welcome back to the next lecture in the
course carbon accounting and sustainable
designs in product life cycle management
this course is being designed by
Professor deu Philip Dr amand sing ooy
and Dr PR Pratap Singh I am amandip I
had discussed about the levels of the
manufacturing organizations and the
corresponding decisions we Tred to
discuss about the temporal level and
spatial level activities and their
decisions and we try to also see the
activities for the carbon evation in
which we saw the consumer and the
manufacturing organization connections
where the connections are taking the
same things
forward here I will try to talk about
within facility
how do we decompose the orders from the
Upstream of the supply chain if you look
at the levels of manufacturing design
here that we discussed in the last
lecture here one thing I would like to
discuss or put here is that when we move
diagonally
above in this
chart you know that the decision
flexibility is decreasing I will put it
here
flexibility is
decreasing because we are
moving above number one from the unit
cell to the overall system Design This
is one point spatial point if I say or
the flexibility is decreasing because we
have the most control at the product
design level itself product design level
when we have the product design we can
make any adjust ments in the C itself
once the process is designed based upon
the product design then the control
becomes little lower though we still
have a big control at the process design
level itself then when we go to the
process adjustments those are only major
adjustments the setup or establishment
of the process is there already it is
done that is why the decision
flexibility reduces and when we go from
special from the product level to the
supply chain level the product level
small decisions could be adjusted more
readily than the overall supply chain so
that is why when we move diagonally the
decision flexibility is here
reduced that is why we need to
understand the orders that we take from
the different suppliers what are these
order connected to and we need to
decompose the orders as per our
requirements in the very beginning as
far as possible so so what are these
before initiating any order it is
imperative for an organization to verify
several production details which
includes the product
information we need the equipment
information
along with it the process
information inventory
information and the procurement
information I'll put it
as Pi
I
EI p r
i
inventories I I and procurement
PCI these sets of the details or the
information we need to have when we
trying to put our
system or design our orders within the
facility subsequently once we have
gotten the information we try to then
proceed to develop our production tasks
assign production equipment based upon
the process information execute the
relevant uh process or processing
activity and we try to utilize energy
materials accordingly so let me try to
uh draw another block diagram here where
I have my organization this is my
organization or my
facility in which I have certain systems
different production lines or Department
whatever you call
I will call suppose if I
have equipment one one here there is a
machine that you have
here right and there could be another
equipment one 2 another
machine right a drill machine or so
and so on you could have
finally an
assembly assembly 1 one this
is my production
line
one so we can have another production
line similar to
this in which I
have my equipment line two first
equipment similarly I could have another
equipment that is line to Second
equipment that could be
maybe another uh 3D printers or so and
there could be assembly or assembly
might not be there there could be only n
number of equipment
only equipment 2
N right this is
my
production line two similarly we can
have I will put it as uh n number of
production lines
production line
M so this is
my
equipment
M1 equipment M2 and so on up
to
equipment MN
how do the production lines communicate
there is something known as material
handling this is a material handling
system that is the transport of the
material from one line to another this
could be put here I would put it
as
transport of
the
material right this is one I will put it
at transport of
the material to here so there could be
different phase this could be conveyor
line to conveyor belt there could be
robot this material hand system I'll put
it here it could be
uh conveyor belt it could
be pick
hand
Place robot it could
be turn plate
T plate is a kind of a plate where the
materials are swapped one material that
is here uh has completed it operation
another material has completed own
operation these are then turned so this
material goes to the this process and it
is this material goes to the process on
the right hand this is spping so turn
plate so then it could be maybe the if
lot of uh number of products are there
lot of number of maybe so if the number
of uh units that you have developed are
high maybe that could be put in Trolley
it could be trolley even it could be a
crane crane could be an overhead crane
as well so any way we can use any mode
we can use to transport the material
from one production line to the another
so what is happening here so within
organization this is my production
line or production system I would say
but other than the production system the
facility also
have the other areas such as it has an
office or I would call it as
administrative
area why I have put in the overall red
envelop and created two sets here
administrative area in blue and
production system in green because the
heating ventilating system that you're
using would be used by both so here I
have my HVAC system or you call it
overall lighting design overall other
General facilities would be given to the
whole
facility I have my HVAC I have
my
lighting then I have my
amenities amenities mean like uh you
need to provide washrooms and anything
so do would be here for the overall
facility this is
my facility or
my
organization now what are the inflows
here and what are the outflows here and
how is the interaction between the
orders that we are trying to place here
going to happen here
this is
my orders the system where I need to
decompose my
orders these are orders I need to
decompose I will try put here as
order
decomposition in
which I put all the
sets of the information I
have gathered
here like I put my product
information I put my equipment
information then I also have information
from the
process then I have information from
inventory and the information is also
taken from the procurement cell
and many other sets of information would
be taken not only these they could be I
would put uh dot dot dot because we are
trying to decompose the orders and we
need to have an information flow from my
organization so let me put
my system of orders into a cell so here
the flow of information between two big
envelops would be there so facility
would communicate with my order
cell and I have
my production task information
flow this is a two wave
flow please watch the direction of the
arrows also I have production equipment
information
flow right this is again
a two-way information
flow it is the process of product
creation involves utilization of energy
materials which in turn leads to waste
and carbon emissions I would like to put
that here as well a strong correlation
between the organization business
operations and Order information is
there the orders or order induced
modification in or business operations
can have a dynamic influence on the
carbon emissions of organization that is
why I'm trying to focus it more here
whenever we order something the reversal
of order in itself is a task that
includes a lot of carbon footprint so
the production task information flow
production equipment information flow
and just ordering right thing at right
time so that it reaches and inventory
costs are not very high this is very
important so another flow inflows that
goes into this organization
are
electricity natural
gas or CNG whatever you call then any
fuel
gasoline and that means all the energy
sources
so this is
my flow of energy I will call it
as
energy flow similarly we have material
flow that is it could be depending upon
the organization that is there it could
be
iron aluminum
or any metals that you call anything
copper or we can call any polymer
materials or maybe for a leather
intensity leather industry in khur is
very famous kpur is also known as uh
leather city of the world where the
inflow is not the metals it is the raw
Heights or we call it leather blue blue
Heights so which also goes as material
for example it could be anything it
depends upon what kind of industry that
is there so in lead industry it is known
as the material intensive industry it is
though energy is there but it is more
water intensive industry water that is
consumed in cleaning the raw height then
the water pollution that is generated or
created through the processing of the
raw leather here that is chromium six
get mixed into the river Ganges those
all points are there so depending upon
what material is there definitely I will
put here other materials
so this is
my material
flow right so what is the output here
output is
we get
products product
one product two so on
this is what we get so up to product n
though this was discussed I'm still
putting here I wanted to talk about more
about the orders here the
waste and
carbon are also
output so this comes out of the
system so this is a product structure t
i develop the structure T and I would
like to Now map this with my activities
of of the PLM so let me try to reproduce
this uh picture in the next slide and
try to see when we try to map with with
the PLM product life cycle management
what are the activities in the product
life cycle management and what are the
carbon emission uh that we need to
capture when we try to talk about the
carbon accounting so here I have
reproduced my facility in organization
with all of its components with
administrative area with production
system and uh this facility organization
also having input as energy flow
material flow so there was also the
exchange of information between orders
uh that is the production task
information the production equipment
information which was there here I have
tried to create some space so that I try
to put the activities of life cycle I
would like to say product life cycle or
PLM activities
here or whatever you call activities or
levels
which try
to communicate with
my facility that means I
have
design
then raw
material
acquisition man
facturing right put circles
here design that communicates with my
raw material acquisition then we have
manufacturing then comes transportation
and then
comes
use is the same which I tried to talk
about in the previous lectures where I
tried to add the connection between the
facility and the consumer so now we have
reached the user after user you could
definitely recall we had the Recycling
and Disposal I just put it in one
step so this PLM activities and levels
take
input from my manufacturing
concern that means this manufacturing
system here is
it is a a is here A A now I would like
to know draw down the product carbon
emissions so what are the carbon
emissions we get the carbons in
the design itself I would say
design
carbon
emissions design carbon emissions means
when we try to design and read design
and we try to run a facility and systems
of simulation where we're trying to
design the carbon definitely is also
used there and consumption is also
happening there then we have raw
materials acquisition carbon emission
raw material acquisition all right then
we
have
transportation carbon
emissions
then manufacturing carbon emissions
itself of manufacturing
corresponding to the activities in the
PLM we have used carbon
emissions and carbon is
also generated when we try to
recycle
recycling
or
disposal carbon emissions
right so these are
my product carbon
emissions so these come from my
PLM activities we
find so each organization is involved
with production of products functional
modules and parts uh contributing to
carbon emissions during the life cycle
activities so here life cycle activities
of a product that is functional modules
and parts in each organization
influenced by energy flow material flow
also we should not miss here the
information flow that was here
so that means I have three flows here I
will like to just put it here once again
it is energy
flow material
flow and here we have production task
information and production equipment
information that is information
flow right
so what we have discussed is the
facility organization has certain
inflows energy material information and
it interacts with the order
decomposition system in the order
decomposition system also we have
certain tasks which are there may we try
to
really
uh generate a purchase order there are
certain tasks here I would say tasks are
there this could be task
one task two and so on so these are
here taking
information from product equipment
process inventory procurement or
anything that is required to place the
final order so I would like to now take
a break here and we'll try to talk about
the activities within the organization
and try to see and understand the
activities at the unit level and then in
the forthcoming weeks we'll try to see
the carbon accounting models for them
thank you