Hungarian State Opera: Restored and Revitalized with Archicad

Opera House Stories
2 followers
71 Video Views·Oct 18, 2025
Established in 1997, Zoboki Design & Architecture (ZDA) is a leading architectural practice in Central Europe.
ZDA designs every project in Archicad, from the initial sketches to the full BIM model.
Built in 1884 based on the plans of the genius architect Miklós Ybl, the Budapest Opera House is a unique heritage-protected building bearing witness to the era.
The building was restored and re-designed by Zoboki Design & Architecture using Archicad.
The Hungarian State Opera here in Budapest was first opened in 1884 and at the time it was at
the very heart of culture and society. Fast forward 140 years and it was time to renovate.
Now Gabor, you won this tender and I have to say you'd be one of only 20 people, if that,
in Europe that can do a project like this. Yes, there are not so many architects who
are professionally work in the heritage side. It's one of my best work of my career.
I can't wait to go inside. Great, let's go.
So they are getting ready for the performance. Yes, tonight it's AIDA.
We better talk quick. What kind of work did you do in here in this all-important space?
If you see the original pictures of the building and drawings, it was a totally different space.
When Miklós Ebel started the design, it was a social meeting point for the people who are
interested in the art and also they wanted to meet here. How can we put back the original sound
which was 140 years ago was here. The room itself is another instrument which tunes the orchestra
and the singer's sound. So that's why I say always for everybody, go to the last row, always the last
level where the sound is so warm and so big because the ceiling reflects a lot of energy,
sound energy from the pit and from the stage. Okay, well that's a tip.
The audience is coming in. Maybe we've outstayed our welcome here.
The Royal Box? Yes, this is the Royal Box, the most sophisticated interior design.
This box was built only for one evening, the opening night of the house, 1884, when Franz
Josef, the Habsburg Kaiser, was here. This sophisticated interior shocked everybody at
that time. Yes. See the details. In this type of building, you don't know what is behind the walls
and you have to solve not only the surfaces but also the technical elements, structure,
mechanical equipment, all the electricity. The building worked with candles for 11 years at
that time. So six years, six years of work. Okay, look, I think the performance is about to begin.
Let's go. Let's go. Let's go.
Gabor, this room was in a particularly bad state, wasn't it, the cafe?
Yes, because it's flooded in 1910. So you have black and white pictures.
To go by, yeah. So this is your best guess at this point.
We found this solution because we didn't know what was the original color. Never forget,
the original architect had more than 100 people who painted his house. He came in day by day and
told, hey, I would like to see some Pompeii here, okay? And he came the following day and checked it.
So the methodology of the work was totally different, not comparable now with the computer
world because 90% of the work happened on the site, not in the office. Okay.
What a beautiful ceiling. This is the only original paint which we found in the house.
Really? This is back from the 1880s? Yes, because nobody dared to touch it.
Because this is the royal staircase. Incredible, bombastic, no? And as the king reached the first
floor, the main floor, you find incredible nice stoneworks. This is not minimalism.
No, my friend, this is the maximalism because they wanted to show the richness of that era
in 1880s in Hungary. Gabor, you're a passionate fellow, you'd have to say, but I think you're
the most passionate so far about this space. And you did the least here. This passion is
very dangerous for an architect. Why? To decide not to touch this space is also a very strong
decision. You would like to renew always the chandeliers and everything, but to not touch it,
I think this is a very heavy decision in the process. So there was work on the outside done
as well. All the stones were dark, very dark, because they were not cleaned for 140 years.
All the ceramic tiles copies the Toscana Firenze architecture, and these painted elements
were missing there. It's full of bullet holes. Never forget, the war happened on the boulevard,
of course, to do a unified stone appearance. It's hard work, but I think the ceramic tiles to copy
it, to put back, I think this is crucial. Because if you see outside the building when you arrived
in the evening, all these openings attract you to step in. Anka, oh my goodness, we're backstage.
I work here as a Chief Architect and Facility Management Director, and now we are in the
main stage of the Opera House, and there were two major parts of the renovation. One is the
renovation of the public spaces, and the other one is the renovation and modernization of the
stage technology and the backstage area. So this is a cross-section on ArchiCAD of the Opera House,
and what's all the orange? The orange parts are all the new parts, so everything is orange,
it's completely new. You're kidding. So these are the elements which is important for the fine
tuning of the hall. In 1910, they changed the original wooden elements to steel. Ah, so you
converted it back to the original wood. To the original structure, and we don't do the fine
tuning only on the auditorium, but on the pit itself also. We can raise up and sink down the pit as
well. We could link the understall zone with the pit, so the fine tuning of the hall happens
day by day. It depends on the repertoire. Mike, would you like to come out to the most interesting
part? You're kidding, onto the stage? Yes. Look at this, my goodness. I want to break into song.
Please try. Yeah, I don't think I'm worthy. Okay. So, I mean, this line here, isn't it, is a very
important moment for you, isn't it? It is. It's the most important line, because we are in the middle of the
building, in the borderline of the public space, the auditorium, and the backstage, the main stage.
So one third of the renovation was the public spaces, and the other two third was this backstage.
Wait, really? Did I hear that right? So only one third of the renovation concerned this area? Yes.
And two thirds was back here? Yes. Before, there was very old and noisy stage technology, so it was
time to modernize the stage technology. This was a complex and an enormous renovation, and to borrow
from Gabor's analogy of fine tuning, yes, the acoustics, but actually it was about fine tuning
this entire instrument, this one third, two thirds that makes up the Hungarian State Opera.