time flies by quickly with less than two
weeks until the Monumental launch of
Starship flight 3 therefore engineers at
Starbase are ramping up more than ever
they haven't stopped working even for a
minute in the last few days one of the
most noteworthy activities of spaic
during this time was the significant
changes made to the launch Tower
mechazilla so how has Starship
mechazilla been upgraded to prepare for
if3 this month let's find out in today's
episode of alphatech first we have to
mention the new SpaceX Starship live pin
setup attach to the megazilla Chopsticks
these ship lift pins are designed to
thread into holes located underneath the
Ford flaps of the ship they serve a
purpose they connect the ship with the
lower stabilization arms on the
Chopsticks ensuring precise alignment
during the stacking
process it appears that SpaceX has made
adjustments to the ship lifting pin
located on a left Chopstick shifting its
position several inches closer to the
tower this modification aligns with a
previous adjustment made to the
stabilizer arm which also moved the pin
closer to the tower these modifications
seem to address a slight angular
mismatch observed between the bottom of
the ship and the top of the booster
during the stacking process but either
way this fix is definitely some out- of
the- boox
thinking next is the ship quick
disconnect
on which is an essential component in
the preparation process for
Starship they serve as a bridge to
supply Fuel and energy to Starship from
the tanks of the tank
farm
we can still see teams are actively
engaged in modifying and reinforcing
various components of this critical
apparatus although upgrades are
currently undergoing testing and may
have some errors spacex's ultimate goal
is still to design a reusable tower that
only requires minimal refurbishment
after each launch moving down below we
can see that SpaceX has diligently and
meticulously reinforce the concrete
surface the durability of these heavy
duty panels indicate that they'll be
kept securely in place instead of of
enduring significant stress like in
previous launches the thick steel panels
around the launch Tower base have been
carefully welded by workers like Auda
armor they'll maximize their protective
capabilities in the next
launch and they'll also determine the
potential for truly rapid reuse of the
tower special mentions must be made of
the tower's endurance capability to
rotate Rockets daily even
hourly clearly this is not a joke
as you can see mechazilla lifting speed
is no longer an issue like it was two
years
ago we can recall situations back then
when lifting boosters or stacking
Starships was a slow and meticulous
process involving careful manipulation
of the tower's arms to ensure precise
and perfect alignment there were even
instances where human intervention was
necessary during stacking to achieve
higher
accuracy but now that's no longer the
case mechazilla assembly speed has truly
gotten rapid whether it's lifting
boosters to the Launchpad or stacking
two
stages the average time we've observed
from them is about an hour and a
half not including the time for testing
and repairs which naturally takes longer
than usual however this figure is likely
to decrease in the future to align with
elon's ambition of launching multiple
Starships each
day the more mechazilla is lifting times
optimized the more advantageous it
becomes for spacex's Starship launches
consider this example the upper stage of
Starship has a fuel tank large enough to
place objects in stable orbit and
return if it intends to carry its payad
to Mars the moon or another point where
we have the greatest need for a vehicle
capable of transporting loads that are
hundreds of tons it's got to consume
more fuel you'd want to complete the job
as quickly as possible if you have
anything to liveing there because the
more supplies they need to get through
the refueling process the more fuel they
have to take to know where they're going
the only current way we have to provide
it with that amount of fuel is by using
oil tank aners launched from the same
base that starship's
done in theory they could assemble all
of them at once and move them out one
pad at a
time but that means they'll need more
than a dozen stages below and upper
stages to support each upper stage of
Starship and the potential cost
advantage of the system will largely
evaporate the ideal cost configuration
would be to have one Starship one oil
Taker and one booster with a lad two
flying multiple times a day if
successful it could bring rocket launch
costs to unpress ined lows however it
won't be efficient if the overall
turnaround time for checks stacking and
fueling the oil tanker takes too
long while currently there's not much
that can be done to reduce the time
needed for checks and fueling therefore
as mechazilla lifting efficiency
continues to improve over time it'll
help SpaceX optimize part of the time to
achieve the most effective operational
efficiency for Starship returning to the
latest updates at
Starbase the launch pad's also something
that SpaceX pays particular particular
attention to is there are still
scaffolding structures surrounding the
deck looking ahead there are
considerations for additional
enhancements such as implementing a
water jacket on the mount this
Innovation circling water both below and
above the launch table aims to bolster
resilience against the intense
conditions encountered during Raptor
powered launches to be honest if
starship were to launch immediately it
would feel challenging due to the
additional preparation still
needed however you also know that this
doesn't significantly affect space exit
as their achievements in overcoming
obstacles instill confidence that the
launch site will be fully prepared for
upcoming
launches this underscores their
reputation for accomplishing seemingly
impossible
tasks booster 10 successfully returned
to the Launchpad after undergoing
repairs of the production site the road
closure schedule provided by Cameron
County indicated this important
Milestone and the smooth transportation
of booster 10 back to the Launchpad is
an encouraging sign with the assistance
of Chopstick booster 10 10 was securely
positioned and is now ready for upcoming
tests including that crucial wet dress
rehearsal however the completion of the
wet dress rehearsal test necessitates
the presence of ship 28 alongside
booster
10 while work on ship 28 is in progress
it has not yet been lifted onto the
transport stand nevertheless the
delivery of two large cryogenic methane
tanks to the launch site underscores de
ongoing preparations for the upcoming
test this proves it won't be long until
ship 28 meets booster 10
however we can still speculate about two
directions of ship 28's movement one
option is to transport it directly to
the Launchpad for stacking with booster
10 followed by that wet dress rehearsal
test on the other hand ship 28 might be
taken to the production site for
potential fixes related to previous
tests both paths hold
importance with the decision contingent
upon factors such as s28 Readiness and
any identified issues requiring
attention before advancing to sub quent
tests but no matter what it's certain
that the ship 28 will return to the test
pad before the expected launch date
preparations are expected to pick up
pace
rapidly with the FAA closing the
investigation into that flight 2 mishap
back in February 26th indicating
progress towards flight three and
environmental assessments conducted by
other groups at Star base SpaceX appears
to be in the final stages of completing
necessary
assessments according to elon's
statement the third test flight at
Starship May launch in mid-march or even
sooner with spacex's current rapid
progress technical issues and ground
support equipment at Starbase will no
longer be significant
concerns with all eyes now on obtaining
FAA launch
approval excitement is mounting the
countdown is on so be sure to prepare
yourself to secure the best viewing
spots for witnessing starship's awesome
performance that's all for today's
episode thanks for watching and see you
next
time