It's time to get out the old carpentry tools and build some benchwork! Join me as I build a new stand and some bi-level box frame benchwork for the next section of Thunder Mesa Reimagined - the redesign and rebuild of my On30 Thunder Mesa Mining Company layout. I use tried and true methods for creating a sturdy but relatively lightweight box frame to support all of the track and scenery to come.
Thanks for watching, amigos! Dave
Become a Thunder Mesa Member on Patreon for early access, exclusive content, and members only parts and details from the builds! https://patreon.com/thundermesa/
Music courtesy YouTube Audio Library, attribution given where available. "Country Cue 1" courtesy of Audionautix, licensed under a Creative Commons Attribution 4.0 license. https://creativecommons.org/licenses/... Artist: http://audionautix.com/ "Leaning on the Everlasting Arms" by Zachariah Hickman - YouTube Audio Library "Come With Us" by Nat Keefe & Hot Buttered Rum - YouTube Audio Library
[Music]
Howdy Folks Dave here at Thunder Mesa
Studio where it's time to get started on
the next phase of Thunder Mesa
reimagined and to that end I'm going to
be building some box girder bench work
for a whole new large section of layout
that's going to be back here in the
corner this is the area I'm talking
about I need to fill this with about a
4x7 foot section of benchwork because
that's where the second half of the main
Loop of the Thunder Mesa Mainline is
going to be located looking at the
layout plan this is the section I'm
talking about I call it the canyon
section because it houses the second and
larger half of Coyote Canyon eventually
it'll also be home to the Mexican
Village of zoka Plaza and spooky
Ravenswood Manor up on the hilltop so at
this point the disassembly the demo of
the original Thunder Mesa layout is
completely finished and I'm happy to
have all that behind me and I've already
started in building some new sections of
benchwork and some new scenery for the
layout this is all on the end of the Big
Thunder section here this is part of
Coyote Canyon and the rest of it as I
mentioned is going to be in the new
section really uh excited to get started
on this new section of layout it's like
a completely blank canvas starting from
scratch and I get to see if I can make
it you know turn out and look the way I
imagin it to look unfortunately I have a
little bit of a head start because I
already have this section of stand here
this is the stand that was under this
section of the layout before so I
thought it'd be a good idea to reuse it
over here again unfortunately it's not
quite big enough for the entire new
Canyon section that's going to be over
here so I need to build a secondary
stand to go right about here now this
existing stand is about 44 in tall which
is the same height as the stand
underneath the Big Thunder section the
new stand I want to build over here is
going to be about oh 30 Ines tall and
that's to allow for the depth of the
canyon over on this side which I want to
have aligned visually with what I've
already established right here so that
means my box girder frame is going to
have to be sort of a split level deal
higher on one side and lower on the
other that's a little bit more
complicated at than just a basic you
know tabletop so before I start cutting
up Lumber I should probably draw a plan
I've got some blue line grid paper here
with the 1/8 inch square so I'm going to
draw my plan at uh 1/8 of an inch equals
1 in and to further complicate things
here this box gter frame is 3 feet wide
on one side and 4 feet wide on the the
other side and 7t long overall with a
little indent here in the
middle um where the aisle comes in
so here's what I came up with got a box
girder frame it's made uh from
1x4s and the Shaded pieces represent the
lower level so that's going to be all of
this will be about 13 inches lower than
this and that way once the risers are in
and the plywood subro bed everything
should match up
perfectly with the existing L out as
long as my math is correct this also
gives me a good approximate idea of how
much 1x4 Lumber I'm going to need to buy
and that's probably one two
three four
five six 8ot lengths just to be on the
safe side I decided to build the stand
first cutting the 2 by two legs to the
proper length so that the entire thing
would stand 31 in in tall when fully
assembled with casters on the bottom
then I cut the four 1X two cross pieces
that would tie the legs together again
taking careful measurements so that the
stand would be the required 24 in wide
when fully
assembled to assemble the stand I used 1
and a/4 in interior wood screws and
yellow Carpenters glue at the
joints making sure that everything was
Square I began by attaching the 1X two
cross pieces to the 2x two legs to
prevent splitting all the holes were
pre-drilled before driving in the wood
screws then I added some 1 by two sway
braces on each side of the leg assembly
to keep everything strong and square
a 1x3 foot piece was added to the bottom
of each leg assembly to have a place for
the swiveling casters to be
mounted I built two identical leg
assemblies this way but I'm only showing
one here for clarity
then it was time to build the 36in long
lters I made two of these and they will
form the shelf that the layout box frame
rests on I used 1x3s securely gluing and
screwing one on top of the other I also
counter sunk the screws so the box frame
won't get hung up on
them working on one side at a time I
assembled the stand first attaching an
El to the top
and then a 1x3 brace to the
[Music]
bottom a 1x two diagonal sway brace was
also
added turning the whole thing over the
entire process was repeated on the other
side then it was time to add the 2-in
swiveling casters note that 2-in casters
actually measure 2 and 1/2 in tall the
stand was turned upside down and one set
was securely screwed at each of the four
[Music]
corners success now we have a stand for
the canyon section that measures 36 in
Long 24 in wide and 31 in tall I took a
good look at my drawing again again to
see if there were any changes I wanted
to make there weren't many then I began
cutting the 1x4 framing to length in my
experience a lot of model railroad bench
work is a little overbuilt and I know
that an open box grid made from 1x4s
will be plenty strong enough to hold the
road bed track scenery and everything
else that will come after so long as
that framing is as straight and square
as I can make it once again I use wood
glue and screws to secure all of the
joints laying everything out on a level
surface and using a framing square to
line up the
corners since this box frame is really
in two parts an upper and a lower deck I
started with the upper assembly
first I pre-drilled pilot holes and
secured each joint with two wood
[Music]
screws lumber for the lower frame deck
was placed into position with the
completed upper frame but not attached
this made it easier to line both frames
properly during
[Music]
construction following my drawing a
notch was cut into the front brace of
the lower section to match up with the
river level from the previously built
Coyote Canyon
section interior cross braces were added
to the box frame as needed to improve
strength and stability
finally some 16 and 1/2 in Long 2x two
risers were added at important joints to
join the lower and upper deck together
when they're installed at the studio I
used a square to make sure the risers
were attached at a 90°
[Music]
angle then it was time to load all the
pieces into the van and drive them up
the hill to
Jerome well I got everything up here
safe and sound and the first thing I
need to do to get it installed is going
to be to move the Big Thunder section
out a little bit to give myself a little
bit of room to maneuver back
here that's probably good enough and
that my friends is why everything in
here is on
Wheels now the new
stand needs to go right about
here and then I can set the lower deck
of the canyon section on top of
that then the upper deck
section should fit right
here awesome that's about
perfect now I'll attach the upper deck
to the tall frame with a couple of wood
screws
now I just need to get these uprights
clamped in the proper position and we
can get everything put together I've
given myself some little pencil marks up
here on top of the uh box frame to help
me out
I've rolled the Big Thunder section back
over here and I'm uh clamping these two
together temporarily because these need
to line up right
here and I want to do this before I
attach the
stand and this is all for the same
reason that I
uh I didn't put the whole thing together
back in my garage I waited till I got up
here and the reason
is this is a 100y old building and uh
the floor is not level in fact nothing
in this building is is plum or level
so you always have to deal with that um
you always have to make adjustments lots
of shimming and things like that to get
things to sit you know properly no
matter how carefully you measure I'll
show you what I'm talking about here um
you can see this Gap back here between
the stand and the box frame and it gets
larger towards the
back um the thing is the box frame is
actually sitting fairly level so what
that tells me is there's a dip in the
floor back there so I'm going to need to
sh put some sort of sham or something
underneath those rear wheels for this to
sit
properly just part of the fun of being
in Jerome in a 100y old building
well I had to use some pretty good size
shims down there to compensate for the
floor but we got it
done let me show you something else
that's weird you can see this little Gap
right here and I'd forgotten about this
I I discovered this when I first
installed the layout here at the studio
this back wall doesn't come out from at
a 90 Dee angle from the sidewall it
actually kind of slowly creeps to the
north
so I have to compensate for that as well
well it's great to see things starting
to take shape so this will be the larger
part of Coyote Canyon and if you look at
the plan it actually goes straight back
into the backdrop here but I changed my
mind about that I'm going to have it
come and kind of circle around and make
a left turn into the next section of
layout down that way so we'll get a
longer more dramatic Canyon than if it
just kind of went back and disappeared
into the backdrop then up here this is
where zoka La Plaza will be located and
there'll be a hill right up here where
Ravenswood Manor is going to be
installed can't wait to get to that
build now coming off right here I'm
going to have a two foot by 5 foot
section of layout and this is where the
town of Thunder Mesa is going to be
located now across the aisle from the
Big Thunder section I think it's going
to look great over here uh it's going to
be much better access for me and uh much
better visibility for people who come to
visit the studio I think I might do some
changes to the backdrop back here though
before I start building the
[Music]
town and just like that things are
really starting to take shape here on
Thunder Mesa reimagine in fact I would
love to be able to keep going but
unfortunately I am out of time for this
week so I hope you will tune in to the
next episode when I'll be adding some
plywood subro bed some cork Road bed and
maybe even laying some track over here
on the news section you know if it's
your first time here I hope you will
subscribe and hit that notification Bell
so YouTube will let you know when new
videos are coming from Thunder Mesa
Studio you can also follow us over on
Instagram at thunder. Mesa and see
what's happening on the Thunder Mesa
Studio website at Thunder mesa. Studio
as always a huge shout out and thank you
to our patrion on members who helped to
make these videos possible until next
time keep moving forward my friends
adios for now
[Music]