315 meters long, 65 meters high,
a total weight of 80,000 tons.
This is the Meraviglia,
the latest jewel of the Atlantic's shipyards,
a cruise ship equipped with all the latest technology.
A design that employs
an incredibly high-performance system
of simulation calculations and an army of engineers.
A giant puzzle made from 300,000 pieces of steel,
huge sheets of metal had to be cut
and then soldered to perfection.
If there are cracks, it can be very, very serious.
Everything that is in the area of the machines,
if there are cracks, it's leaks and it can cause a lot of things.
If there is a movement, it's too late, we can't react.
The ship produces its electricity,
it has its security systems, it produces its water.
It's a city that moves, that's the only constraint.
Our shipyard workers have been selling cruises on this paddock
for six months now.
So there's no way they can lose one, two or three weeks of operation.
It's not only one of the world's largest cruises,
but also one of the most ecological liners ever built,
despite having unequal propulsion power for this type of ship.
For this crazy venture to succeed,
the ship required six million hours of work,
thousands of men and women with one mission,
to build the biggest cruise liner in history for a European ship owner.
After four years of construction,
take a look behind the scenes at an extraordinary achievement,
a 600 million euro giant of the seas filled with innovation,
the ship of the future.
The Saint-Nazaire shipyard is located on the west coast of France,
less than 60 kilometres from Nantes.
At a size of 150 hectares, it is the largest shipyard in Europe
and one of the six largest in the world.
On this site, military vessels, tankers and new generation cruise ships are built.
Always enormous constructions.
The location of the yards is ideal for designing these giants of the seas.
The Atlantic Ocean is a stone's throw away
and its depth at high tide allows the largest ships in the world
to be launched from the construction site.
For the construction of the Meraviglia,
the shipyards have to meet very strict specifications.
The stability of the vessel at sea must be exemplary.
Seasickness is the last thing the passengers want
and so one of the priorities of engineers is to limit the pitch of the vessel.
The vibrations felt in the rooms and also on the deck of the ship
must be as limited as possible.
Also, the customers must not be inconvenienced
by the smoke coming from the huge chimneys of the ship,
so the ship owner demands that particular attention be paid to this.
And it is not only the comfort of the passengers
that is the subject of such precise studies.
The energy consumption of this new liner was reduced by 20%
compared to ships in the same category.
This means a fuel economy of several hundreds of thousands of euros per year
but also fewer gases released into the atmosphere.
The delivery of the Meraviglia was planned for less than four years
after the signing of the contract, a strict deadline.
If the liner is not ready, the penalties for delay are exorbitant.
More than 100,000 euros per day.
In order to succeed in this crazy challenge,
the shipyards have developed revolutionary techniques
and impeccable organisation.
The boats are split up into various sections.
The first stage begins with the arrival of the metal sheets
needed for the Meraviglia's construction.
They arrive directly in a hangar at the end of the building site.
The sheets will be cut in this 300-metre long building.
This is where the liner comes to life.
The 300,000 pieces of the puzzle, cut out day and night, take shape.
Robots take care of the cutting work
These steel plates respond to a growing demand from ship owners.
Cruise ships, unlike military vessels, are in open sea configurations.
The ship must give an impressive sensation of lightness.
The sheets are therefore very thin.
Another advantage is that the lighter the liner is,
the less fuel it consumes while moving.
Cutting the pieces is the first challenge for the building sites.
Some sheets can be up to 20 metres long.
For engineers, the challenge is to get as many elements out of each sheet as possible.
To minimise waste, the cut of each piece is calculated by computer,
which sometimes requires complex cuts to generate unusual pieces.
Like this one.
The bulb alone is a steel monster.
It has two purposes.
To increase speed, thanks to better penetration of the water by the ship,
and to save hundreds of thousands of euros of fuel each year.
Loic Morand worked on its development.
We see here the first wave that is created by the bow of the ship.
As speed increases, the wave increases,
and this mass of water will slow down the ship.
With the addition of the bulb, a second wave will appear below the bow.
The sum of the wave created by the bulb and the wave created by the sheet
will give a wave of the same magnitude.
With the disappearance of the enormous wave at the front of the ship,
less energy is needed to move the ship forward.
The size and form of the bulb adapts to the bow of each vessel.
The selection of the most effective profile for a bulb
is the work of hydrodynamic engineers.
A bulb with the best possible profile decreases water resistance by 20%.
This process has been specially developed for very large vessels.
The other part of the liner that also experiences water resistance
is the hull of the ship.
Like the bulb, the shape of the hull of the Meraviglia
has also been subject to considerable research
and, as such, has benefited from a new system for its design.
A world first, the Meraviglia benefits from software
that allows settings of the hull to be cross-referenced with sea conditions.
This software takes advantage of new high-performance algorithms
called CFD calculations.
This new technology for the study of fluid mechanics
has shown spectacular results,
which has allowed the hull of the Meraviglia to be designed with the perfect profile.
These calculations of the turbulence acting on the hull of an ocean liner
are a revolutionary part of the Meraviglia's design.
The results obtained inform engineers about the speed of the ship
with different hull shapes.
They allow designers to model more than 150 different hulls
according to the researchers' experiments,
to finally arrive at the ideal shape.
As a result of these numerical calculations,
we select a hull shape
and we make a model on a scale of 1 to 20.
So we have models that are very large,
and that are about 13 to 14 metres long.
And we test them in a basin
to determine the hydrodynamic performance of the ship.
On several giant models,
sensors are installed to measure the resistance of the water at a given speed,
a process that has existed for several decades,
but that is probably seeing its final days.
This is because the results obtained by the computer are astounding.
For the first time, the figures given by computer calculations
are just as precise as those measured by the sensors of the model.
And it is not just the hull of the Meraviglia that benefits from this innovation.
It is also the propellers.
Known as the weights,
they are the second revolution of the Meraviglia.
They are responsible for advancing the enormous mass of the ship.
Monsters of steel,
about 20 metres high,
coupled with gigantic propellers.
They have a propulsion power
that has never been seen on a ship like this one.
Combining speed,
new perspectives in travel,
and increased comfort of passengers,
they are the future of cruise liners.
The Meraviglia is at the forefront of this formidable revolution.
Miquel Legal is the man who will run the tests of the Meraviglia at sea.
The addition of these mobile propellers
offers him a smoothness and control never seen before.
Each of the two electric motors
produces 20 million watts,
the equivalent of 7,000 washing machines,
the highest electric power ever produced
for a propeller of this size.
The Meraviglia is the future of cruise liners.
On the lower rear part,
a wing controls the direction.
Powered by the engine,
the propellers drive the liner forward
with a maximum speed of 25 knots,
an impressive feat for a ship of 80,000 tonnes,
the equivalent of nearly 6,000 buses.
But this is not their only feature.
They also give the ship incredible manoeuvrability.
You can have asymmetric manoeuvres
between the lower and the tri-board pod.
You can have a 90-degree turn
when one is in reverse
or in forward but turned 180 degrees.
This opens up new possibilities
for the commander in terms of manoeuvres.
These are increasingly large ships
that can be put in much smaller places.
The result?
The Meraviglia will be able to dock in ports
that would have been impossible
with the old style of propellers,
a real plus for the passengers.
Another innovation is the automatic control
of the engine power
which has been improved by the engineers
to avoid any risk of catastrophe
as seen here.
A cruise ship more than 300 metres long
with 4,000 passengers
leaves a small port
on the coast of Messina in Italy.
The captain has apparently
not measured the power of his pods.
The port experiences giant waves
destroying several ships.
The damage costs several hundred thousand euros.
In addition to their power
these new generation propellers
allow for fluidity of navigation.
There are almost no vibrations
felt on the ship.
The result?
Cruising at speed
does not bother the passengers on the ship.
But the pods are not the only ones
to provide energy to the Meraviglia.
Four diesel engines on the ship
act as a power station.
The Meraviglia
with its 2,500 cabins,
casinos, theatres
and other leisure facilities
is very energy intensive.
If you add to that the energy consumption
of the 7,000 people living on board
it's clear
there are very different needs to meet.
The pods
as well as the four engines
manufactured by subcontractors
were transported here
to the construction dock
where the assembly was carried out.
The floors of the ship
that have been assembled
are brought here
to this 900-metre construction zone.
Like a giant's construction game
the blocks are stacked on top of each other.
It is impossible to imagine this
without this machine
that allowed them to be moved.
The large gantry crane
called the TGP
is the largest lifting machine
in all of Europe.
A giant weighing over 5,000 tonnes
the equivalent of
10 A380 airplanes
a structure made of ultra-resistant steel
at 100 metres high.
At maximum capacity
it can lift nearly 1,200 tonnes.
The Meraviglia
would not exist without it.
This giant moving bridge
works with two carriages.
In each of the carriages
two lifting systems
are positioned at the ends.
The first block
In each lifting system
there is a single 1,400 metre long cable
that is lengthened or retracted
to raise or lower
the load as required.
Each of the cables
passes through a lifting beam
which makes it possible
to adjust its length
to the nearest centimetre.
At the other end of the cable
five anchoring points are attached.
Once the four lifting beams
are connected to the gigantic structure
it is lifted a few centimetres
and the balancing of the entire structure
is done at this precise moment.
Once the balance
is perfect
the block is lifted,
moved over to the construction zone
and then placed on the ship.
High precision manoeuvring.
On the ground
the slingers direct the operation.
They give precise indications
to the gantry crane operator
so that the gigantic structures
fit perfectly together.
Perched 100 metres above the action
Jacques Perri is the pilot
of the gantry crane.
He has been working on these construction sites
for 16 years.
Thanks to its very easy handling
the gantry crane takes
less than three hours
for a block of more than a thousand tonnes
to fit perfectly into another.
It took only nine months
for the Meraviglia to take
its definitive form.
But although it is fast
manoeuvring these mountains of steel
is still dangerous for the workers underneath.
Jacques Perri
has no margin of error
when he is moving a giant block
with a simple joystick.
The blocks assembled
by the gantry crane
were lifted a few metres away
in a hangar over 900 metres long.
This building is entirely dedicated
to welding the 300,000 pieces
of sheet metal.
This is a stage where workers
are needed to replace
the less skilled machines.
Marianique has been a welder
on the building sites
for five years.
For the Meraviglia
everything must be extremely precise.
Yet other welds
can look perfect
but conceal serious imperfections
because the metal can change
shape or retract.
These welding problems
are difficult to detect
and become much more serious
when the liner is already assembled.
It breaks here
and you can only see afterwards.
These two towers
are placed on top of each other
and we add a metal
that melts a very small layer
like glue.
If it breaks
it can collapse.
There are tons and tons of metal
and a crack
will continue
until it finds
an end.
But the problem is
that it can cause
kilometers of cracks
so it can be very serious.
And so the security checks
are extremely strict.
The assembled sheets
become increasingly sophisticated
as the first fittings are added.
We are going to do the armament,
the ventilation ducts,
the cables and the pipes.
1,500 kilometers of cable
will be concealed
in the ceilings of these panels.
The aim is to assemble
the blocks that are already equipped
with maximum functionality.
This saves a considerable amount of time
compared with assembling
the floors of the ship
and then equipping them.
But this strategy is only effective
thanks to the gantry crane
that dominates the port.
Investing in this 30 million euro
steel giant was a superb choice
for the shipyards in Saint-Nazaire.
Coupled with the giant assembly dock
that allows the construction
of two ships,
it has made Saint-Nazaire
the most efficient shipyard in Europe
and one of the quickest in the world.
Only around 40 months are needed
for each giant of the seas.
But it is also the research programs
and technological innovations
developed by the shipyard's engineers
that seduce the owners
of the Meraviglia.
For example,
these gigantic openings
at the level of the bulb.
These are the bow propellers
of the Meraviglia.
Installed at the front of the ship,
these propellers direct it
and coupled with the pods at the back
increase the maneuverability
of the liner even more.
On a liner like the Meraviglia
there are two ways
to manage the water.
Taming the water on the outside of the ship
so that it doesn't slow it down
and also managing the water on board.
This is a major challenge
for a floating city.
7,000 cruise passengers
and crew are going to live there
for many weeks.
Between the swimming pools,
passenger showers
and ship maintenance
an average of 200 cubic meters
of water per person per day
is required,
which means 1.4 million cubic meters
of water have to be produced daily
the equivalent of 5,600 baths
of drinking water per day.
It isn't possible
to store the amount of water
needed for each week of a cruise.
In addition,
to consume as little fuel as possible
the vessel must try to keep
its weight as low as possible.
This water will be stored
near the engines.
The heat released is such
that the thousands of cubic meters
pumped in from the sea end up boiling.
Steam then forms
and this seawater,
which has become fresh water,
will be recovered in tanks.
From 100 litres of salt water
30 litres of distilled water
is obtained thanks to the system
developed for the Meraviglia.
This process will be increasingly
used by ship owners
as transforming this seawater
into drinking water
uses the heat of the engines
which is both an economical
and non-polluting technology.
But this method cannot meet
all the needs of a cruise.
And so it is impossible
for the ship to collect
clean water in a port.
The engineers in San Azea
have responded to this challenge.
When the Meraviglia is docked
for several days,
another system takes over
a high-performance membrane
a sort of giant filter
that is so sensitive
it can separate salt from water.
These machines, called osmosis,
with their incredible
water filtering membrane
are a solution for small
quantities of water
but only the boilers
are capable of producing
the 1,400,000 cubic metres
of water each day
that the ship requires
during a cruise.
The quality of the ocean water
is a major environmental issue.
The Meraviglia must comply
with strict international guidelines
when releasing its water
into the sea.
It is treated to not add
any more pollution
to the ship's crossings.
The waters around Alaska
are under extreme surveillance
regarding pollution
caused by large ships.
The toxic waste
authorised in this region
is the lowest in the world.
But if the Meraviglia
travels from one ocean
to another,
from Alaska to the Mediterranean,
another problem that could arise
is the potential transportation
of harmful species
on the ship.
Mathieu Lorange works on environmental
issues at the Saint-Nazaire shipyards.
The quantity of fuel
and its distribution throughout the ship
varies throughout the journey.
The engineers have found
a way to counter this
and maintain a steady balance
on the ship.
This water could contain
species that are dangerous
to the natural balance
of sensitive regions
like the Mediterranean,
not to mention bacteria
hidden in the water from other seas.
Ultraviolet light
is actually used twice in this way
to kill bacteria on cruise liners,
a security measure that is enforced
by the authorities,
just as the treatment of fumes
that are released into the air.
The fuel used
by the Meraviglia
and all cruise liners
is a heavy fuel
of poor quality
that is usually quite polluting.
Cruise operators have therefore
been asking research laboratories
to develop a system
that can limit this air pollution
as much as possible,
in particular the large amount
of sulfur that is present
in the smoke emitted by the chimneys.
The Meraviglia takes full advantage
of this research
with the scrubbers,
a kind of giant shower
designed to limit the pollutants
released into the air.
They alone remove 97%
of the sulfur oxide
emitted by the liners' diesel engines.
The scrubbers are responsible
for trapping toxic fumes
by mixing them with seawater
before they escape through the chimneys.
The sulfur is mixed
with a special solution.
Once neutralized,
the mud-like result is stored on the ship
and then unloaded onto land
to be treated.
Polluting waste
is a major problem for the environment
but can also be one for the passengers.
In the design specification
for the Meraviglia,
the ship owner wanted to optimize
as much open air space as possible
for the customers,
the aim being to gain as much space
as possible on the deck of the ship.
The walks on the bridge
and the tanning sessions by the pools
are the most popular activities
for the passengers.
A computer simulates
the trajectories of the gas
leaving the chimneys of the liner.
From these results,
the exhaust chimneys of the Meraviglia
have been inclined in such a way
to avoid the fumes falling back
onto the decks.
There have also been openings
made in the chimneys
so that the air that enters
cools the gases,
as it is difficult to control
where hot gas falls.
By lowering their temperature
with cold air,
the fumes, that are often foul-smelling,
no longer surround the decks of the ship.
Measurements are constantly being taken
in the areas where holidaymakers
like to walk.
The comfort and the safety of the passengers
come first.
But the gases produced by the engines
are not the only consideration
on the decks of the liners.
It is not when the passenger
takes his glass
through the outer deck
that he receives
gusts of wind.
To simulate all types of wind,
a computer is also used
to calculate the air penetration
on the ship, as well as the corridors
the wind can blow down.
The shape of the ship,
combined with protective systems
such as large panels,
is optimized so that the wind
takes different routes
far from the holidaymakers.
To offer their guests
the pleasure of sailing
on the open sea,
miles away from the mainland,
with no inconveniences,
is the challenge for the Meraviglia,
and the passenger experience
must be flawless.
With this in mind,
and to combat the terrible sensation
of seasickness,
another innovation
has transformed the experience
on this cruise ship.
A process that is invisible
for the passengers,
yet very impressive
when viewed from underwater,
where the ship benefits
from huge stabilizers
like airplane wings,
measuring an impressive
17 square meters each.
These are wing profiles,
like airplane wings,
and they orient themselves
as the ship rolls.
They generate a force
that opposes the movement
of the rudder,
and somehow stabilizes
the movement.
When the ship is in port,
the stabilizers are in the return position,
otherwise there will be a problem
in relation to the position of the keel.
So in the port,
generally the stabilizers
are in the return position.
By limiting the vibrations
of certain parts of the ship,
or the effects of rolling,
the new giants of the sea,
such as the Meraviglia,
do all they can to eliminate
every annoyance,
starting with seasickness.
The 80,000 ton ship
can finally leave the assembly dock.
A total of 6 million hours
of work are needed to construct
the Meraviglia.
Today is the beginning of testing
and the start-up of the engines.
To begin with,
they have to fill the dock
where it was assembled
to transfer the giant
to another part of the site
just a few hundred meters away.
An important moment for the ship.
The first step for a boat
is when it floats.
When the boat starts to float,
we will try to ensure
that the ship is waterproof.
We will make sure
that all the compartmenting
is integrated
and we will start to put in service
the first safety systems of the ship,
the drying pumps,
and little by little
we will start to ensure
the safety of the ship when it floats.
That's the first step.
That's when the ship,
the metalwork,
becomes a boat.
And there it goes.
The ship is floating for the first time
and starts to leave the assembly dock.
This can only happen
when the tidal coefficient
is at its highest
and the weather conditions
are as calm as possible.
At this stage,
the ship is still an inert giant
with no functioning motor.
It has to be towed.
The liner is not going on a long trip,
but it has definitely left
its assembly dock for another
which does not have a gantry crane.
The Medevillier
settles into its new home.
Although from the outside
it may look ready,
inside the workers of the Saint-Nazaire shipyard
continue their work day and night.
The liner is far from being finished.
The 2,500 rooms,
the restaurants, cinemas and nightclubs
are not yet ready to welcome
the first passengers.
Thousands of workers and craftsmen
labour each day to ensure
the all-important deadline is met.
As these numerous workers
fulfill their roles simultaneously,
the technical teams begin work
on a crucial stage of the construction.
We need diesel engines
to run the alternators.
The first important step is to start
the heart of the ship,
which will produce the energy.
This is what we call the diesel engine
We start the first engines,
the first, the second, the third, the fourth,
to have electric production on board.
If you don't have that,
you can't keep going.
It's really one of the most important
shafts in shipbuilding.
The computers are turned on.
We can now check that the Maravilia
reacts perfectly to the detection
of a fire, for example.
A fire can break out at any time
during the construction phase,
but a fire that starts while the ship
is at sea can quickly become a catastrophe.
Ships are very close-knit.
There are fire branches, bridges.
Networks are autonomous.
They are really disconnected by branches.
If we ever lose a branch,
we continue to have electricity
and servitude in the other
branches of the ship.
There is a lot of redundancy
that allows us to always
ensure continuity of service,
even if there has been a major incident.
There is insulation everywhere,
behind the ceilings, the hatches.
Everything is insulated,
whether it's a fire or a fan,
but almost all the bridges
and hatches are insulated.
Noise pollution is one of the major
challenges in the construction
of new-generation cruise liners.
In addition to the propellers
developed for the Maravilia,
which considerably reduce noise pollution
compared to other ships in the same category,
at the heart of the ship,
the insulation work is extensive.
When the passenger is in his cabin,
he must not hear the cabin next door
or a permanent ventilation noise.
When he is at the restaurant,
he must not hear the engine noise
or the kitchen noise next door.
One of the main luxury criteria
on a ship is its silence and comfort.
Tests in the fitting-out basin
are not enough.
A real outing at sea is required
to properly assess the ship.
And so the Maravilia
is going to leave the shipyard
to face reality.
We are going to install
piezoelectric sensors
at different places on the ship,
at different velocities,
and we are going to see
how the ship vibrates.
This is mainly due to the use
of materials.
When a pipe vibrates,
we imagine that if between
the support and the pipe
we put a piece of rubber
or a cushioning piece,
it will not make any noise.
So we avoid metal-to-metal
contact with decoupling systems.
During these tests at sea,
extreme manoeuvres are carried out
and the behaviour of the ship,
its stopping distance
and its turning radius are assessed,
even if the ship's intelligence system
limits the possibility
of going too far in these tests.
We are going to push the engines
and we are going to proceed
with tests that we do not always do.
We are going to imagine
that we have four engines in service
and then we are going to put
an emergency stop on one engine
and then we are going to see
how the other engines
take up the load.
There are automatic unloading systems
because we imagine that
if the four engines are loaded
and if we automatically stop
an engine, there can be
a number of problems on board.
So the system will respond quite quickly.
It will cut off electric consumers on board.
It will try to regulate the load.
So today we have a relatively intelligent ship.
We are not like in the past
where before accelerating
we asked each mechanic
to put one more engine.
Now the system reacts automatically.
The Medevilla has reached
the final straight.
Inside, the finishing touches
have been carefully added,
all whilst keeping a close eye
on the schedule.
With €100,000 of penalty
for each day it is delayed,
the Saint-Nazaire shipyards
have been watching the clock
very, very closely,
as they do for the delivery
of each liner.
Every time we build
a new series of ships,
we feel like we've made the biggest
and we'll never make it bigger.
And every time we have customers
who push us to do more,
to make it bigger,
to make it even more impressive
for the passengers.
We have taken industrial bets,
technological bets,
and we see that it works,
and we are very happy.
The Medevilla is not yet
out of the shipyards,
and yet already,
a new series of liners
is under construction.
Following its lead,
and thanks to the numerous studies
that were carried out
to make this ground-breaking
cruise liner,
the new ships built
on the shipyard
will follow the path
of innovation
and environmental protection.
It's true that we want
ships to be more and more
economical, more and more ecological,
more and more connected.
The two key words for me
will be green,
greener ships,
why not sailboats.
I think it's something
that will be important
for the passengers
in the years to come,
including in the geographical
zones in which the ships
will have to evolve,
with more and more environmental
requirements.
It's like at home,
we are now a generation
who are used to being connected,
so the ship should be connected.
This ever-present desire
to innovate,
as seen with the Medevilla,
will lead to bigger and bigger
ships being built in the future.
Less environmental waste,
widespread electric propulsion,
and ultimately no more
diesel engine at the very heart of the liner,
even more efficient water
management, solar panels
that are able to operate an entire ship.
The challenges to come over the next
few decades have definitely
not finished transforming
these so-called giants
of the sea.