I've been back to work on the good old Thunder Mesa Mining Company layout and thought it high time to share the most recent plan and show how everything fits together in the studio. It has been something of a difficult puzzle to solve and the plans have gone through several changes over time. This latest plan shows the new wye section connecting the layout to the On30 Goldfield & Calico, and gives a preview of what's just around the bend in the deep and dramatic Canyon Section with its tall bridges and towering rock formations. I've packed as many of the old favorite scenes and features as possible into the new plan while still allowing plenty of room for us 1:1 scale humans!
Become a Thunder Mesa Member on Patreon for early access, exclusive content, and members only parts and details from the builds! https://patreon.com/thundermesa/
All music courtesy YouTube Audio Library, Creative Commons License.
[music]
Howdy folks. Dave here at Thunder Mesa
Studio with an update on the 30 Thunder
Mesa Mining Company layout. If you've
been following along, you know that I've
been getting back to work on the layout
in recent months. And I've just added
this new section which reconnects the
old layout to the Goldfield in Calico
and adds a Y for turning trains and
[music] improved operations.
So this week I want to let you in on
some future plans for the railroad and
give an overall view of how everything
fits in [music] here in the studio. And
as far as the Thunder Mesa layout goes,
this is the area of expansion I'm
talking about. this [music] roughly 4x6
ft space where I'm going to need to
build some new bench work and figure out
a way to connect this track coming out
of Rainbow Caverns with this [music] one
back here coming from Thunder Mesa in
order to complete the main loop. And
that's basically the puzzle I've been
trying to solve since first moving the
layout here to the new studio. [music]
And I've gone through a lot of
iterations, but who's counting?
Fortunately, I really enjoy drawing
these track plans and layout maps, and
each one builds on what was learned from
the last one. So, even if they don't
actually get built, I always feel like
it's time well spent. And by the way, if
you want to see all of the past and
current track plans for the Thunder Mesa
layout, you can find them on my website
in reverse chronological order. Just go
to thunder mesa.studio studio and click
on the model railroads tab and scroll
down to the track plans which brings us
to the latest plan and the one that's
actually being built. I am often asked
what software I use to draw my track
plans with and the truth is it's mostly
about the hardware. I still prefer to
handdraw my track plans on blue line
grid paper at a scale of 1/8 of an inch
equals 1 inch. If you can find some uh 8
by8 grid paper like this with uh 1/8 of
an inch squares within a 1 inch grid, it
makes things much much easier. Rulers
and French curves and compasses are used
to draw in the track center lines and I
take very careful measurements of
turnouts and other components to make
sure that everything will fit the way I
want it to. Of course, there is some
great model railroad track planning
software out there that you can use,
like the stuff from Third Planet, but
for me, coming from a background in
illustration and graphic design, I still
prefer the warmth and the individuality
that you get from the handdrawn line.
Once the drawing is finished, I'll scan
it in at scale at 300 dpi. It's
important to scan it at scale and like a
flatbed scanner rather than, you know,
just taking a digital photo of it from
above. A photo can distort the image and
you want it to be, you know, at scale
and undistorted. So, you know, if you're
going to do this and you don't have a
flatbed scanner, just take it to Kinko's
or Staples or someplace like that and
have them scan it for you at scale at
300 dpi. And then once I have a digital
version of the drawing, I'll open it up
in a graphic arts program like Adobe
Photoshop or Affinity Photo 2. And
that's where the colors and the shading
and the text and all the graphics get
added. It's kind of beyond the scope of
this channel to do an exhaustive
tutorial on Adobe Photoshop, but you
know, there are a lot of good ones out
there on YouTube. And I did cover a lot
of the design process in a previous
video. And even though the plan has
changed yet again, the design process
has not. And with all of that in mind,
let's take a look at the plan I've come
up with as it stands today.
[music]
As you can see, the layout has evolved
into something of a T-shape with an
overall footprint of about 8 by 14 ft.
One of the main changes I wanted to make
from the old layout was wider aisles
with more room for full-size humans. So,
I've traded a little bit of model
railroad real estate for improved access
and operator comfort. The original 3x6
Thunder Mesa layout still makes up the
core of the railroad and sets the
standards for all of the rest. This is a
modest layout that's designed to look
bigger than it really is, with the main
focus being on [music] scenery and
structures.
Small locomotives and short trains have
always been the rule on Thunder Mesa,
and that allows me to get away with a
tight minimum radius of just 15 in. That
tight minimum allows for more room for
scenery and people in a relatively small
space. And though it prevents me from
running anything bigger than a 440, it's
still a choice I'm happy with. I use
Pico30 Flex Track and turnouts
throughout the Thunder Mesa and the
Goldfield and Calico layouts. And those
turnouts only come in one size. They're
roughly number fives. So that keeps
things pretty simple. And speaking of
simple, once again, there are no grades
[music] to speak of on the layout. And
gone are the switchbacks from earlier
versions of the plan. Those take up a
lot of space. And while they might be
fun to operate for a while, I decided I
didn't want the headaches that grades
can cause. I might do something with
switchbacks on a future layout, but
again, the main focus on Thunder [music]
Mesa is scenery and structures with
small trains running through it all. The
plan is essentially a lazy L-shaped loop
with the new Y at Thunder Mesa adding a
ton of new operational possibilities.
I've always wanted a Y on the layout and
finally figured out a way to make it
work. It allows for turning locomotives
or entire trains and creates a natural
connection to the Goldfield and Calico
layout just across the aisle. There's
also a small engine house in this
section along with the docks and warves
of Fowlers's Landing on the Rio Frontier
where steam powered river boats like the
Canyon Queen still come to call. Scenery
wise, this section is now home to the
structures from Rainbow Ridge, which is
now an extension of Thunder Mesa Town.
And the old Atensio Crump and Gracie
Undertaker Shop has a special place in
the corner above Boot Hill, which should
make for a nice transition to Calico
Mountain just beyond.
South of the Y, we come into the heart
of Thunder Mesa with its Disneyland
[music] inspired structures huddled
close to the tracks. The original 3x6 ft
layout section has been expanded [music]
to 4x 8 ft. And in the not tooistant
future, spooky Ravenswood Manor from
Disneyland Paris will rise at top the
mesa high above town, making for a
dramatic focal point. Continuing on down
the line, not much has changed beyond
the depot. We cross Big Thunder Creek
and head into the Cactus Forest before
passing through Mckennon Arch, gateway
to Nature's Wonderland. All the while,
the red sandstone spires of Baxter's but
rise high above. Rounding the bend, we
cross Geyser Gulf's trestle, where old
unfaithful still erupts from time to
time. And then we pass below Ambush Rock
to see the bleached bones of an ancient
creature in Dinosaur Gap just off to the
right. A tunnel takes us into the
colorful depths of Rainbow Caverns.
First discovered when a shaft sunk from
Big Thunder Mine broke into the main
chamber many years ago. Waterfalls and
underground rivers flow on every side
while giant crystals reflect all the
colors of the rainbow. Exiting rainbow
caverns, we come to the next section of
the layout to be built. This will be the
canyon section, roughly 4x6 ft, but with
dramatic scenery extending down 100
scale feet below track level.
We rumble across Coyote Canyon
Highbridge, an iron trestle on Spindley
legs, built in the best narrow gauge
tradition. And a moment or two later,
we're passing through the main Thunder
Mesa ore Mill. Here, an 18-in gauge
mining tram keeps the mill well supplied
with raw ore from the rich diggings
around Big [music] Thunder Camp. The ore
is processed at the mill to be bagged
and shipped out in box cars on the
Thunder Mesa mainline. The O18 mining
tram is a very simple out and back line
which will likely be fully automated. A
single locomotive will push a string of
ore cars from Nevermind tunnel and Big
Thunder Camp across the natural arch
bridge over Coyote Canyon and onto the
or dump trestle at the mill. There it
will pause for a few minutes before
reversing and doing it all again.
Hopefully this will add a lot of kinetic
energy to the scene without over
complicating things. O18 is a fun scale
gauge combination to model in, but here
it exists simply to support and
embellish the story of Thunder Mesa.
Just past the mill is the flag stop of
Bullwhip Junction. This is a new
addition to the layout and the track
going off at lower left allows for the
possibility of future expansion.
Stay tuned for that.
Keeping to the main line, we [music]
cross a wooden trestle over narrow horse
Thief Canyon and enter the Devil's
Garden with its many hoodos, arches, and
balancing rocks. And yes, those rocks
will be animated. Down in the canyon are
some ancient Anastasia cliff dwellings
now abandoned. While on the mesa high
above, modern-day PBLO peoples are
holding a rain ceremony, maybe leading
to that thunderstorm rumbling in the
clouds nearby. Better keep a lookout for
flash floods. Our train then crosses a
wooden deck bridge over the narrow end
of Coyote Canyon before plunging into
the tunnel below Thunderbird. But
emerging from the darkness, we pass
through a peak tunnel portal before
arriving right back where we started at
the Thunder Mesa Y.
Here we can turn the train and go back
the way we came or even continue on to
Calico from the new connection at Calico
Junction. Most likely though, our train
will just continue on to Thunder Mesa
Depot and make the whole Grand Circle
tour again.
So, that's the plan for the Thunder Mesa
Mining Company layout. The next steps
will be to complete the backdrop on this
wall behind me and then build the
benchwork for the new canyon section.
And for that backdrop, I have something
special planned. This time the distant
butes and maces and mountains will be
painted onto 1/8 inch Masonite panels
and then cut out. And then I want to
install those panels leaving about 3/4
of an inch between them and the painted
blue sky backdrop on the wall. And that
should allow just enough room for some
RGB LED strip lighting to give different
lighting effects depending on the time
of day. And I think the sunset effect
will be especially spectacular.
The old thunderstorm effect will also be
returning along with the digital
projectors for the full moon and the
fireworks that were so popular on the
old layout. Those will likely be part of
the lighting rig which will be suspended
from the ceiling. So, there's a lot to
do, plenty of projects to keep me busy
for a long time to come. But that's just
the Thunder Mesa layout. Now, let's take
a look at how this fits in with
everything else here in the studio.
The studio train room is approximately
300 square ft, about 15x 20. And then
the front model shop/off adds another
150 square ft. And that's where the 2x4
ft San Lorenzo mini layout is located.
Here along the west wall of the train
room, you can see how the Thunder Mesa
layout and the Goldfield in Calico fit
together. They can operate [music] as
two independent loops for display or as
one railroad system if more operations
are desired. The aisles here are a comfy
4 ft wide allowing plenty of room for 1
one scale humans and that's a welcome
change from the old studio where things
can get a little cramped on open studio
days. Back behind the gold field in
Calico along the north wall is an access
and storage area backstage if you will.
And this area can act as staging for
both the Goldfield and Calico and the
Thunder Mesa line. And over on the east
wall is the Tiki Bar. Hey, you know,
every train room needs a tiki bar,
right? In reality, it's not much of a
functioning bar, but there is a mini
fridge with cold beverages. This area is
still under development, and in the end,
the bar might just make an awesome base
for a tropical themed mini layout.
There's nothing concrete in the plans
yet, but you know, it could happen. Just
to the right, we enter Little Colorado
and the 4x8 foot H3 Barlo pass layout.
This layout is still in the plywood
stage and track laying has just begun.
I'd like to get the backdrops painted
and installed sooner rather than later
cuz I've been yearning for those
dramatic Rocky Mountain vistas. Of
course, you can see all the progress on
the Barlo Pass by subscribing and
checking out the playlist.
The south wall of the train room is
dominated by a rollup shop door. Now,
this is great when you want to move big
stuff in or out, but can be problematic
for trains and models the rest of the
time. I'm making the best of things with
a couple of backdrop panels that cover
much of the door when in place, but can
be moved when I need to use it.
And that brings us to the current mini
layout project, the O18 Thunderbird
trading post with its mid1950s
Route [music] 66 theme. This is in a
flexible space and the layout won't be
here forever. So, it is also a possible
area for future Thunder Mesa expansion.
But for now, I'm having a blast working
on Thunderbird with my pal Gary Batty,
and we're planning to have the whole
thing done by this coming spring. Again,
you can follow the build progress right
here on the channel, and there's another
installment coming next week. So, that
is how everything fits here in the
studio with just enough room left over
for humans. And speaking of humans, I'm
planning to host open studio days again
at some time in the future, but I want
to wait until all the track is in and
the trains are running again on the
Thunder Mesa layout. These open studio
days will probably happen quarterly, so
stay tuned for more information on all
of that. For now, that's a wrap on this
Thunder Mesa planning session. Thank you
so much for watching today and following
along with all of the projects as they
continue to evolve here [music] at the
studio. I'll be back next week with
another video. And until then, you can
also follow for free over on Patreon.
That's patreon.com/thunder.
If you'd like to support the content on
this channel, you can become a paid
member there. You can also follow on
Instagram [music] at thunder.na Mesa and
check out the resources available on the
Thunder Mesa Studio website at thunder
meesa.studio.
As always, a big big thank you to our
Patreon members who help to [music] make
these projects and these videos
possible. Until next time, keep moving
forward everybody. Adios for now.
>> [music]