Lecture 28 : Activities of emission (Part-2)

IIT Kanpur July 201
20 followers
2 Video Views·Sep 6, 2024
[Music]
welcome back to the next lecture in the
course carbon accounting and sustainable
designs in product life cycle management
we're discussing about the activities of
carbon
emission we saw in the last lecture how
an organization is having certain flows
of energy material and information that
helps you to generate orders orders are
also very important when we try to talk
about the supply chain from a little
Upstream level we also try to saw the
temporal level and spatial level
decisions certain pointers in the
previous lectures here I would like to
continue and try to talk about the
carbon emissions which was the last
illustration that we took in the last
lecture the carbon emissions which are
here as an input to the system that is I
call it as organizational carbon
emission that could be direct or
indirect as Professor deu Philip also
mentioned I would like to talk about a
little more detail in direct and
indirect carbon emissions and these
would be taken in the models that we try
to see so organization carbon emission
that is
there this could be
either
direct production carbon
emission or indirect production carbon
emission
so when we talk about the direct
production ciss uh this is uh um majorly
the direct manufacturing or processing
of the products resulting in direct
alteration of physical or chemical
istics of raw material or semi articles
indirect production carbon emission
cannot be seen directly or cannot be
calculated directly this is a range of
activities that provide support or
assistance to the direct production
activities such as procurement
management equipment maintenance Quality
Inspection functions and so so there
certain sources of information or C
intricate sources of information could
be there which are contributing to the
carbon emissions in direct
manufacturing because it cannot be
assent at the supply chain level
directly that is why we try to divide
the
facility level by level we'll put it as
level
by
level
allocation so so direct carbon emission
or direct production carbon emission
when we try to talk about it is coming
from an
organization right so this production
direct production so this direct
production carbon emission is coming
from where it is coming from production
line production
line
carbon
emission right it could be production
line or it could be maybe the process
that is there the uh equipment or
process carbon
emission when I am talking about the
production and carbon emission or maybe
equipment or process carbon emission I
can just suppose if I try to draw a
Power curve line you see so this is
my uh machine or a equipment that is
there that is uh having a stable
production right so here I would like to
plot a power
curve power curve for
a stable
equipment so what happens first
equipment is off then at time this time
is
going right at the off position no power
when the material is switched on at time
T1 there is a rise in power so this is
my power in the y-
AIS with this Rising power it rises is
to only when the machine is switched on
but no load on the machine is there that
is the lighting in the machine is there
the motor has started rotating but
there's no load in the motor so the
power Rises to this level I will call it
as at time T1 the power is P1 right so
then uh at certain level when the main
motor is still not working or off at
pre-processing when we switch on the
mate motor at time T2 the power Rises to
the
level
P2 so at this
level we call it as the machine is now
ready to work the process has not
started but when the processes started
here and at this time the Machining has
started so here you see at time
T3 the Machining has started and the the
process has started here here power
Rises to level P3 I will try to bring a
demonstration when I will try to show
you a machine working machine switching
on I will try to see here the power is
machine spindle starts rotating then the
power Rises to P2 then the machine
starts cutting that is the power Rises
to P3 till the time the cutting happens
the power that is there in the stable
machines is P3 so this is the power
being consumed once this process is
completed the machine is Switched Off or
machine so once this process is
completed the machine spindle stops the
Machining but it is still rotating
because it is still rotating it comes
out to level P2 only so here at time T4
the power is at P2 again what happened
at this time from T4 to T5 I would
say the preprocessing is still there I
will put it here this is
my main spindle
off spindle off this is spindle
on right this
is
process on process on or process one is
happening right here also process is off
but the spindle is on
so what happens between T4 and T5 is
that the machine has stopped its
Machining process for instance the
machine was doing a drilling this
drilling is now stopped now once the
drilling is stopped but the spinder is
still rotating because the spindle is
rotating the energy is being consumed
here the energy is still at level P2
here spinder is rotating this is my
setup time this work piece would be
removed another work piece would come
this time this power is at P2 when again
the machine starts working it will again
rise to level P3 provided that the
Machining the hole whatever you're doing
is all
similar it again Rises to level P3
here this is I would say process
one this is process
two and so on it keeps on going till the
point you switch off the machine first
you switch switch off the spindle then
you switch off the machine and it comes
down at some point maybe I would say T6
and t7 the Machine is off so here it is
again
process on
here this is for
a stable equipment let me will try to
see if the equipment is not stable if
the equipment is using variable power
input so for
a power curve for
a
fluctuating
equipment right here let me try to see
what happens it is not always the
constant power when the machine is on
the machine will still vary for a
production system that is fluctuating or
for a requirement of the Machining uh
Dimensions which are fluctuating the
power will keep on changing here what
happens the power would rise at certain
level machine is switched on spindle is
on but the spindle is off here the
spindle switches on the power Rises to
this level and this is my Machining in
the Machining you could see
certain changes for instance if it is a
milling machine meing machine is what
you try to cut a profile a profile where
the material depth is higher the more
power will be consumed the when the
depth is lower the uh Power consum will
be lower accordingly this power might
vary here the spindle is again on but
Machining is not happening the second
set of Machining if it is happening for
the similar material it will again
follow this kind of path it will keep on
going you can put the times similar to
the above T1 T2 T3
T4 T5 T6 and
t7 it could be power P1
P2 and I'm putting a level power maximum
P4
here and the minimum of this is minimum
that is
P3 that is for a fluctuating equipment
the
power remains
between P3 and
P4 between P3 and P4 power remains and
this is a fluctuating equipment that is
there but still this is
our the power or the carbon emion that
is there now the carbon that is obtained
from this system is also
variable so here this was all my product
carbon
footprint that I'm mentioning here
now in the indirect production carbon
emission system so what do we have we
have our office
area or you call it as administrative
area we have
our heating ventilating air conditioning
systems or you call it as the Lighting
systems
that is the all the facilities all the
assistance that is being provided to
direct production activities that is
here whether it could be equipment
maintenance whether it is procurement
whether it is Management in the offices
and transportation is also part of
it right
so these are the sub areas of my
indirect carbon
emission these also contribute to the
product carbon footprint so I'm talking
about the direct and indirect once again
because I will come up with a model with
the whole connection that is level by
level from the system level to the
facility to the production line to the
unit level and try to see what are the
different Erp system information flow
what are the different manufacturing
ucation system and I will also try to
talk about Scara and how the level by
level allocation establishes a good
carbon accounting model so in accordance
with the allocation technique the carbon
emission resulting for direct production
are initially assigned to the production
line level subsequently these emissions
are transferred from the production
level level to the process level and
ultimately those go to the product level
the this is how it flows
here the allocation of the indirect
production carbon emission can also be
AED in a single step single step is we
try to take it as a percentage of the
direct carbon from the history data or
from the secondary data it could be
taken accordingly so there are multiple
ways to uh pursue in this Direction with
this I would also like to now talk about
certain strategies because we are
talking about now a unit level that is a
try to talk about how the
power curve is being developed let me
also try to now suggest certain uh ideas
or certain tips to increase the Energy
Efficiency now increasing Energy
Efficiency is very important because
with the degree of the detail of the
process chain that includes cycle times
and availability and further it NS an
assessment and further it needs an
assessment of the energy and consumable
input and output as well Tak into
consideration the factors such as
cooling water compressed air heat
certain ideas could be put in for
instance if I try to talk about the
production process
chains number one here the parameters
which are to be
worked upon
are
machines the linkages between the
machines the material
flow right then because we're talking
about the production process chains the
multiple chains we're talking about not
even one production line we need to talk
about the allocation of the times
between the chain allocation of the
Manpower allocation of the machines that
is we'll talk about the T
times and
availabilities right so this all makes a
production
program so this is my production process
chain
this now helps you to have an energy
analysis of the
production that is energy lysis
production that is a sustainable aware
production
that is we
get to have an analysis of input
output that is we have analysis of the
variables that's the input variables
output variables referring to the
integrated process model
that is when processes are not taken
together as a chain of the production
lines so here we try to understand
their input
variables output
variables and
so and like I mentioned we need to
measure the energy and media
profiles measure energy profiles we'll
measure media
profiles right this
is second
level first was the production process
chain then energy analysis production
then then we
have energy analysis
TBS that
is energy
analysis technical Building Services
where the parameters or the areas which
are worked upon
are identification of relevant equipment
analysis of the input output variables
refering it to a integrated process
model the same
part analysis
of the
input
or output variables at a higher level
than those were in the energy analyses
of production
itself and we have again measuring of
energy media
profiles
measure
energy profiles
[Music]
and
measure media
profiles for
developing a TBS please note this word
technical Building Services try to read
about it and we then we can discuss upon
this then comes the next point that is
load profile and energy cost and energy
Supply contract the load profile the
profile which I showed you here is my
load profile only this is my load
profile it is electricity load profile
or you call it as power curve so it is
now load profile
or
and
energy costs
so here the consumption pattern load
pattern consumption
pattern load pattern right then uh the
company from with the energy is coming
that is a source of energy because we're
talking about the energy cost we are
talking
about the source of
energy whether it is
procured or whether it is the inbuilt
energy or generated energy within the
organization then analysis of the cost
composition this analysis is more
important when we have energy
mix Energy Mix for example for heavy
machinery you can take energy from the
grid for the office operation or
computers you can take energy from the
solar powered or other systems that you
have within your organization so cost
composition analysis then also we have
the specifications of the contracts that
you
have
contracts and it
specifications that is energy that
you're getting from different uh
government system from the uh private
organizations what are the contracts
what are the loads that you have taken
so who are you paying for those loads so
those all are here pointers which are
considered or taken into account when
you try to talk about your Energy
Efficiency increase definitely along
with it I could also mention
about now from left to right Point
number five which is the last point that
is the simulation system we have the
integrated simulation and evaluation
production
system we
have simulation
of production system like the
semens uh PLM software you can simulate
your overal facility while designing the
facility for the specific product or a
set of the
products and you try to model them so we
have
modeling of
production this comes with the
appropriate
details it depends whether you would
like to have a complete model with the
the energy for each and every system you
have or you can have an energy analysis
or the simulation for the specific set
of the equipment and if those are are
similar systems being replicated in the
other parts of organization you can
project the same results over there so
depending upon the details or the
expenses that you are spending on the
simulation system that also important
then we try to integrate the measure
data and the contract specifications
so in a way when you try to simulate a
system and you try to understand that
the load required for your factory or
the facility that you developing would
be very heavy 50 megawatt right so for
this load what would you contract that
you have with the company that is
providing you energy or or with the
government from where you're getting the
energy right the load that you will
design for your own
organization so then we have integrated
evaluation of
production the last but not the least we
have our complete
integrative consideration of TVs
building right so this is the last point
for increasing the Energy
Efficiency so when we talk about the
increasing of Energy Efficiency and we
try to implement any of these pointers
so now uh to show you an example I would
like to show you a video uh of Toyota
production systems itself where they
will try to give you certain tips or the
systems that you're using to get to the
Target of Net Zero by 2050 and also
we'll try to talk about the data mapping
and data acquisition in the coming week
and then we'll try to see the models of
carbon accounting level by level how do
we rise from the very unit level to the
overall system to have a complete carbon
accounting for the product this is the
Toyota environmental challenge 2050 six
goals for creating a positive impact on
our
planet by 2050 Toyota will eliminate
almost all CO2 emissions from new
vehicles reducing CO2 emissions by 90%
from all new Toyota vehicles by 2050
will be a huge accomplishment for one of
the largest car companies in North
America that's why we are working today
to innovate and introduce Next
Generation power trins and vehicles
products like Prius Prime and marai will
move us closer to a low carbon
future by 2050 Toyota will eliminate all
CO2 emissions from the manufacturing of
parts and materials used to produce
Toyota vehicles to achieve challenge 2
the manufacturing of the parts and
materials we purchase to assemble our
vehicles will no longer emit CO2 this
goal requires close collaboration with
suppliers and partners to scale up
progress as we work toward Toyota's
vision for a better
[Music]
Planet by 2050 Toyota will eliminate all
CO2 emissions from Toyota facilities
Logistics and processes Challenge 3
demands we rethink the way we power our
facilities especially our North American
manufacturing plants where we assemble
Toyota vehicles because our region
operates some of the largest autom
manufacturing plants in the world this
is no small task so today we are
implementing projects that reduce our
energy consumption increase our use of
renewable energy and minimize CO2
emissions from Logistics
operations by 2050 Toyota will ensure
all Toyota facilities and processes
conserve and protect Water
Resources availability of clean water is
increasingly important especially to
communities in water stressed regions of
North America Toyota will continue to
manage protect and conserve this
critical resource that's why Toyota is
focused on reducing our water use and
exploring options for reusing and
recycling water especially at our
manufacturing facilities
by 2050 Toyota will ensure all Toyota
facilities and processes support a
recycling based society challenge 5
requires us to help establish a society
where sustainable materials are used and
waste becomes a thing of the past that's
why we continue to look for ways to keep
materials circulating and out of
landfills taking Reduce Reuse and
recycle to a whole new
level by 2050 Toyota will ensure all
Toyota facilities and processes operate
in harmony with nature we know Toyota
provides important benefits to the local
communities where we live work and play
we also know that each location has a
unique and important Natural Balance of
plants animals and
ecosystems that's why challenge 6
supports our efforts to minimize the
disruption of natural habitats as we
plan construct and manage our facilities
across North
[Music]
America so with this video we'll discuss
upon the certain other strategies in the
coming week where we will discuss the
data mapping and acquisition for
developing a carbon accounting system
thank you