How To Prepare Bar Bending Schedule Of Staircase I BBS Of Staircase I Bar Bending Schedule I BBS

Knowledge Hub
101 followers
74 Video Views·May 30, 2024
Hello friends, welcome all of you to Knowledge Au Channel.
Let's Learn Together.
In today's video we are going to see
and prepare how to prepare the bar bending schedule for a
stair case. We will talk about the bar bending schedule for a
stair case. How to calculate the bending schedule,
then first of all you will have to get
some information about the stair case. First of all, what are the
components of the stair case?
They are slab, flight, landing, step,
tread and riser. They are slub, meaning the
slub which remains in the stair is mainly inline. Potion
remains, which means from landing to
mid-landing, it is visible either in floor to
floor loop.
After this, flight flight means series of
steps between floor and landing, it has become flight
or it has become flight, we
call it flight. After that landing
landing means level of floor between two
flights means landing on one side is visible
and here and there landing is also visible. This is
called landing. After this there is step step meaning
riser and step of tread.
Trade trade means flat part step. This
means where we place our feet and riser
means vertical up and down means this side or
this side we call it riser,
look here now this is one hand two or landing is this side of the ter,
you can see this in the section also. While
removing this, first of all you have to find out the
slit height for the waist slap.
So how to remove that slim, so
we remove it from Pythagoras Pythagoras Therm.
Now hot floor is 3 meter height of mid
landing 1.5 meter width of landing 2.5
meter width. Off West Lab 1.2 meter Length of
West Lab is 3 meter in straight then the
length of inclined is calculated from Pythagoras
so how does it calculate this
length of staircase case 3 meter hot off slab
1.5 meter then
how is the hypotenuse given or the length is 3.35 This is 1.15,
this is 9d pv hook length plus concrete cover
length,
y is landing, y is overlap
d and this is d, so now first of all
do the steps, length of
x bar and va bar is given here Then we have to find out the
Pw 8 A diameter and cutting length
how has it come Y 3.35 P 1.15 Look here 3.35
P 1.15
P P 9
008 According to that this cutting length has come Let's
see below 3.35 -5
D P E 34 It has come and its cutting length has
come 1.2 P D
508 P
508 E 2 meters have arrived, according to this the
Bars 12 cm Here also the number of Y
bars will be 34 cm 8 AA 8 AM There will be cutting le
difference in this How will it come 3.35 P
1.15 P 1.15 And see here the sketch is
our
3.3.1
1.1 So it will
come according to this and it will be of the length below.
Same will come 1.2 P 50 08 P 50 08 So
according to this, this is the total, this is the cutting length,
number 12 is this is the cutting length, this is the total
cutting length, how is it in one and two landings? If it has been
done then there is
no need to take out the second one for landing two
and landing one of The
diameter of the dip is 8 am and
how much will be the cutting length 2.5 -05
-05 y 2.4 y Total cutting taken accordingly
Total waste slub in front of the staircase One
waste slub two landings According to this the
complete reinforcement was taken out and this is according to his
formula If you calculate the total
length will come here, then total will come here, then after
multiplying according to the weight, then the total weight
came to be 114.3 kg. See this step by step.
First of all, the waist slab of the stair case is
one wrap two and then its slit height is
calculated. If we calculate its distribution bar
step by step, it will be
easy to understand. So friends, here is our
today's video. How did you like today's video? Do
comment. If you like it, please like it
and if you are watching my channel for the first time, then
definitely subscribe to my channel. Subscribe and
press the bell icon on the side to get
notification of all my upcoming videos.
Thank you.