Hey guys, welcome back to the channel.
Today we are upgrading the service here in Metuchen.
Got a little late start because I forgot to buy the hub for the top of the meter enclosure
that I got.
It's a special type of hub that's larger for the meter main disconnect that we'll be installing.
So welcome back to the channel and let's get started.
Fill the load, all right?
Shed the load.
Shedding the load helps prevent any arcing from happening when I go up onto my extension
ladder and disconnect from the service utility.
When I cut the conductors, there's no arcing because there's no load.
Take this meter out of here.
I'm not exactly sure how this even comes out.
Look at that.
It doesn't get any easier than that.
Here's the part where everybody says, how do you do that live?
Well, you don't give it a path to ground.
That's why we use fiberglass ladders as electricians, that's number one.
And number two is we don't short circuit between the L1 and L2.
This is kind of funny.
I love how they did this here.
They cut that right out.
I guess the line says behind that.
That's so weird.
I don't get it, but okay.
A long way down.
This is a single phase service consisting of two hot 120 volt legs and one grounded leg
that we'll call neutral.
Copper.
How about that?
Copper drop.
Wasn't expecting that.
This wasn't really a copper drop from the utility,
but rather the previous copper service had been attached to the drop
and the drop legs from the service were too short,
so we left them in place so we could connect to them later.
Then again, this is copper coming down from there
because my hook isn't really very long here.
Where I am here in Colonia, New Jersey, the utility company is PSE&G.
What will happen once we pass the inspection,
the electrical inspector from the town will send in what's known as a cutting card
to the utility company alerting them that the service has been upgraded
and whether or not they want to drop a new service from the transformer out on the street
is up to the utility company.
Now we're ready to rock and roll here.
The idea is I'm just going to go up there and try to cut some of this away.
I want to cut it down here.
I thought I could use the bandsaw to cut this riser here up on the ladder,
but this turned out to be a bad idea as the bandsaw blade got caught up
in between the conduit as I was cutting it and made it very difficult,
and I actually couldn't use the bandsaw because the blade got so badly damaged.
I came back with the hacksaw and made my final cut
before tearing it down off the side of the house.
These two wires right here are our grounding electrodes.
It looks like it's from the old telephone box and the cable television.
So that's there in case any lightning induces voltage on any of those lines.
We're channeling it to the ground.
Nowadays we have to put a terminal bar underneath or within sight of the disconnect.
It doesn't actually say that, but it's outside.
Just a spot to land these grounding electrode conductors
and connect to the grounding system.
Previously this was the grounding system.
This piece of pipe right here actually is part of the service grounding equipment,
and it gets bonded back in the old panel,
but nowadays we can't attach this to the ground like that to get its ground.
We have to get dedicated terminals,
and I'll put that section of the National Electric Code right here so you can see it.
Okay, this section came into the code probably about 20 years ago,
and 250-94A-4 specifically states that it be mounted at the service equipment,
be securely mounted and electrically connected to an enclosure for the service equipment,
to the meter enclosure or to an exposed non-flexible metal service raceway,
or be mounted at one of the enclosures and be connected to the enclosure
or to the grounding electrode conductor with a minimum 6-oil copper conductor.
We have a number 2 aluminum conductor passing right through our inter-system bonding terminal.
More on this later in the video.
I think we'll go downstairs now and start disassembling the electrical panel.
Let's go.
All right, so most of the panel here is labeled, so I'm going to do the same.
I'm going to label these circuit breakers here,
so when I put everything back in, that'll make it easy for identification.
So the idea here is to take out all the cables and then disconnect this wiring right here.
As you can see, this will probably come through because it's cut outside.
And then we're probably going to do something similar coming into the new panel, I think,
but I'm not positive just yet.
It takes a lot more time now, but saves time later.
Like I said, this doesn't have to land in the same spot later on,
although there's a good possibility it might.
We just need to know what they are, so when I look at the panel legend later on,
I'll know that that's what this circuit was hooked up to last time.
The circuit's still going to the same place, because here's the panel.
And as you can see, somebody took the time to label everything real nice,
so that's how I'm going to do it too.
The first electrical service upgrade I ever did, I believe, was in 1993,
and I was just a helper.
But I learned a lot, and my pal Tom, if he's watching this video, I'm not sure,
he taught me how to do a 200-amp service the first time,
so I owe Tom a lot of credit for showing me along the way.
As for being an electrician, I always like to say
that we're all on the same ship in different cabins,
and one day you'll be on the top deck.
Okay, so let's take a second here.
What we call this is a quad circuit breaker.
This is when you need space inside a panel here,
and you can't put a twin in because you need 240 volts.
So this section of the circuit breaker with the common trip is for the 240 volts.
I'm imagining this goes out to the swimming pool, I'm not sure.
What that does is when it connects onto the bus bar,
you need to have L1 and L2 to get that 240 volts.
With the common trip, you meet the code,
although I'm not sure if this panel's recognized to take twins.
I don't think it is.
This is just a 100-amp 20-circuit panel at a minimum.
Oh, wait a second, I got to tag these here.
This is 18.
The panel I'm putting in today and that I normally put in
is a 4080 200-amp main breaker panel.
So 40 full-space circuit breakers will fit in here,
but up to 80 of the small twin circuit breakers or circuits
can fit inside this panel legally.
It's important that you check that.
And when you open up the panel door,
there'll be language up there showing you whether
how many circuits can actually fit onto that bus bar.
You can't just put in twin circuit breakers because you want to.
They have to be rated to be put inside that panel.
This is the real meat and potatoes part of the job right here.
And so this previous mounting board was on there very well.
I tried to pull it off by hand thoroughly.
Most of the time that happens, they'll just come right off the wall.
Unfortunately, it wasn't put in very well.
But this was in there and it wasn't moving,
and I felt that it didn't need to be removed.
And so I just built upon this, and we just built it out
so we could put our new 3-quarter-inch plywood backer board,
attach this, and then the conduit's going to come through the hole
into the back of the panel, as you'll see here momentarily.
This is the hole, the knockout, that we're coming in.
It's the upper left-hand corner here, okay?
This is the PVC.
So that's going to be approximately sitting on the board right here like this.
I generally like to use the 2-inch corrosion-resistant core screws
to attach the backer board to the mounting blocks I put behind it.
Here's our pilot hole.
I think I'm going to go a little bit to the left here.
Just a little.
All right.
You want to make this hole just a little bit larger
than the conduit that's going to fit through there
so you have a little bit of play for when you mount the panel.
Here I'm installing the 2-inch male adapter,
and then I'm going to slide the panel over and connect it with a lock nut
and drive a couple screws to attach it to the board.
The enclosure here and the hub, I can put one right on the right.
It's going to line up just right so I can go straight up
without doing any offset.
This worked out just fine.
So the LB that we were just playing with down in the basement area,
on the outside here now,
is directly below the knockout
you see in the bottom right-hand corner of the enclosure.
It's real close to that window,
but there is no code prohibiting you from putting it close to the window.
The previous service is right there as well.
I don't know where that came from,
but I see that in the comments once in a while that it's too close to the window.
That never made any sense to me.
If you have an opinion on that, do me a favor and leave it in the comments
because to me that doesn't make any sense.
So before I glue anything,
I make sure that the conduits are going to fit in place.
I always do a little dry fit
and then come back and glue it
and make sure everything fits in there just right.
This one went pretty well
considering I used the existing hole.
I just had to make it a little bit bigger
between the outside and the panel on the inside.
And then the screws that I had were a little bit short.
I'm sorry.
The conduit was maybe like a half inch away from the wall.
So I had to come back here
and I had to install some spacers on my anchor screws
as you'll see here in a moment.
Yeah.
See, I got to hold them there and I had to make them shorter
so they fit in there just right.
And so the strap wouldn't break in the weather.
It broke.
I broke a couple of them here doing this
that I didn't show you in the video
because I had to run out and get these spacers
and make it just right.
And so that's what you see me doing here
is attaching the spacers
so I can get the two straps on the conduit
between the OB and the service.
Here I am strengthening the base of my riser
by putting in the male adapter into the hub.
Okay, now I'm going to glue
and I got a short piece right here
that's going to sit inside this male adapter
and also allow for the bell end of the two inch conduit
to fit right over it,
giving this extra strength here
at the connection point to the meter.
I think a subscriber
or somebody in the comment sections a few months ago
suggested I do this.
I actually did a video on this.
That's in my video description list.
And this just makes for an extra heavy-duty,
sturdy installation of the riser.
There, now you see this bell end
is going to fit right over that short piece that I cut
and going to make this a lot more stronger
than it would be if you skipped this step
and just go right into the connector
rather than doubling up, so to speak,
where it connects to the meter here.
I really like this idea
and I do this whenever I can now.
If you're an electrician and you do this too
or if you've learned from one of my videos,
let me know in the comments
because I learn from the comments myself.
I get better and better at this trade every year
and I think most electricians would agree with that,
that if you're just staying steady
and you just know how to put in light fixtures
and you haven't gone out and done some other stuff,
then you kind of haven't advanced much in the trade.
I think you should be always striving
to do your best and to install
or make your installations better
than they were a year ago,
two years ago, five years ago,
and I think I am doing that.
I've been doing that my whole career
and I think this is a really good wiring method.
Now that I have the riser in place,
we really want to secure it as quickly as possible
so it was a windy day so it doesn't fall off.
So we're going to mark the straps
and I'm going to come up with my SDS Plus
and I'm going to drill in a quarter-inch hole
for my quarter-inch anchors
to secure this riser.
I wound up using longer screws
so they went through the anchor
and through the concrete
until I met the sheeting around the house
that the brick is actually mounted to.
So these aren't going anywhere.
So yes, I used the plastic anchors
but we went right through the brick.
I'm not sure if this is real brick here.
I don't think it is.
I think it's just like a cover they put over the sheeting
because once I drilled these holes
through the brick, I was hitting wood
and that's why I used these long sheet metal screws here
so it could get attached through the brick
and into the sheeting of the house
making these straps very useful.
Originally, I had cut that piece of PVC
a little bit too long
and so I had to put it up on the ladder
and get a measurement and cut some off.
So my main goal here is the top of this riser
where the service head is going to be
has to be above the top level of that window.
So in Section 230, TAC 9 of the National Electric Code
that's all about services
they'll mention that you have to be
three feet away from the window.
Part of that same section of the code
also has an exception
and the exception is as long as you are above
the top level of the window
then you're good to go and away we go.
The purpose of this code here
is so if there's ever a fire
a fireman can actually get into that window
without having to climb over
any of the electrical wires for the house.
Makes sense, doesn't it?
Earlier in this video
we discussed the inter-system bonding device
and what this is for
is for other stuff you have to your house
such as cable television
or maybe you have a data internet connection
or a telephone system
or a satellite system.
All those metal devices
need to be grounded and bonded
to the grounding electrode system
here in case they get hit
with an induced voltage
caused by a lightning strike or a line surge
from the utility company.
So what we're doing here is we're bonding
those metal parts
to our grounding electrode system
through the inter-system bonding device.
And like I said previously
these have only been in the code for maybe
20 years or so
whereas before they would just clamp around the metal
pipe of the service.
But being that this is PVC
there's no sense in bonding
to a piece of PVC because that cannot conduct electricity.
Alright, so we should
be ready to go now. I'm going to go down to the basement
and start putting in the
branch circuits. We're going to reuse
the connectors that were there before.
There's no sense in changing them.
They're fit for that particular style
armored cable BX. But let's see
what we did here so far.
Obviously you saw me getting the LV in
and then this portion of the service
the load side down to the panel.
This piece of aluminum
wire here is going
to become the equipment grounding conductor. It's left over
from the number 4 grounding
electrode conductor which is number 2.
That's what this is. This used to be number 4
copper but it's number 2 aluminum so that's fine.
And then of course all of our
bonding takes place here. This is the
neutral that comes
from the meter up above.
That's right here. So it's obviously
bonded with the enclosure. It comes
like that. So we run all of our
grounding electrodes here. There's only one
because we drove the ground
rods over here yesterday
and we're going to attach that
to the copper water pipe
in the basement and that's going to
bridge or bond
the two conductors.
So that comes back to here
so that's good.
Downstairs we've got to separate our grounds and neutrals
and
what we're going to do
is start tying in those panels.
This is the grounding electrode conductor
so I've got to come back with the hydraulic concrete
here and here and shore that up
a little bit.
Then the last thing we'll have to do is put our
riser
service entrance conductors to
meet the service drop and tie in at the end of the day
like most jobs.
So thanks for watching this video.
If you've watched this video this long, I thank you
very much. Hit the like button.
If you like this content, hit the subscribe button.
Thank you. So this panel
had been updated not too long ago. I believe
the sticker for the approved sticker
was from 2022
so it was done recently.
The trouble is now that we have
an electric vehicle charger going
in to the calculated load
of the service, the 100
amp main was not going
to be enough to handle all the new electrical
loads including some mini
switch systems that have been done recently also.
So this panel was definitely a
candidate for an upgrade or the whole service
rather, not just the panel.
That's what we were there to do.
In my first video, we did
the electric vehicle charger and a lot of the grounding
and of course this video is about the whole
service upgrade.
This panel I believe
had 30 circuits in it.
We're going to be adding the Tesla EV charger
which takes up two spots and then
of course the required surge protection which
takes up another two spots. When we were done,
the 40 circuit panel had
approximately 34 circuits in it
and so there was room for six more
full-size circuit breakers
but on the outside
what we did was we put a feed
through load center
on the load side of
the main breaker and
I believe in a year or two or sometime
down the road this customer told me he's going to be
building a garage on some vacant lot
he has next to the house here.
So we'll be able to come out of that panel
which has eight full-size circuits
and the capacity for 16.
So plenty of room here
to add circuits in the future
of this house.
This panel had a few multi-wire branch circuits
and a multi-wire branch
circuit is when we have a red
and a black conductor
and they share a common neutral.
This is called a multi-wire branch circuit
and what we need to do
to make sure that this multi-wire branch
circuit is safe is put this on
a double pole circuit breaker
so should you work on one of the circuits
both of the circuits are off
and there'll be no current returning
to the source of the neutral to injure someone.
Another danger of
using the multi-wire branch circuits
is losing a neutral.
Should you lose a neutral
on one of those two circuits
the
laws, electrical laws of Ohm's law
series circuit
and a parallel circuit
if you lose a neutral in a
parallel circuit
the rest of that circuit becomes a series circuit
and the rules for
resistance change so something that has
low resistance like a television set
would receive a lot higher voltage
connected in series than it would
obviously when connected in parallel.
In a parallel circuit
voltage is the same
across all the resistors in the circuit
whereas in a series circuit
the resistance
is the total
of voltage drops
across each of the resistors
equals the sum of the voltage
supply so something
that has lower resistance
will see a higher voltage
in a series circuit.
We're going to transition
we'll get a female
3.25 inch female PVC adapter
and then a small piece
of flex
so we need a
3.25 inch female
PVC adapter
and then we need two straight
non-metallic seal tight
connectors and then about
a foot maybe a little bit more
of the flex. Alright we're coming
from here
to here
something like that
we take
the lock nut off
and then we slide the threaded
end of our female connector
see how it's threaded like that
so now we can transition
from
the rigid PVC to the flex
let me show you
this one just screws right on these are nice connectors
now so on this side
we will
button it up
this is just
you can use this outside obviously
this yellow
lock nut here this ring
actually acts like an o-ring
to keep the water out
we'll just leave it on there for now
we could take it off but
what the hell
let's party
I'm going to cut off
a little bit more of this PVC here
that's how you make that
transition there
nice
so that portion of the condo that I was working on
was actually the circuit that I ran
in the first video of this series
for the electric vehicle charge
I used 3 quarter inch
PVC conduit on the inside and on the outside
and I used
two number 6 all copper conductors
which are good for
65 amps
and we put these on a 60 amp
circuit breaker
and the 60 amp circuit breaker
is going to supply a 48 amp
electric vehicle load for the
Tesla charger that sits on the exterior
and if you haven't watched the first video
I'll post a link in the description
so be sure you do that
and of course if you like this video
do me a favor hit that like button
and subscribe if you want to see more content
just like this
so it's getting towards the end of the day here
and I had a problem with the microphone again
it came undone the battery went dead on the
transmitter or something I'm not exactly sure
and so I was kind of
not panicking but I got to get this work done
it's starting to get dark and it was already past 6 o'clock
and usually I tell people to power me on
by 6 o'clock or rather
it was close to 6 o'clock
I do remember that this was on a Saturday
and my wife and I were going out
to see some bands play that night
my friend Tom's band
Into the Void
they are fantastic
so I got limited
camera
footage here because of the dead battery
issue and because I was just trying
to get this done as quickly as possible
and it came out pretty good I got to come back
do some hydraulic concrete
down at the LB where it comes in
it's like 10 after 7 right now
so it is what it is
it was ok with me coming back
here's the Tesla charger
came out really really nice
most of the wiring is on the inside
schedule 80 PVC
and the meter main
the service
riser came out
pretty good it's way up there I brought my 32
foot extension ladder with me
today
it was a lot there let's go downstairs and take a look
and see the rest of the job
ok so here
we drove the ground rods on the outside
and then brought the ground rod
the grounding electrode conductor
that goes to the ground rods to our
copper water pipe right here
alright this is permitted by article
250 text 64 I don't know the section
right off hand but I'll probably put it up on
the main video and then here's our number
2 aluminum for the
main grounding electrode or the required one
for the copper water pipe
I wish they would change the language
you know say a primary
grounding electrode or
secondary the ground rods
in this particular situation are
supplementary that are required
when you use
the copper water main
as your grounding electrode
obviously we patched up the
I'm using my iPhone here
because the battery on my GoPro is dead
we used the hydraulic concrete to patch
the hole it was a little bit of a blowout
but you can hardly tell I was there now
look at that that looks beautiful
alright I'm going to stay being an
electrician not a mason
over here we have the new panel
I really wanted to put
a pull chain light over here for him but I just ran out of
time we came into
the back of the panel
after mounting as you can see
we pulled it out a little bit
we're going to have to reconnect
now my
headlamp is going off
we're going to have to reconnect the hose for the dryer exhaust
he did that I told him we had to
move it he moved it so he's going to take care of that
but I am going to come back and put in the
receptacle for the dryer
the gas dryer over here
the igniter
and then here's our circuit for the
electric vehicle
sorry for the shadows
it's like I said it's late and my wife
is waiting for me to get home and have dinner and we're going out
so that's going to be it
for tonight boys if you like this video
make sure you like and subscribe thank you
two weeks later we
had the final inspection so I was there
to meet the inspector in case he had any problems
and of course to put the hydraulic concrete
around the LB at the bottom which we did
very happy to report that of
course we passed without any
issues if you like this video hit the
subscribe button and of course I'll see
you on the next one thank you guys