Adam has spent this week in Austin crushin' our van build! In the last few days he has built the bathroom/shower walls, installed some plumbing and the shower pan, and started our closet build. We are not done with the bathroom and shower install, but things are coming along really well and we will pick up where we left off next time! ____ Our Vlogging + Photography Gear: https://kit.co/AdventuresofAplusK/vlogging-photography-gear Our Van Life products: https://adventuresofaplusk.com/blog/van-conversion-cost-tour-mistakes
ABOUT US Hi y'all! We’re Adam and Kathryn, an adventurous married couple living in a Sprinter van! You can often find us scoping out the best coffee shops, eating tacos, climbing mountains, cuddling our fur child Kona, and dreaming about Hawaii.
We created Adventures of A+K to help busy, budget conscious, and adventurous travelers maximize their vacation time and money wherever they go through detailed travel guides, vlogs, and resources. Our goal: to help you spend less time (and stress!) planning your trip and more time enjoying it!
We will be sharing 1-2 travel vlogs a week, so please SUBSCRIBE to follow along on our adventures! :) ____ Note: We’ve linked a handful items so you can see exactly which products we take with us. Full disclosure--if you click on these links and make a purchase on Amazon, we get a small commission at no extra cost to you. We will only ever recommend products we truly love, actually use during our adventures, and think you can benefit from too!
We have a shower frame and some plumbing.
So it's finally my turn to be down here in Austin to work on brisket. I've missed it.
Haven't seen it since we bought it. I was really excited to get down here and start working on it
but ever since I've been here it's just been pouring down raining. It's now day two and
rained pretty much all day yesterday. It's about almost 10 o'clock now on day two and
it's still raining. So there was a little bit of a break yesterday but
it's kind of a bummer. All we've really done is gone to the store and get a few things,
a bunch of wood, and Home Depot of course can't come down without going to Home Depot.
So kind of a bummer but we'll get going here soon hopefully once the rain passes.
So the main projects that we're working on while I'm here is to start building out the
shower and some of the other cabinets. On day one yesterday, didn't get a whole lot
done because of the rain, but we went to the lumber store and bought some maple and birch
plywood. We bought this because it's nice and strong. We bought a few different thicknesses,
a three-quarter inch, half inch, and a quarter inch that we'll use for the shower and some of
the other cabinets. So we bought them because they look nice. They're very strong and they'll
be great for those applications. So the second major project we were looking to get done this
trip or get started was to install the heat so heater underneath the passenger seat. Most people
that we've noticed like to put that in that area because it's just nice and convenient to open box
and just an open space to put. But we started to take the passenger seat off and we noticed that
the 19 floor underneath the seat is completely different from previous versions. It's not as
level. It's more sloped up towards the front and also we think it has like a double wall. So
you drill down, you won't immediately see the intake and exhaust out the bottom. So
running into a bit of complication there. So we're going to have to probably hold off on that until
another trip to figure out where it's going to go and how we're going to implement that in the van.
The weather cleared and we finally have some action. Very exciting. So what we've done is we
brought in a piece of plywood and made a template for the bathroom walls is what we're working on.
So this was a little more out here like that because it was square and so we took measurements
in here all along the way at like six inch increments and then took it inside and cut a
little bit off of it at a time. Took a few back and forth tries but this template fits really nice
all along the way as you can see. So we took this template back into the garage and we had a
three quarter inch plywood which is going to be our walls. It was a big nice square rectangle. Cut
it right down the middle. Laid the template on top of here. Cut some off the top to the proper height
and then cut it along that curve we had for the curve of the wall. So very exciting that we finally
got some work done. So it's been pretty boring just waiting around waiting for the rain to pass
but we should be in the clear until Thursday when I leave. So taking a little break now and then
we'll come back out and and get going again. So poking out of our frame of our bathroom here.
This was the major dealio we got done today. So this is going to slide up against the wall
obviously and that's going to be our bathroom and shower. Super cool. Just giving it like a
little test run here. So the toilet will be right here at my feet. It's going to be pretty tight in
here. Should be able to stand. Should be able to rinse off and sing my songs in the shower and all
that. So very cool that we got that done. Another piece we got done or got started on was the wall
for the side of this closet here. So this will be right here and we'll have some little shelves here.
Laundry basket. We'll keep a suitcase here and this will be where we'll keep some of our
backpacking stuff and a couple other little things and then the plumbing will go right in here which
will start on tomorrow. So much more productive day than than the last day yesterday where we
didn't get hardly anything done. Just getting some supplies and waiting out the rain.
So pretty big day and like I said tomorrow we'll get going on some of the plumbing and keep working
on that closet on the other side and then later on in the week we will start messing with the
building the dresser out right here. So very exciting and like it's so cool to like
see stuff like taking shape. Man like you can really just you can just start visually like
seeing it come together. It just gets me gets me pumped. So it's pretty cool.
Been a long day. So at first glance it doesn't look like we've gotten a lot done but
we had this bathroom cabinet going yesterday and then today we were solely working on this
closet area going on right here. So this whole thing is one unit and it's going to slide off
into this corner more. This is some storage here. Laundry and then a suitcase will go here.
Our dog crate will go right in here and then some backpacks and some other things as much as we can
shove in there. So cut out all this wood. Put in like the supports for it. Things like that.
Got the back on it. All that jazz. So been a long day. Tomorrow we're looking to hopefully
get to the plumbing. We thought we could get to it today but it's looking like it's going to be
more tomorrow. Got to get the insulation in on the back of it and keep things rolling. So
there's just lots of moving parts all along the way on each step. So
we're keeping it going and we're calling it a day today and then we'll be back at it bright
and early tomorrow. So see you then. Another full day of the van build is in the books.
At first glance it doesn't look like a lot but it took took us all day so let me show you what we
did. Got that drain drilled in through the bottom there. We've got this white tube is the exhaust
for the composting toilet. This is the hot and cold for the shower and then they come down around
here and they go out here. Well it comes up this way and then that white one is the drain from the
sink. So it's going to go all the way down and around here to the sink. It's right here by the
door. The shower pan fits in nice and snug there and the water lines are running under that lip
there. So we're going to end this vlog right here. I've still got two more days to go, Wednesday and
Thursday, where we will continue to work on the finishing touches on this. Get everything right
and squared and get everything done and get it pushed back in its final place. So hopefully we
can get all that done before I leave. I'll also be getting a lot more of the insulation in there
down at the bottom and then Catherine will pick up where I left off when she comes in a couple
weeks. So it's been very productive. I'm proud of myself, proud of us for how much we've gotten done
and it's been a learning experience but it's been fun. So it's getting exciting. We have like an
actual structure in the van now. So pretty cool. I'm excited. I can like, I can start to
start to feel it and taste it so and see it. So very cool.
Sitting on the toilet. Sitting on the toilet. Sitting on the toilet. Sitting on the toilet.