How to Build a Deck Over a Concrete Slab – The Right Way!

Dave Does Carpentry
1 follower
2 Video Views·Nov 17, 2026
In this video I show you how to build a deck over a concrete slab, even when you don't have much height to work with.
This video goes through the entire process of building a deck, from construction the subfloor, to laying and screwing off the decking boards.
The decking I used in this video is 140mm Merbau.
These videos are for inspiration and entertainment only. Building methods, codes, and safety standards vary, and errors or omissions may occur. If you choose to follow anything shown, you do so at your own risk. Dave Does Carpentry accepts no responsibility for injury, loss, or damage resulting from the use of this content. Always use proper safety gear and follow local regulations.
Okay so today I'm going to be building a deck over
this concrete patio and it's actually going
to be a bit of a fun project. I'm going
to take you through the entire thing, show you everything
I do to build it. The reason it's going to be a bit exciting
though is I'm actually doing this at
my sister's house. She's away for the weekend
and the goal is to quickly build this entire deck
and have it done to surprise her when she comes back.
So our deck that we're building is going
to be three by five meters following the concrete here.
We're going to have the boards running this
way parallel with the house and I also want to frame
and install a picture frame border around
the deck.
Now the biggest issue we're going
to have with this build is the height.
So we want the decking boards to finish flush with the render,
so it's a gradual seamless finish like that.
Obviously to do that, we're going
to have our joists 20mm lower than that.
The boards are 20mm thick.
You can see we don't have much room underneath these joists
to really connect them to the concrete.
Now that shouldn't really be an issue for our first bearer here.
The way I'm actually going to build
this is we're going to have a few bearers
and joists running in between them.
We'll get to that later though.
But for our bearers sitting in the middle of the concrete,
I'm going to be using these small foots
this is from Eurotech I've never used them before
but the way these are going to work
is we bolt them onto the concrete like that
and I can twist this to change the height slightly.
For now though we're going to get started with this whaler.
All right so I'm going to put two 10 mil packers on the top here.
This is going to be the thickness
of our decking board so I want that to line up
the top of the render and just to make it easy
for myself I'm going to pack underneath this.
And I'm just going to get this in the right spot too.
I want to be 65mm back from the side of the window,
which is right there.
What I'm going to be doing is having another bit of 90-45,
like that, running through the outside.
And then the 20mm decking board screwed to the face of the deck.
So that way the end of the deck is going
to line up with the edge of the window here.
So I've got
the points good
with the window there.
That's where we want the deck to finish.
That's the point I want to start from.
And now for the rest of the deck, we want
to make sure everything's level and matches up with that.
Alright, so the way I'm going to be building this deck
It's going to be unlike anything I've done before,
and the main reason for that is firstly
the height we're restricted with, and the second reason is for cost.
The way you normally build a deck
is you'd have bearers like this running one way
and then you'd go through with your joists
and then sit on top of the bearers
and then fly through at the top.
Bearers are to strengthen everything, hold everything up
because if all you did was joists,
the amount of posts you'd need
to support the joists to the ground
would be way too many and it would cost way too much.
I've got the same problem.
If I wasn't gonna have these timbers running this way
and instead all I did was having my joists
running across here,
I'm suddenly looking at buying a lot of these.
These are about $10 each.
I've only had to buy about 10 to do it the way that I want to do it.
If I was going to buy these for all
the joists running through that way,
I think I've got about 15 or 16 joists in total.
I'm at least going to need two per joist,
so suddenly we're looking at around $300.
So we'll sit up and start doing this one in a second,
but what I will be doing is having my joists butt into those,
and we're going to be putting joist hangers on there to support them
to make sure there's no sag and that they are held strong.
So I do want to get a couple parallel measurements,
and we'll see if this slab is parallel off the house.
So on this side I've got
3035 and for this side we've got
I've got the same, so that's good, 3035.
Now for the outside of the deck,
I don't really wanna have these right at the very edge.
Even if I have them running this way,
those two holes are gonna be too close
to the edge of the slab,
and the slab might crack, it might break off.
I just don't think it's a secure fix in.
So instead of having this last bearer at the very end,
I'm gonna pull it in 65 mil,
which is 20 mil for our decking board,
and I'm gonna do another 45 mil block
on the side of our bearer,
just to push it over a little bit.
So what I might do then is if I go 65,
And the other side of that is 110.
That is going to be the line of my outside bearer.
So then I'm going to flick that line
and that's going to be where these footings go.
So I'm going to mark where that goes
and I'm just going to get a measurement of the house,
which is 2925. That's right there.
And then half of that is 1462. And I'll
also mark that because that'll be our line
for our bearer running through the middle.
So we're ready to start screwing down our base plates.
One thing I need to think about though
before I go through and screw them down
is to actually set up what these heights are going
to be. If I just went through now
and screwed them all down and decided to turn them later
for the heights we've got this little tab
on the side where I'm going to screw through into
the bearer to lock it in place
and depending how far I want to go for the height is going
to change where that little tab is.
Obviously I need all these tabs to be lining up in a
straight line because our timber is going
to be running in a straight line.
So I'm going to have to get the first one at the right height
and then play around with all of them,
twist them around so they're the right height,
and then depending where I twist them is going to show
us where these holes are going to land on the ground
for us to screw them down. This is actually
going to work out quite easily because I've got
those window packers there. I'm going to set the
level on those window packers, put it on the cap over here,
and I can check that for level. So I've
twisted that until it's the right height.
We can see that's pretty much level now. And now that
Now that I've got that good, I'm going to take the level off.
Turn that cap around. I'm actually just going
to put it there. I don't want to screw down in the
expansion joint of the concrete
and I want to line this tab up here with that chalk line that we
stick through before. Another thing that I'm going
to do is I'm going to have one tab that way,
the next little tab that way,
and that's going to help lock our bearer in place. We don't want
them to all be the same way because
then that bearer could slightly twist back and forth.
If we go, if we alternate which way they're
facing, it's really going to lock it in
and offer no movement
in that bearer.
That is secure.
That is locked
in place.
And for this next one, I can obviously
level off the one we just put in.
So I'm going to do that to start with. It needs to go down a fair bit.
But what I also want to do is keep referring
to other fixed points we have,
such as these window packers.
What could happen is I could keep going off one point
to the next point to the next point
and if I get them slightly at a level between one
and then do the same thing on the next
one the deck can start to slope away.
So I keep going through and checking off
multiple fixed points we should be alright.
In saying that though we just did reach a new problem.
So this concrete slab isn't built level
you can see we have a drain there.
So that's obviously a higher point over here flowing down to the drain.
So that one's one of the lower points that's why
that one works so well but as we start
We start to move away from the drain and the concrete gets even higher.
We've got to this point where this is wound down the entire way
and it is still high it is at a
level. It is out by about five mil
so what we're gonna do is just screw this one in place and when
I put my bearer down I'm gonna mark the bearer
and do a check out of five mil for it to sit down
five mil
lower
on this
single one.
Here comes the
around all
bolted
down
and now I
should be
able to sit
the bearer through the middle of them like like that.
So obviously we can see it's not
It's not completely level.
I do need to do a few checkouts on this.
What I'm going to do to make it easy
for myself is actually use a laser.
It's just going to be a lot quicker, but I'm going to set up the laser,
work out the height from the green laser line to the plate here,
and then work out the differences in the rest of them.
And that difference is going
to be how much I need to cut out of the timber.
If you've only got a two meter level, you can do the same thing.
It's going to take a little bit longer, a bit involved,
but you can go through your level. I'll hold this up.
to whatever it needs to be but i've got
that level there i can measure that
and that's actually about eight mil i need to take out
i'm just gonna set the laser up here that is on
and level is gonna be 143 to the bottom of the line that's an
eight mil there but having that laser makes that step a
lot quicker and easier now i'm just going to sit this back in
place and i'm just going to go through and mark where the footing
Starts and finishes.
So I can do my check out from one side to the other,
I'm not checking out any more of the
timber than I don't need to and then it's going
to be completely level once we drop them in place.
But we should
be able to lift
this on and
this should be
perfectly level,
that is perfect.
And the next thing I'm going to check
is make sure it is level across this way too
and that is exactly what we want to see.
You can see we've got that little rock in it still,
we're going to get rid of that as soon as we screw through
into these brackets and then obviously
once we go through into our joists in between here too it
is also going to lock everything in place.
Alright, so now we're ready to go through
and just smash out the subfloor.
I've got some timbers over there and I'm just going to be cutting the
joist in to go in between these bearers on this side and that side.
While I'm putting them in I want to make sure I get
a measurement of the overall and I want to
center all my measurements from my joists
so they're even because these joists are going to
be where the screw lines are. I need to make sure they're even
the whole way through otherwise we'll
get to the end and if you have two joists close
to each other you're going to have two screw lines
close to each other that doesn't look too good.
So overall deck is going to be 20 mil back from
from there, which is 5-3.
5-3-65 I reckon.
To the end of this timber though we've got 5-3-15.
We'll go 5-3-15 divide 12 and that gives us 4-4-3 spaces.
So this bit's pretty straightforward.
I'm just going to mark out where all the joists go.
I'll mark across 4-4-3 in all three of these bearers
and then we're just going to measure
and cut and put the joists in between.
I
actually
almost
made
a
bit
of
a
mistake.
I picked it up on it just before it was too late.
In this box I've got joist hangers.
We're going to be throwing joist hangers on every single one of
these joists and they sit under the joists.
I'm going to put little nails in the sides of them
to hold them to the bearer and that's just going
to mean that over the course of time people walking,
jumping, whatever they're going to do in this deck,
these aren't going to sag down. The issue is though
I might almost be right with some
of these ones here. No, I won't even be.
The issue is once I've gone through
and screwed it off I can't get these on underneath.
So I've only done a few screws for now.
I'm just going to quickly unscrew them.
And I'm just going to go through places
where they need to go underneath the joist.
Then we can screw them off and then go
through and nail off these hangers.
And I think I've screwed up
a bit by doing this.
But I've decided to get clouts and hand nail these hangers off.
By the time I hand nail all these hangers off and do that side too,
that's going to be the day done.
And I'm suddenly going to be struggling to get
this deck done before my sister gets back.
The reason I decided to hand nail them
is normally I'd always say using a coil gun or a PPN
it's going to be a lot more efficient
because you're going to be spending less time doing it
meaning you're not paying for labor
and the job is actually going to be done for a bit cheaper.
coil gun i could still do that for a cheap price here
um i'm not really the biggest fan of the
coil gun though i either prefer the PPN
which is a gun that shoots nails directly in the hole or
if i have to hand nail in them. for this job
i'm obviously doing the labor for free
so the only prices we're looking at is the cost
of materials. getting a box of these clouts
is going to be a lot cheaper. I actually don't know what they cost.
I'm guessing like 20 bucks at the most compared to a box of PPN nails
which you're looking at over a hundred dollars.
So we saved 80 dollars doing this.
It probably just means I'm going to be sweating,
working my ass off out here in the sun for about an hour
trying to hand nail all these
and getting them done today. It's 3 20 pm right now.
I've got only tomorrow to try to get this deck done
and it doesn't help that we started this halfway through the day.
Let's get to it though. We'll see what we can do.
So all of those joist hangers are done
and it's a pretty good start on the subfloor.
We still got a bit of work to do.
We're going to finish off the ends
and especially because they're doing that pitch frame
I spoke about,
there's a little bit more framing involved.
We'll get into that tomorrow.
Tomorrow's going to be a massive day.
If I did start this day in the morning,
I think we actually would have got a few boards down today.
This went up pretty quick.
I'm happy with the progress on it.
Tomorrow I'm going to have to run out,
get the decking boards as well for this job.
Since it was so last minute
and I'm trying to do it as a last minute surprise, nothing
was organised, meaning that for all the timber,
I'm going to have to run off, load it up in
my car, get all the decking boards here tomorrow.
Tomorrow's going to be a bit of a push.
Even if we don't get it done tomorrow though,
I'm just going to keep filming the entire
project and show you guys this entire job start to finish.
Alright, so it's 6.30 Sunday morning.
I'm up nice and early and honestly if I spent all day
on the deck today, I think we'd get
pretty close to getting it done and surprising my sister.
Unfortunately though I didn't have this planned out, the weekend
wasn't free and I decided this summer to try to race some triathlons.
So I've got a race this morning that I've got
to go do and the goal is to get the race done
as quick as possible so we can finish that,
get back to the deck and try to get it done.
Done.
Alright so the race is done,
it's just past 11 now so the goal is to go home.
I'm going to run to Bunnings,
pick up all the decking board, and look, the deck's not
going to get done today, the goal was just
to lay a few boards down, so hopefully when
my sister gets home, there's something there to surprise her.
Alright, so we're not looking too good,
it's 2.30 now, don't have much longer left in the
day, but we've still got to go through,
frame it up for the picture frame, and coat this
deck with bitumen paint.
So the way we've framed this is for our decking boards
to run this way, and we spoke about
this earlier.
I feel like that looks a bit too bland, a bit too boring.
So instead of having our decking boards run all the way here
and finishing in line with this joist,
I'm going to have one decking board on the outside going the other way.
This is going to be mated with the other board on the external side.
And we're just going to have a big square
or a big rectangle around the deck
and all our other boards are going to be inside of that.
Problem is, if we have one board going this way
and all of our boards are going to butt into that and join into it,
we don't have anything here to hold them.
So I'm going to have to beef up this end joist on both sides.
I'm going to get a bit of 90-45.
We'll put it on its edge like that.
Our decking boards are 140.
We're gonna be overhanging them 20 mil for that faceboard.
So that 140 is gonna finish pretty close
to the edge of this block.
So I'm gonna put that block in like that.
And we're also gonna put a few packers in place
and hold it off by about 10 mil.
And that means that our faceboard should finish around there
and then our other boards have something to be screwed into
with this block
here.
The last thing I'm gonna do
before we do start laying the decking boards
is just go through and cover the timber
with this timber protector.
With all the gaps in the decking board,
water is still going to get through, and even though
this is treated pine, this is made to be used outdoors,
if we have water get through the
decking boards and just sit on top of these joists,
over time they could start to rot.
Now putting this timber protector on is going
to make this deck last another 5-10 years
on top of what it would last already.
If you're doing this, I'd
definitely recommend
getting a brush.
I'm using a brush for any areas close to the render,
close to windows or close to a fence.
If I'm using the roller, there's a really good chance
that it could flick some of that bitumen
paint onto the render up here.
That's going to be exposed, that's going to be seen, and you're
going to have a nightmare if you try to take this stuff off.
I'm not too worried about hitting this
side here. There's going to be a decking board up
to that height where we worked off, so anything
down there with bitumen paint on it is going
to be covered. It's just if we go anything
higher than that, that's what's going
to be seen. Right, I'm about to make a tough call.
And I'm calling it a day right now.
So the subfloor is done.
We've done the bitumen coat.
And I've moved some of the decking boards to the back.
I still need to get a few more.
We've only got half the decking boards I need right now.
But it is 4.30pm right now.
And if I want to start laying decking boards in.
It means I'm going to get set up with a miter saw.
Start cutting stuff in.
And I don't think it's worth trying to get
a few boards down now at this time.
Starting at 1pm and 2pm on both days was never going to be a good idea,
so I think the surprise is off the table
but I'll be coming back here for one day next week
and we're still going to continue on with the deck
and I'll take you through everything we
do to finish this deck off. Alright so we did fail with that surprise,
I didn't get anywhere close to finishing the deck off in time.
Surprise is ruined, we didn't get the deck completed
but we're still going to go through
and finish it off now though. So we will start going through,
I'll screw down as many of these as possible
And then we're gonna have to take a break,
go to Bunnings, get some more decking boards
to finish it off.
First thing I wanna do though is,
we might grab this one.
This looks like the longest one here.
And I actually wanna start building this picture frame
before I do anything else.
I do wanna start with a full board against the house.
By full board, I mean full width.
With the size of this deck,
it's gonna be quite possible,
when I did measure it,
I think it is gonna happen
that we will need to rip one of the decking boards
to make the overall size work.
I don't want to have the picture frame ripped,
so we're gonna have this a full thickness board
and there's a chance it might be a small board next
to it once we get going with the actual
regular boards in between.
And for this one as well there's two ways we can do this,
there's probably only one way that's
right though. The first way is we can
just go through and push it hard
to the rendered wall and screw it off that way.
The issue doing this is that I'm looking at this right now.
It doesn't look straight.
Nine times out of 10, your rendered wall
isn't going to be perfectly straight.
So if I push it hard to there, what I'm going
to have to do afterwards is start creeping
all the gaps as all these other decking boards to try
and make it all straight and parallel.
I think the best way to do this first board
is I'm going to flick a line through here
and just pull it out and make this one straight even
if there are small gaps between the decking
board and the house. I'm going to aim for roughly five mil
of a gap the entire way through so if it
does come in and out a couple mil here
and there it's not going to look too bad. So the decking
board is exactly 140 so I'll butt on to the render
and I'm going to mark 145 and that gives us that
five mil gap. So I'm going to jump in and start tacking
this faceboard off straight away as we go.
All right, so I wanna pull her over
so we can see that chalk line going the whole way through.
And then I'm just gonna use a bit
of an off-cut board here too.
We want that to be sticking past.
And for the long point of this faceboard
to be sticking past the frame by 20 mil.
And this is for our faceboard.
Once this is done, our deck's gonna be hanging over
by 20 mil.
We're gonna have a board like this one here
on the face of the deck, hiding the side of the subfloor.
So for this one, we are gonna go about here
and I'm just gonna go and do the first screw in there.
We're just gonna leave it for one screw for now,
and I'm just gonna work my way down,
going every second joist for now,
and we're just gonna work on getting this board straight
with our
chalk line.
Now, the reason I'm only doing one screw per joist
and every second one for now
is that if we did two screws next to each other,
it's gonna be a lot harder to pull that decking board
back in, and most of the boards I do have here
do have slight bows and warps in them.
So I could actually go through
and screw this completely off now.
I'm gonna leave it for the second.
I just wanna make some more progress
getting this pitch frame done,
and then we can go through and screw everything off.
You know this is my first time using the AEG miter saw.
I love it because it's so small and easy to
move around but since we're using such wide 140
millimeter decking boards I think the bigger 305
millimeter blade might
be better so I'm going
to switch this over for today.
So for the first board
we did I'm going to get my speed square
to 45 degree angle I'm going to use that there to mark
the line and then that way that screw is going
to be lining up on the same 45 degree following that
same cut line through there
and to get the same places on this board here I'm just going to get
Speaking of a speed square.
Flip it around the other way.
I'm going to go back in a 45 degrees this way.
Then I can mark out exactly where that line goes
and screw this one in right here.
Screw that one
in and we'll do the same
thing over here.
Mark where that one goes up there.
And for this outside board,
I don't need to worry about doing a flick line
the whole way through.
I did screw up the subfloor when I was making it.
So what I'm going to do now is get my ruler.
I'm going to measure that 20 mm overhang
coming out this way.
And wherever I go through to screw it,
I'm going to make sure we get that same overhang
from the edge of the subfloor.
And I can just screw it off there
and I know it's going to be straight.
On two screws
so far.
I still just want to double check my work though.
So I'm just going to 345 this
and triple check that it is square.
So we're pretty good there.
And yeah, we're right on 23.
Works out pretty well I'm happy with that.
I do just want to quickly double check that this one
is straight and yeah she's looking great that's good.
Move on to the next one. Now for our outside
faceboard I'm not going to follow the joist
in these ones I definitely want to double check
measurement and flick a line from that first faceboard we did.
If this one was out slightly
you could potentially see it because we're going
to have all the gaps between our decking boards
and if it's out it means you've got to change
your gaps to be a bit bigger on one side.
Truthfully for a deck this size, three meters,
we could probably get away with it. If it was out
by 10 mil, if you add a mil per every single gap between
the boards, you can easily cover
that span and you won't notice it.
Regardless, we want to make it right though. So I'm going
to get a measurement from this side,
copy that measurement to the other side, flick a line,
and that's
going to be
where this
outside
faceboard
gets
screwed to right
So I'm
just going
through and we're just going to continue
the faceboards all the way to the end.
Obviously this side we're going to play around a little bit.
I'm just going to do a rough check out around all these pipes here.
There'll be a cover covering those so I can
be a little bit rough with those.
We do have a PVC downpipe here though.
That isn't going to be covered anymore
so I'm going to try to do as neat as I can.
Do a nice check out around that.
I don't have any hole saws with me at that size.
So we're just going to have to try to do it
by hand with a jigsaw and see how it turns out.
So doing a check out around the pipe,
the first thing I'd want to do is get a hole saw bit,
drill the hole decking board.
I don't have a hole saw bit with me at this size.
So the second thing I'd try to do is find an off cut
of the same PVC pipe.
You just place it on your decking board and trace it.
But I don't have that either.
So what we're gonna have to do is try to scribe
and work out the size of this pipe.
I'm going to do this on an off-cut piece of decking board,
hopefully get it perfect,
and then I can copy this over to the main piece,
trace this little practice piece,
and then that way I know I'm not screwing up
a full length of the decking board.
So I hope this idea works all right,
but I'm just going to drive a nail
into the center of the board.
It's about 100 mil.
We're going to make it 110.
I want a 5 mil gap all the way around the pipe,
that same 5 mil gap that we're going to have everywhere.
So half of 110 is 55.
My goal is if I just hook my tape on like that there,
I'm just going to try freehand,
follow 55 on my tape,
As it spins around in a circle.
Alright, so we do have a circle there.
It's not completely neat.
What I'm gonna do is cut this board directly in half
and just follow the line and try to smooth it out
while I cut it and try to protect that circle.
That's
a
rough
draft.
Let's try it out.
Alright, so I don't know how that's happened.
It's actually worked out.
Pretty great, if we wanted it to be tight.
We do want that five mil gap the entire way around.
And you can see, yeah, we need to go
just a few mil wider as well.
So I'm actually pretty happy with this template.
We're gonna use this, and what I'll do is I'll trace it
onto the proper board, and we'll just go through
and just make that line about five mil wider.
I'm gonna take it, it's not perfect,
but it does work out all right.
I know some people love having
their decking boards go hard up to the pipe and I do think
that looks better but you just always want gaps
around anything like this for movement over time.
You don't want to have your decking boards hard up to the pipe
and for them have to move around
and influence or even crack or weaken the pipe over time.
I'm happy with that we'll screw this
one off do the same over here too.
In case you're looking at this too we do want to get a couple
more trimming pieces in here to help support
the edge of these corner boards too.
I used every small offcut I had the other day to try
and make something work, but we were short.
So when I do go to get more decking boards,
we'll get some more pieces of timber and we'll make
this a bit more solid before we screw off all the other boards in here.
Alright, so we've got three sides of the picture frame done now.
I've extended both of those sides all the way to the end.
Still need to go through and screw them off, but we will do that later.
I'm going to leave that 5 mil out.
The reason for that is we're going to start filling
in the deck now and it's going to be a
neater finish if I run all the boards longer where
that picture frame board is going to go
and I'm going to track saw to do a really nice clean cut
at the end there. For now though I want
to start working out the spacings of our boards in between here.
So we have in between the picture
frame 2756 and that should actually be exactly the same
the whole way through now. 2756 yeah that's good.
So what I want to do is find out how many boards
are going to fit in the spacing.
And I also want to work out what the spacing
between the boards are going to be.
I normally aim between 4 to 5mm,
but if we can make it slightly bigger or slightly smaller
and make four boards work the entire way, we'll definitely do that.
So to start with,
I'm going to be doing 2756 divided by 140 for the board plus a 5mm gap.
So divide it by 145.
And that gives us 19.00.
Pretty damn close to full boards.
One thing we actually do want to do is if I get that 1,
4, 5, we times that by 19.
That gives us 2,755, which is almost exactly what we have here.
I also want to add another 5 mil
because we're accounting for a board and a gap.
Obviously, on the other side, though,
once we do our boards and our gaps,
we're going to have one more 5 mil gap towards
the outside of the overall measurement.
That gives us 2,760, so that means I'm probably going
to be doing roughly 4.8 mil gaps,
and that means we're not going to have any rips at all in this deck,
and it's going to be full boards the entire way through.
All right, so now that we have our spacings,
we can start working out our bays.
The way you should always do a deck is by doing
your boards in individual bays. You shouldn't go
through cutting every single board
and then try to go through five mil spaces the entire way through
because they can kind of gradually grow
or shrink by a mil here and there. You don't want to get to
that last board and have it running out.
So we are going to be using those one four five spaces
meaning we have five mil gaps between our decking boards.
On that last bay we might need to play
around with it slightly to make it work
but what I'm going to do is mark a line and flick a line
line for every fifth or so board.
We're going to flick those lines perfectly straight,
screw those boards down completely off,
and then we'll go through and fill in small sections
of only four boards at a time.
So 145 times four, that's going to get us 580.
I'm just going to mark that there.
I'm just going to flick this line.
So now what I'm going to do is cut decking boards
following this chalk line the whole way through.
We'll get that one nice and straight,
and then I'll measure off that one for our next board over here.
We'll flick that line, do the same thing,
and we'll do all of those all the way through our deck
until we've got our base ready to go.
40.
Go there.
And we do want five mil gaps everywhere.
So I'm gonna put a packer in there
and that's gonna hold it exactly where it needs to be.
Actually, I almost made a mistake with that one.
I'm gonna have to re-flick this line.
So what I did was one four five times five
but I forgot to add another five mil for this first
little gap we have in here.
So one four five times four that's what we did here it gives us 580 and
I want to plus another five mil which gives us 585
and that means our first board also has that
five mil gap and by the time we get
to our last board here there'll be a five mil gap before we
have our bay board. All right so I'm glad I picked up
on that what I'm going to do is get another
five mil packer and I'm just going
to pack it across to that chalk line we flicked.
It just saves us running through and flicking another chalky.
The bay
boards
are in.
That M1
was a
nightmare.
It was completely bowed. A lot of these
decking boards are actually going to be
pretty hard to deal with. I got them from Bunnings. I think I spoke
about how I got screwed over a little
bit trying to get the materials here.
And these are the last that were on the shelf.
So it's going to be a bit annoying for me to straighten them.
So we are pretty much ready to start cutting
in the majority of the deck now
and cutting in these bays.
Before I do that, I do want to finish screwing these off.
We've only tacked one screw here and there,
same as these first boards here.
And the reason I did that is I want
to go through and flick a straight line.
I do want to add as well, if you are building the deck,
the reason I'm going through flicking these lines down
and screwing everything off now before I put the bayboards in,
because if we did put the bayboards in, it means I could just flick
the line over everything and screw everything off at one go.
The reason we're doing this now
is I want these boards to be screwed off
and extra strong. Once we put our bay boards
in here we'll get to the process
soon but I will be putting wedges in between the boards
hitting them pretty tight to make sure the gaps are even and that could
actually force these boards out if they're not completely screwed off.
So that's what I want to go through make
sure I screw these off completely before
we start filling in the bays. Alright so I'm going to go get the rest
of the decking boards and we're just
going to start cutting in and laying out
the entire deck.
The process now is I will go through,
lay out all the decking boards and then once that's done
we'll come through. I'll show you the little
tricks we use with the wedges to make sure the
gaps are all even but then I'll go through
and screw everything off. The only issue is where
I'm working right now I don't have much room
to work with so I don't think I can really bring
all the decking boards in here at one go.
I'm going to have to try to work out a bit of a
pattern on how to do this.
Bring some boards in from the front, cut them and lay them in
straight away so they stay out of the way.
The two things I'm thinking about
while I'm laying this deck is firstly wherever I have a join,
I want to make sure that the decking board next
to it is at least two joists away from that join
and I've also got at least two decking boards on the same joist
before I do a join on the same joist.
Doing a deck like this is a pretty standard practice,
that's how everyone I work with does it and the main reason you do it
is just for neatness. It starts to look pretty ugly
if all your joints start to go around the
same places. So one thing I will be trying
to do is get a measurement. It's about 2,990 there
and I want to cut as many boards
at that same measurement just to minimize time.
I've also made this deck a bit tricky for myself.
What I should have done is just
gone through and done all my starting bay boards
at the exact same measurement.
I didn't have many to choose from from here,
and I just chose some of the longest ones.
I've got two next to me here, they're the same size,
this one and the far one's the
same size, and that first one's a bit smaller.
It just makes it a bit awkward now
because in between every single bay board, I've got
to do different patterns to work
my decking boards to make those rules work.
For these two bays anyway, since I have done
the same board, it means I can do the same
patterns in between both these decking bays.
If I did every single bay the same, which
you probably should do when you're doing a
You can get one measurement for your first board,
cut it through four times to every single bay,
get your next board and do the same thing.
Just makes it a bit easier to go through to the stage,
smash out the pre-cut without having
to think about where your joints are going to be
and thinking about in the future too
to make sure your boards are still going to work
full
lengths
without
having
those
close
joints.
All right, so that's the cut and done,
and I think that's probably the most accurate estimate
I've ever done on materials.
So we've got three lengths left.
I'm gonna be using one of these for that last board
for the picture frame, running through that way,
and the other two are gonna be for a faceboard
along the side of the deck there.
All right, so we're gonna jump in
and start screwing off the deck.
Two things I've got with me
is firstly a pack of 5mm packers.
I wanna do the same thing with every single board
that we did with these bay boards,
and just put a 5mm packer in here.
and make sure we have that exact five mil gap off
the face board here, the perimeter board.
The other thing I've gone through
and what I've done is cut about 10 of these wedges and these are going to be
super important in making sure all these boards
are straight. To make it easy we're just going
to focus on one bay at a time.
What I'm going to do is push these boards forward until we get one
of these five mil packers in there
and then the next thing we're going to do is get these wedges
and start focusing on opening the gaps in these boards.
One thing we can probably notice is
The gaps change massively from this point here to that point.
That's because all these boards are twisted, they're bowed.
So whenever I go through,
straightening the boards like this,
I'm going to put the wedges in at one point here
and also move over to joists
and put the wedges a bit further down too.
I'm actually trying to get these portions of the boards quite straight.
So at this point, I'm just going to run my eye over everything.
If there's a bigger gap here, I can loosen this wedge
and hit whichever wedge has the smallest gap.
I always want to make sure I put the wedges in,
we get the gaps right,
and then I'll go through with my chalk line
and then we'll flick the line of where I want to pre-drill them.
The reason I do it this way is that when we
do pre-drill all these holes,
That drill bit is gonna go into the joist
and it's gonna make a pilot hole for that screw to follow.
If I went through and pre-drilled it first
before getting it straight,
that screw could veer off course into that pilot hole
that I've drilled before getting the boards right
and it could try to warp the boards out of being straight.
Also, you wanna make sure you're using a blue chalk line.
This one's a messy one,
it's dropping blue chalk everywhere.
But this blue chalk does rub off.
If you're using black chalk or oxide,
that's gonna stain your deck
and you won't get rid of those lines.
I'd go through and completely screw off
both of the joists where I had the packers in.
And I've always skipped one in the middle.
Normally that one should be straight.
I'm still gonna run my eye over it.
Actually, this could probably do it
with a little bit of love.
Only if the boards are really warped,
we have to go through in this in-between stage
and put more wedges in.
Normally, if you get this joist, the next joist straight,
your boards are gonna be straight in between.
I think I might have to do a bit of this for this deck,
though,
with just how rough and
bowed the boards were.
I did mention before,
When starting off my deck I normally just do one bay
and I'll do the bay all the way through to the end.
Probably doesn't really matter which way you do it.
Out of habit I've always just gone through though
I started off every single bay,
got the first few joists screwed down so the whole deck is started.
If someone's cutting in boards too it's easier this way
because then they know that first row
is good where it has to be and if the deck's
longer than what it is here and someone's cutting
in front of you they can always butt the boards up
to the board laying down knowing it's exactly
where it needs to be. So I'm just going
to go through and finish screwing this off.
And then I can focus on one bay
and just take that down all the way to the end.
You're probably also noticing how much of a nightmare this deck's been.
I'm having to get the clamp out,
I'm using so many wedges trying to get these boards straight.
Normally it shouldn't be the instance,
if you take your time make sure you get really good
decking boards. The time of the year that I'm building this though
and the last minute decision
to do this meant I didn't have many options on materials.
I had to buy the last stuff on the
off on the shelf, get all the warped bowed boards that are left behind.
Still going to make it straight, we're still going
to make it look good.
It just means it's going to take more time and be a bit more
of a nightmare trying to get all these boards straight.
It's always
a bit slow
and a bit
of a struggle
to start with
because we do have to do those two rows
of the wedges to try to get those boards straight.
Now since we've got a start, I've got
this line here which is a fixed point.
This side of the board is completely straight.
So now when I'm coming over here,
all I have to do is one row of those wedges
and it's just going to stiffen up those boards
and it's going to make it a lot easier just
to start flying through this deck now.
All right, so we're ready now to get the track saw
and cut off all these boards in a straight line
and get the last of the picture frame done.
I've actually just recently got a new track saw.
We're gonna be trying out Milwaukee's track saw
to do this cut, but what I wanna do
is go through with a chalk line,
mark exactly where I want these boards to be cut off,
then we're just gonna line it up with a track,
go through, cut as much as we can,
and
finish
it off
with a
multi-tool.
All right, so the last thing we're gonna do is,
I've ripped down a bit of the Merbau,
and I'm gonna be using this as a faceboard.
So it's gonna go on the side of the subfloor here.
I've ripped it down so that it's not gonna have
contact with the ground, and what this is doing
is just covering the side of the deck,
which you probably won't see anyway,
but in case you're standing back against the fence,
it's just covering the side
of the subfloor there.
I originally was going to pack this out so that the faceboard
was going to be flush with the edge of the top board.
But I actually prefer the way it's looking right now.
I actually like it with the top board running out past,
and it's going to be a bit of a shadow.
The top board's going to stick out past the faceboard, and it gives it
a bit more of that floating feel, a bit more depth to the deck.
So the deck's all done.
Obviously, the surprise didn't work out too well,
but we did get there in the end and got it finished.
I've just gone through, hosed it down, and cleaned it off.
The deck still needs to be stained, but I'm not going to be doing that.
My sister's going to be doing that in a week or two.
You want to stay on top of it because I've done
so many decks over my time and the clients
haven't gone through and stained them
and the decking boards just don't hold up.
But anyway, there you go, that's how you build
a deck over a concrete slab.