The goal today is to get Adali’s milk room operational so she can actually use it. This means we have to build the power closet, set the fridge in place, finish installing our Pioneer Mini Split AC, and get some temporary solar panels up to keep the Legend Dairy Goat Barn Container running. Then maybe we can focus on some other projects around here!
SECTIONS // 00:00 - Intro + Project Recap 0:25 - Building Power Cabinet 1:33 - Next Steps 2:35 - Reversing Fridge Door Swing 7:08 - Starting Power Cabinet Door 7:45 - Mounting Mini Split Outside Unit 8:30 - Power Cabinet Door 9:43 - Mini Split Electric & Gas Lines 10:58 - Introducing YT Memberships! 12:19 - Gas Leak Tests 14:30 - Testing Mini Split! 16:25 - Protecting Outside Unit 18:55 - Temporary Solar Panels? 21:50 - Final Touches on the Milk Room 22:36 - Wrapping Up 23:10 - What's Next...
the legendary goat Barn container is our
daughter adeli's dream of rehabbing a
shipping container into kiding stalls
feed storage and a milking room we've
had the container delivered refenced our
property around it cut out and installed
multiple windows and doors framed the
inside ran electrical added spray foam
insulation designed the kiding Stalls
built the metal field fencing welcomed
seven baby goats into the world and now
we're trying to put the finishing
touches on the milking room back in the
goat Barn Johnson and our friends are
outside and they're going to make a
cabinet to cover up all the batteries in
the milk room let's go check out what
they're
[Music]
making in order to use as little space
as possible building this cabinet our
friend Cullen is using pocket screws to
attach the sides directly to the back
wall this will allow us to enclose the
power center and still have room for the
refrigerator
[Music]
we're making sure to allow space in the
top preventing the solar gear and we
need to build a shelf for the fridge but
we'll explain that in a
minute
all right so yesterday our friends Colin
and Britney were here and they helped us
build this cabinet area we were joking
that this whole wall was measured within
an inch of its life um we were like
measuring how big the door would be and
then like the actual size of all these
components and how we would enclose them
and then the fridge which has to also
fit over here and then when we got it in
here we realized that with the milking
stand we would have to raise it up so
that when the door swings out it doesn't
hit the milking
stand anyway they helped us and we got
almost all this done yesterday um so the
first thing we need to do this morning
is we need to switch the hinges on the
refrigerator uh because we want the door
to open towards the wall and not the
opposite way then we'll get it up in
here and then we got to build the door
for this and put the hinges on so that
we can close all this up and we got to
put in the touch display so that that's
on the outside so we can monitor the
system without having to actually open
the power closet so in order to switch
the hinges on the fridge we just need a
few simple Tools socket set and a couple
screwdrivers and we should be able to do
this really fast right
babe step one remove the hinge cover
with a screwdriver check step two loosen
the top hinge screw using a hex head
screwdriver what the heck is a hex head
socket oh well it says hex head
screwdriver it doesn't say
socket wait what's a hex head
screwdriver it's it's listen you know
what it is what it's a screwdriver with
a socket attached 10 mm right it says
you're going to be using a 10 and an
eight everything's fine babe we don't
have to tape it it says after you do
that adjust the door or put a spacer in
between and then tighten the screws
affix the
refrigerator why don't nobody says a
fix and then then you take off the
middle hinge which is right above the
fridge
[Music]
door we
45° your golden Gs are on the floor one
one golden G white
[Music]
to
why can't we just put in the fridge like
it came cuz it can't have the
door you'll think me
[Music]
later I was thinking maybe we could also
switch the swing of the the door that
the fridge that's behind the
shed never
again it wasn't that bad it was
[Music]
terrible okay C's
coming open yeah oh my gosh it's so tall
look at
it it's working yeah do you like feel it
I heard it
yeah
how much power it use uh give it a
minute it's waking
up 60 watts that's not bad that's barely
that's really not much at all good we're
close it's up it's running but it's real
close to the edge of our Shelf that was
our fault because we measured for the
feet
and didn't take into consider
consideration ventilation we should have
brought it out a little bit so it's
already we were already going to add
something else here because the foot is
real close the front foot um but this
will also allow us to slide it out and
give it a little bit of space behind so
that when the motor runs it can vent out
yeah so we're just going to add a 2x4
spacer on the front of the Shelf here
and that'll actually make it look a
little cleaner and more finished but it
will also let us slide this out and uh
not feel like it's going to fall
off that right there is close to 2 in
yep look
good yeah that's
better it works you fridge guys the
weather sucks it's like hailing it's
windy and it's almost snowing and
raining we really need to cut the
door for this and get it installed but
it's too cold and nasty so we're
thinking about going to the
cof I vote
[Music]
Yes
[Music]
okay it is time to put the finishing
touches on the milk room we've got
cabinet hardware we've got a door facing
that we need to put on that power
cabinet so that's what we working on
this morning cutting this putting the
hinges on getting that all installed
hopefully getting it painted we really
need to get all of our tools out of the
milk room so adeli can actually use it
and we just keep coming back and doing
these little projects so the goal is get
all this little stuff cleared up so that
she can officially start using it as a
mil all right so the girls had to run
into town I've got a few minutes here to
keep working on the mini split we put
the the inside unit in we pull the stuff
through the wall connected the
communication cables um so now I'm
working on uh running the power from
inside to uh the shut off breaker on the
outside here and that'll go into the
mini split also before I do any of the
gas lines or anything like that I
definitely want to mount the outside
unit down into the concrete pad to make
sure it doesn't go anywhere because
those flare fittings are pretty fragile
we don't want to be moving the unit once
we get it connected I've got it where I
want it I've marked my holes I'm going
to start drilling and get this thing
bolted
[Music]
down
[Music]
we do it you do the
display kind of like that as a
[Music]
handle
[Music]
it's been a long road we finally have
this area finished up we've got the
cabinet around the power built got the
handle we've got our touchscreen mounted
for the system and then we added a
little shelf here and so it's all ready
and we even have room for an extra
battery if we want it so we have a few
other little things to do in here but
the main thing I'm going to be working
on today is uh running the gas lines for
the mini split so we can get it on and
get it tested we still have enough power
uh in this battery and then we haven't
charged it yet to run the mini split for
a little bit so that's the goal today is
to connect the gas lines do the vacuum
pump thing uh and get it up and running
so we can see if it
works okay I was going to do the gas
lines but these other cables I don't
wanted to get in the way of while we're
doing that I don't want to knock
anything loose so we're going to tie up
all the this is the power from the main
power system and we have the
Communication cable it's coming out of
the bundle we're going to tie all these
to the wall get them safe and protected
and then we'll do the gas
lines we had all these
wrenches and not the right
[Music]
thing
[Music]
[Music]
[Applause]
so we're adding a very simple support
plan through YouTube for $4.99 a month
you'll get access to videos early via
membersonly posts special avatars that
change depending on how long you've been
a supporter and my favorite feature
custom emojis we're launching with a
dino Emoji a doodle Emoji a Pines emoji
and a goat emoji and as more people sign
up YouTube will let us add more
emojis a $5 month homies membership is
always going to get you more stuff like
what well you get a weekend update video
every weekend and access to your recipe
collection that's true but if you've
been looking for a simpler way to
support us just click the join button to
get started it's easy yeah so I'm going
to leave a comment down below with all
the emojis in it I want you to tell me
which one is your favorite okay cool
yeah all right let's get back to the
Bild all right so we have mounted the
mini split we've tied up all the
electrical lines we've connected the gas
lines and tied those up as well so they
shouldn't go anywhere so the next step
is this whole sort of dance with this uh
vacuum and pressure gauge manifold I'm
not going to walk you through the
details of this there's a great video
from a channel called underdone which
I'll link to in the description I think
I've watched this video like 50 times
during all my other mini split stalls
super entertaining super informative at
this point though what I'm doing is I'm
drawing a vacuum on these lines to make
sure that I don't have any leak so it's
step one of make sure making sure I
don't so right now on the blue one you
can see I have a negative pressure which
is what I'm looking for uh I do this for
15 minutes and then I'm going to close
that valve turn off the pump take a
picture of this okay so far so good um
our vacuum negative pressure has held so
the next step is we're going to release
just a little bit of the refrigerant
into the system and then close it it's
going to take that negative pressure
reading go positive and do the same
thing and wait for five or 10 minutes
take a picture of it make sure that it
doesn't drop back down over time so that
we know we don't have a
leak one two 3 four
five all right that's our reading we're
going to give it 5 minutes we're going
to see if it holds our pressure has held
in the manifold gauge so we're going to
release the charge from this unit into
the inside unit and it should hold its
pressure and it should keep all the gas
there and we should be good to go so
let's do
[Music]
it thanks to Mr D I do know that you
need to wear gloves during this step or
else you might get some refrigerant on
your hand so thank you
sir all right um we're going to put the
disconnect back in go inside turn it on
see if it
[Music]
works
ready all right that's a good sign o
it's a fancy new remote hold on let's
[Music]
see it's ramping up I'm watching the AC
loads on the system
too like nothing right now it's just the
fan so the compressor hasn't kicked on
yet I don't know hopefully it's it might
be too cold in here honestly wonder if I
can get cuz it only goes down to
61 oh there it is there it
is that's why Min splits are so
efficient is they don't just like
immediately kick it on it's like they
got ramp up a little bit and they're
very like cautious about how much power
they use oh that's really cold
woo wow nice
nice that's not bad 400 watts I thought
it would use more than that we need to
get those solar panels up so we can
actually use this thing on a regular
basis oh my gosh that's amazing all
right so what we also want to do is we
want to try the heating too I don't
understand the icons they changed them
all
[Music]
let's try
this all right heat mode is working too
Heat's a really good test because it
actually puts more pressure on those gas
lines and it uses a little more power so
we're using 700
Watts so yeah I think we've had a
successful mini split
install good
us yay all right I think we're good I'm
going to add a few more Clips to the
side of the building to just kind of tie
up a few of these cables and wires and
hoses and everything and then we're
going to get all this mess cleaned up
cuz I have about 4 million tools out
here let's get that cleaned up and move
to the next
[Music]
[Applause]
[Music]
step the last thing we're doing over
here is there's space on either side of
the min that we want to protect so we've
got a couple of stock tanks um up by the
chicken Garden so we're going to bring
in some dirt level that area put them
basically on each side so that the dogs
can't run behind catch their foot on a
on a hose or a cable or something and
break it which I can totally see
happening when they get plain they're
[Music]
crazy
[Music]
[Music]
[Music]
so here's our problem we really need
this to slide all the way up again
against that which means we don't have
quite enough dirt so we're going to
level this out with the pad right here
hopefully that'll
work got to anticipate the dog's every
[Music]
move delicious
[Music]
hey
[Music]
now we have all the electric hooked up
I'm a little bump that we can't charge
the batteries yet because we haven't
built our awning so I had an idea
actually our friends are staying with
with us and they had an idea what if we
just threw up a couple of panels on the
top of the shipping container now we
don't want to screw down into the top of
it and create a potential leak but we
might have a way to do it the problem is
I only have enough mounts for two panels
and it's kind of right on the edge of H
of creating enough voltage for it to
actually work cuz we're going to have 12
panels up here eventually but if I only
have two I have to have a certain
voltage to get above the battery voltage
anyway we're going to take a couple of
these up there and plug them up real
quick and just see if it's going to be
enough to kick it on and if it is then
we'll mount it down and then that way we
can at least keep the batteries kind of
mostly topped off while we're running
small draw stuff like the refrigerator
and the lights and everything cuz right
now we're just having to turn it off and
on all the time which is
really
Sunrise you aoke my
hibernating
High
rubing my eyes
stbl
outside and saw you from
AAR
it's the pretty song you're
singing oh by
daring all right I'm going to turn the
power
on I see
wattage I see wattage not a lot of
wattage but it's a little bit of
wattage so now we just got to figure out
how to make sure those panels don't blow
away for the next couple of
days or the next couple of weeks I don't
know how long it's going to be before we
build the uh roof
[Music]
[Applause]
[Music]
[Applause]
[Music]
thing gather your
courage all it is
[Applause]
worth oh it's going to be all
[Music]
right don't be
ID what is life if you don't have room
to
grow each day is an Open Door are you
love
seeing where it
[Music]
goes and it's time you know my
sparrow the cage is not your
home oh the Light May BL
my
flower always remember what you're
worth and with that friends the mini
split is installed we even have some
temporary solar panels on the roof of
this container until we build the full
awning yes I know that the solar panels
are a little janky it's very temporary
don't worry we're going to do it right
very soon don't install your solar
panels This Way this is a big step
because it means the power can stay on
in here fridge can stay on no we don't
have water yet no we don't have proper
solar panels installed yet we don't have
rainwater catchment yet but we can use
90% of this building and pause a little
bit and take a breather and finally
start to work on some other projects
here speaking of here's what's coming
[Applause]
next let go of your fears cuz we're
leaving them all
[Music]
behind
[Music]