of this can
so i'm thinking i might be able to get
three posts out of one can
and luckily i've got two cans so
hopefully that'll be enough to do all
six posts
okay so i had uh
this
rim joist here
clamped onto this post
and i
checked it for level marked my lines
and i'm going to cut my
post to the correct height and then
create a shelf
[Music]
so
[Music]
[Music]
do
[Music]
[Music]
hmm
[Music]
it's not perfect
but i'll put my shelf there so
i'll clean that up
[Music]
so
[Music]
so
[Music]
so
[Music]
who needs a chisel
[Music]
[Music]
all right let me uh put a coat of
copper
[Music]
copper coat
[Music]
all right let me get the post
throw it in there and we'll see how
close i am
doesn't have to be perfect right now i
can make adjustments by raising or
lowering the hole
[Music]
[Music]
so
[Music]
all right
got the bubble uh right in the center
now
so i'm gonna go ahead and
get these plum
and get it attached
[Music]
[Music]
[Music]
[Music]
okay so what i'm doing is i've got my
shelf over here in the corner and i'm
resting on that it's got a clamp there
just to keep it in place
and then i get it level
and then i clamp it to this one and then
i can mark my uh
my top and my bottom so i know where to
cut it
so that's what i'm going to do
all right getting ready to
lag bolt in my last board and then i'll
have the rim joist done
[Music]
[Music]
[Music]
all right next thing that we got to do
is
we've got to uh
measure corner to corner and make sure
that we're square
[Music]
is
[Music]
do
all right uh got my neighbor bob over
here and he uh said he was gonna let me
borrow a 2x4
that we can put in the center here just
so that we can get that
all cut and
get the distance right it's off just a
little bit
but uh once we get that in there then i
should be able to backfill this
all right got those uh center braces in
and those are just temporary i just
wanted to use those to stiffen it up
which it did
and
now i'm able to backfill all the posts
i'll replace those as soon as i get um
get my floor joists in i just didn't
have any more joists so let me get the
back filling
[Music]
[Music]
[Music]
so
i got the rim joists installed all the
way around
got everything plumb square and level
and uh that was a took a lot longer than
i thought it was going to but
it's a lot kind of tricky i had to move
a few holes
here and there just to make adjustments
getting everything square
and again i've got those center braces
in there they're just temporary
just to stiffen it up
but uh it's really
good and solid now
so uh i guess the next step will be to
uh
get all the floor joists in and
get the floor subfloor on and
start going up i'm gonna try to see if i
can't come down here uh
over christmas break we'll see if the
weather permits but uh
i think that's gonna do it for uh for
this video
so i'll talk to you guys later
you