Boss Industrial 27, 32, and 37 Ton Log Splitter Assembly

DirtFarmerJay
309 followers
204 Video Views·Oct 17, 2024
with a little DIY skill and some help
with heavy lifting putting together the
WD series horizontal vertical log
splitter is simple and easy we'll
assemble the 27 ton model today but
these instructions also apply to the 32
ton and 37 ton
models this video will be used as a
supplement to the assembly and operating
instructions in your owner's manual
please read and review all instructions
before you
begin the first step will to be to
unpack the crate use a 14 mm wrench or
socket and drill to remove the bolts
along the bottom holding the metal crate
to the base there's no need to remove
any of the other bolts it'll take two
people to lift the crate off in one
piece and set it aside next use scissors
or a knife to cut the straps holding the
Machinery components in place if any
parts are damaged or missing please call
customer service at
80078
2677 before proceeding use your owner's
manual to identify each of the hardware
kits that are pre-sorted for assembling
specific parts of your log splitter
arrange the tools you need and assembly
Hardware on a clean surface before
beginning assembly you're ready to
install the tongue assembly to the
reservoir tank set the tongue Bean
between the upper metal plate on the
reservoir tank the M10 Hardware kit that
you'll use to attach the tongue assembly
to the reservoir tank is found on the
beam support bracket on the tank use a
16 mm wrench for the bolt heads after
the flat washers are installed on the
bolt use a 17 mm wrench to tighten the
lock
nuts now it's time to install the wheels
there are two methods you can do this
method one is to set the reservoir tank
off the ground on blocks and slip the
wheel axle assembly into to the sleeve
from the side and secure it with a
castle nut and split pin the castle nut
is tightened with an adjustable wrench
from underneath the split pin is
inserted through a recess in the castle
nut through the hole on the axle end the
end of the split pen are bent back using
needle-nose pliers around the sides of
the nut to secure it repeat for the
other side method two is to tip the
reservoir tank up on end and Slide the
wheel axle into the sleeve and secure it
with a castle nut and split pin use an
adjustable wrench to tighten the castle
nut from the side the split pin is
inserted through a recess in the castle
nut through the hole on the axle end use
needlenose pliers to bend back the ends
of the split pin around the sides of the
nut to secure it repeat for the other
side the tires are pre-inflated from our
f Factory but check the tire pressure
before use the tire should be inflated
to 30
[Music]
PSI the engine and hydraulic pump are
pre-assembled making mounting them easy
use the hardware from kit 5 to secure
the engine pump assembly to the engine
mounting plate a fixed to the hydraulic
fluid tank insert a vibration isolator
between the engine and mount plate at
each of the four mounting hole positions
when inserting the bolts through the
mounting holes secure the bolts with the
nuts and then tighten them using two
wrenches now we're ready to up in the
beam assembly while it is possible for
one person to complete this step for
safety sake we recommend two people lift
and stabilize the assembly using a pry
bar or claw hammer remove the crate
bottom plywood that secures the beam
assess L while having a person stand on
each end of the shipping crate base
pivot and lift the beam assembly onto
the wide foot base so that the
Hydraulics are at the top of the
machine one person will stabilize the
beam assembly while the other person
will lift the tongue and roll the
reservoir tank assembly into place
position the tongue and tank assembly so
the beam support bracket is between the
two tabs on the beam
Slide the clevis pin through the Align
holes and secure it with the spring
clip connecting the hoses comes next
match the numbered labels to ensure
correct connections are made begin with
the oil suction hose labeled number one
then tighten the hose clamps over the
hose and pipe under it using a flathead
screwdriver or nut driver now connect
the pump valve connecting hose labeled
number two the red plug inside the end
of the hose must be removed before
assembly thread the nut on the end of
the hose onto the top of the hydraulic
pump tighten the hose to the nut using
two wrenches one on the nut and the
other on the body of the pump failure to
use two wrenches will result in an oil
leak when the machine is operated now
connect the oil return hose labeled
number three again the red plug inside
the end of the hose must be removed
before assembly before affixing the oil
return hose to the reservoir tank ensure
the O-ring sits inside the filling slot
tighten the hose nut using a 27 mm or
adjustable wrench now pivot the beam
into the horizontal position by
carefully lowering it to rest on the
trailer tongue and jack stand assembly
as you do so brace the foot of the stand
with your foot to stop the unit from
Rolling forward the beam locks
automatically as the spring-loaded lock
will snap in place when the beam is put
into the horizontal position now rotate
the control handle up from underneath
the valve on the handle link remove the
bow tie cotter pin and cevis pin from
the valve and use this Hardware to
secure the operator handle
vertically now install the log trays
using Hardware kit number 6.9 one the
bolts connect through the main beam and
secure the log trays on both sides of
the unit the tray mounting brackets may
need to be flexed slightly to get all
the holes to align then insert the bolts
thread on the nuts and tighten them
using a pair of wrenches or
sockets Mount the manual container on
the side of the main beam using Hardware
kit
6.2 lubricate the beam lightly with
engine oil before using the log splitter
do not use grease to lubricate the beam
the log splitter is shipped without oil
in the engine or gas in the tank the
engine must be filled with the proper
amount and type of oil as specified in
your engine owner's manual fill the fuel
tank with a fuel specified in your
manual as well you'll also need to fill
the hydraulic fluid tank to the proper
level use the hydraulic oil your dealers
provide or any of those recommend ended
in the log splitters owner's manual
check the hydraulic fluid every time you
use the machine your log splitter is
ready to use here are a few tips to keep
you safe and your machine in top
operating condition first always check
the tightness and condition of bolts
nuts clamps hoses and the wedge number
two check the hydraulic fluid level each
time the machine is used and fill as
needed number three make sure the
machine is always opera on a flat and
stable surface and chalk the wheels to
stop the unit from Rolling when being
used if you have any questions while
assembling or operating your boss
industrial log splitter our customer
service department is here to help give
us a call at
80078
2677 thank you and enjoy splitting logs
like a boss
